Alena Residency Commercial

By Hemant Vinaykant Parikh

RG-MH-38827 · RERA P51800009289 · Last updated on MahaRERA portal: 15 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Alena Residency Commercial is a Others project by Hemant Vinaykant Parikh in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009289 on 22 Aug 2017. Possession is promised by 1 Dec 2027.

At a glance

Project

  • NameAlena Residency Commercial
  • TypeOthers
  • Location
    • Borivali
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009289
  • ReraGenie IDRG-MH-38827

Builder

  • NameHemant Vinaykant Parikh
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion1 Dec 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Alena Residency / CommercialNA460000
Shivaji Nagar CHS/PAP - Residence - Commercial - Sale/ Rehab Composite - 1NA230000
Shivaji Nagar CHS / PAP - Residence - Commercial - Sale / Rehab Composite - 2NA230000
Sukhshani CHS / PAP - Residence - Commercial - Sale / Rehab CompositeNA230000
Vighnaharta CHS / PAP - Residence - Commercial - Sale / Rehab CompositeNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 15 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

Alena Residency / Commercial0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Shivaji Nagar CHS/PAP - Residence - Commercial - Sale/ Rehab Composite - 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Shivaji Nagar CHS / PAP - Residence - Commercial - Sale / Rehab Composite - 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sukhshani CHS / PAP - Residence - Commercial - Sale / Rehab Composite0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Vighnaharta CHS / PAP - Residence - Commercial - Sale / Rehab Composite0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,012 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shivaji Nagar CHS societyBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI31710.0
Proposed, not sanctioned15,943 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGarodia Nagar Ghatkopar East Mumbai 400089

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHEMANT PARIKH & ASSOCIATES
EngineerMAHIMTURA CONSULTANTS PVT LTD
PartnerRole in project
Hemant Vinaykant Parikh-

Litigation declared2

CaseCourtStatus
228 217/2017HIGH COURTPETETION FILE
1481/2017Court of sessions for Greater BombayCase disposed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2027

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: shivaji_nagar_chs_compressed-1.pdf15 Feb 2025
Certificates of CA (Form 3)File: Form_pdf_628161161221024 HEMANT PARIKH_compressed.pdf15 Feb 2025
Building Plan Approval (IOD)File: shivaji_nagar_chs_compressed-1.pdf15 Feb 2025
Certificates of CA (Form 5)File: Alena Form no 5.pdf26 Feb 2024
Certificates of CA (Form 3)File: FORM 3 ay 21 22.pdf29 Jan 2023
Details of encumbrancesFile: form-3 encumberence AADPP2558B_Computation Sheet_1037639683(1)_09122021.pdf20 Jan 2023
Certificates of CA (Form 3)File: form3_alena ITR- FORM- HEMANT VINAYKANT PARIKH -2020-1.pdf20 Jan 2023
Certificates of CA (Form 3)File: form3 alenaITR Form AY 19-20 (Hemant Parikh).pdf20 Jan 2023
Certificates of CA (Form 3)File: form3-alena-(3) Form_pdf_888758900301222-1_compressed.pdf20 Jan 2023
Certificates of CA (Form 3)File: form3 (4) Annexure 2 HPA - Revised Balance sheet.pdf20 Jan 2023
Certificates of CA (Form 3)File: form-3 encumberence AADPP2558B_Computation Sheet_1037639683(1)_09122021.pdf20 Jan 2023
Certificates of CA (Form 3)File: form3ack_itr3_compressed.pdf20 Jan 2023
Building plan approvalFile: shivaji_nagar_chs-1.pdf14 Mar 2022
Building plan approvalFile: shivaji_nagar_chs-2-17-11-16.pdf14 Mar 2022
Building plan approvalFile: shivaji_nagar_chs-2-17-1-10.pdf14 Mar 2022
Building Plan Approval (IOD)File: shivaji_nagar_chs-1.pdf14 Mar 2022
Building Plan Approval (IOD)File: shivaji_nagar_chs-2-17-11-16.pdf14 Mar 2022
Building Plan Approval (IOD)File: shivaji_nagar_chs-2-17-1-10.pdf14 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form no 5.pdf6 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5 20-21.pdf6 Mar 2022
Certificates of CA (Form 5)File: Form no 5 Alena Residency.pdf4 Mar 2022
Copy of the legal title reportFile: Vinayak Realtors vs SRA APEX-12 of 2018_.pdf11 Oct 2021
Details of encumbrancesFile: Vinayak Realtors vs SRA APEX-12 of 2018_.pdf11 Oct 2021
OtherFile: Vinayak Realtors vs SRA APEX-12 of 2018_.pdf9 Oct 2021
Certificates of CA (Form 5)File: Form no 5Alena.pdf25 Jul 2019
Certificates of CA (Form 3)File: ITR V HEMANTA VINAYAK PARIKH.pdf25 May 2019
Certificates of CA (Form 3)File: ALENA 2.pdf17 May 2019
Certificates of CA (Form 5)File: ANNUAL REPORT ON STATEMENT OF ACCOUNTS ALENA.pdf17 May 2019
OtherFile: alena 1.pdf17 May 2019
OtherFile: Untitled.pdf17 May 2019
OtherFile: SHIVAJI NAGAR SRA ORDER.pdf12 Dec 2017
Building plan approvalFile: SHIVAJI NAGAR- IOA (1) (1).pdf31 Jul 2017
Layout approvalFile: Floor plan 2.pdf31 Jul 2017
Layout approvalFile: Floor plan.pdf31 Jul 2017
Layout approvalFile: REHAB typical floor.pdf31 Jul 2017
Layout approvalFile: STILT FL PAR 2.pdf31 Jul 2017
Layout approvalFile: STILT FL PAR.pdf31 Jul 2017
PAN CardFile: jpg-to-pdf.pdf31 Jul 2017
Copy of the legal title reportFile: pr.pdf31 Jul 2017
Details of encumbrancesFile: Encumbra.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Floor plan 2.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Floor plan.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: REHAB typical floor.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: STILT FL PAR 2.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: STILT FL PAR.pdf31 Jul 2017
Building Plan Approval (IOD)File: SHIVAJI NAGAR- IOA (1) (1).pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 Jul 2017
Declaration in FORM BFile: VINAYAK HP form b.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Attachement of Form No- 1- Alena rsz.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: vinayak realtor form 2.pdf31 Jul 2017
Certificates of CA (Form 3)File: vinayak affidivid.pdf31 Jul 2017
Proforma of Allotment letterFile: Attachment -AGREEMENT FOR Alena.pdf31 Jul 2017
Proforma of Allotment letterFile: Attachment - allotment letter draft.pdf31 Jul 2017
Proforma of Allotment letterFile: Attachment - allotment letter draft.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Alena Residency Commercial on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmAlena Residency CommerciCompleted 32Lapsed / revoked 28Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 151 registered projects within 2 km.

Builder: Hemant Vinaykant Parikh

Hemant Vinaykant Parikh has 2 registrations on MahaRERA, including Alena Residency Commercial and Adora Enclave Residency / Commercial. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Alena Residency Commercial is delayed beyond 1 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Alena Residency Commercial?

The registered promoter entity is Hemant Vinaykant Parikh, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Alena Residency Commercial?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Alena Residency Commercial?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Alena Residency Commercial?

The professionals named in the filing: Architect: HEMANT PARIKH & ASSOCIATES; Engineer: MAHIMTURA CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Alena Residency Commercial?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Alena Residency Commercial. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Alena Residency Commercial to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.