Red flags
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
AJMERA MARINA is a Residential/Group Housing project by AJMERA HOUSING CORPORATION BANGALORE in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/310125/007461 on 31 Jan 2025. Possession is promised by 31 Dec 2028. 148 of the 330 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAJMERA MARINA
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560064
- Pincode560064
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/310125/007461
- ReraGenie IDRG-KA-79928
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on31 Jan 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings4 building records
- Documents filed151 files
Current status
Figures as on 3 Aug 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| E WING | - | - | - | 83 | 0 | 83 |
| F WING | - | - | - | 82 | 0 | 82 |
| G WING | - | - | - | 82 | 0 | 82 |
| H WING | - | - | - | 83 | 0 | 83 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 18 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 80%.
Building: 20% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 80% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 50% |
| Retaining wall (All types) | 30% |
| RCC or MS Framed structure | 5% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRADEEP KRISHNAPPA | - | - |
| PRADEEP KRISHNAPPA | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 125.78 cr | Rs 31.33 cr |
| Sales & Marketing | Rs 19.13 cr | Rs 16.77 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 14.71 cr | Rs 86.17 lakh |
| Legal & Laisoning | Rs 7.37 cr | Rs 6.46 cr |
| On-site expenditure-Salaries of workers | Rs 7.36 cr | Rs 6.45 cr |
| On-site expenditure-Site Overhead | Rs 2.45 cr | Rs 2.15 cr |
| On-site expenditure-Consultants Fees | Rs 2.21 cr | Rs 1.93 cr |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JAMUNA CHALAM |
| Engineer | VINOD KUMAR R |
| Engineer | ISA STRUCTURAL STUDIO. |
| Chartered Accountant | NV RAMANA & CO |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00086/2026 | - | AJMERA HOUSING CORPORATION BANGALORE | 05/02/2026 |
Documents filed151
As listed on the registration, under the names the promoter filed them with; the newest 80 of 151 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/310125/007461 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Ajmera Marina Q1 for FY 2026-27.pdf | 3 Aug 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect Certificate-Marina.pdf | 3 Aug 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: AJMERA MARINA engineering As on.pdf | 3 Aug 2026 |
| Q1 2026-27 Water supply and sewage board | 3 Aug 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 3 Aug 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 3 Aug 2026 |
| Q1 2026-27 KPTCL- BESCOM | 3 Aug 2026 |
| Q1 2026-27 Fire and Safety | 3 Aug 2026 |
| Q1 2026-27 Labour and Education Department | 3 Aug 2026 |
| Q1 2026-27 Airport Authority of India | 3 Aug 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 3 Aug 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: AJMERA MARINA Form -4 Chartered Accountant_compressed.pdf | 21 May 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: AJMERA MARINA Architect (Qu).pdf | 21 May 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Marina CE Certificate as on.pdf | 21 May 2026 |
| Q4 2025-26 Water supply and sewage board | 21 May 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 21 May 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 21 May 2026 |
| Q4 2025-26 KPTCL- BESCOM | 21 May 2026 |
| Q4 2025-26 Fire and Safety | 21 May 2026 |
| Q4 2025-26 Labour and Education Department | 21 May 2026 |
| Q4 2025-26 Airport Authority of India | 21 May 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 21 May 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: AJMERA MARINA Form -4 Chartered Accountant_compressed.pdf | 26 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Certificate Mariina.pdf | 26 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Ajmera Marina CE Certificate as.pdf | 26 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 26 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 26 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 26 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 26 Jan 2026 |
| Q3 2025-26 Labour and Education Department | 26 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 26 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 26 Jan 2026 |
| Affidavit undertaking to preserve 0-05g of B karab in sno 9/2 permanently for public use and not enFile: AFFIDAVIT 1.pdf | 27 Jan 2025 |
| Amenities and Common area details certified by engineerFile: Area Statement.pdf | 27 Jan 2025 |
| renewed BESCOM NOCFile: BESCOM Affidavit 1.pdf | 27 Jan 2025 |
| SEIAA NOCFile: V_0_SIA_KA_INFRA2_494955_2024_98576907_-signed (2).pdf | 27 Jan 2025 |
| JAKKUR AIRPORT NOCFile: Ajmera Housing Jakkur NOC_241230_182003.pdf | 27 Jan 2025 |
| AIRPORT NOCFile: Ajmera Housing Airport NOC.pdf | 27 Jan 2025 |
| BSNL NOCFile: Ajmera Housing BSNL NOC.pdf | 27 Jan 2025 |
| PLAN SANCTION LETTERFile: AJMERA MARINA SANCTION LETTER.pdf | 27 Jan 2025 |
| SANCTION PLAN 1 OF 9File: 1 OF 9 SITE PLAN.pdf | 27 Jan 2025 |
| SANCTION PLAN 2 OF 9File: 2 OF 9 BASEMEMNT PLAN.pdf | 27 Jan 2025 |
| SANCTION PLAN 3 OF 9File: 3 OF 9 GF PLAN.pdf | 27 Jan 2025 |
| SANCTION PLAN 4 OF 9File: 4 OF 9 EF WINGS TYP1.pdf | 27 Jan 2025 |
| SANCTION PLAN 5 OF 9File: 5 OF 9 EF WINGS TYP 2.pdf | 27 Jan 2025 |
| SANCTION PLAN 6 OF 9File: 6 OF 9 GH WINGS TYP1.pdf | 27 Jan 2025 |
| SANCTION PLAN 7 OF 9File: 7 OF 9 GH WINGS TYP2.pdf | 27 Jan 2025 |
| SANCTION PLAN 8 OF 9File: 8 OF 9 EFGH ELEVATION.pdf | 27 Jan 2025 |
| SANCTION PLAN 9 OF 9File: 9 OF 9 SECTION.pdf | 27 Jan 2025 |
| RTCFile: RTC.pdf | 27 Jan 2025 |
| Authenticated copy of current year RTC for both no'sFile: RTC.pdf | 9 Jan 2025 |
| Authenticated copy uploaded EC from 1-4-2010 to till dateFile: ECC-09122024-7277097.pdf | 9 Jan 2025 |
| Undertaking to preserve 0-05g of B karabFile: undertaking for karab land.pdf | 9 Jan 2025 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed Land-Original survey sketchFile: ADLR Sketch.pdf | 9 Jan 2025 |
| Approved Original Single Plot layout planFile: DP.pdf | 9 Jan 2025 |
| Approved Original Single Plot layout plan work orderFile: DP WO.pdf | 9 Jan 2025 |
| Building License from Local Authority Original CopyFile: Construction Licence.pdf | 9 Jan 2025 |
| Demarcation of proposed land in Approved Master plan Certified by the concern authorityFile: Demarcation of project .pdf | 9 Jan 2025 |
| Demarcation of proposed land in original Village map certified by the concern authorityFile: Demarketion in survey sketch.pdf | 9 Jan 2025 |
| KSPCB NOCFile: 2-1 kspcb doc.pdf | 9 Jan 2025 |
| Updated area details are incorrectFile: Area Statement.pdf | 9 Jan 2025 |
| Yelahanka Airforce NOCFile: Jakkur NOC_241230_182003.pdf | 9 Jan 2025 |
| BESCOM NOCFile: 4BESCOM - NOC.pdf | 9 Jan 2025 |
| Please upload the Land cost calculation sheet as per the guidance value (self-attested copy).File: Land cost calculations.pdf | 9 Jan 2025 |
| legible copy of the sectio n 3(1) notarized affidavitFile: Section 3(1) Notarized Affidavit.pdf | 9 Jan 2025 |
| Demarcation of STP design drawingFile: Demarcation of STP.pdf | 9 Jan 2025 |
| RTC, survey 9/2 | - |
| Mutation, survey 9/2 | - |
| Encumbrance Certificate, survey 9/2 | - |
| Conversion/Alienation Order, survey 9/2 | - |
| Sale/Title/Gift Deed, survey 9/2 | - |
| JDA, survey 9/2 | - |
| Khatha, survey 9/2 | - |
| RTC, survey 10 | - |
| Mutation, survey 10 | - |
| Encumbrance Certificate, survey 10 | - |
| Conversion/Alienation Order, survey 10 | - |
| Sale/Title/Gift Deed, survey 10 | - |
| JDA, survey 10 | - |
| Khatha, survey 10 | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| AJMERA FLORENZA | AJMERA FLORENZA, SY NO 7/1,9/1 KEMPANAHALI VILLAGE,YELAHANKA HOBLI, BANGALORE NORTH TALUK, YELAHANKA, BENGALURU URBAN, KARNATAKA | Ongoing | Sep 2025 | Not delivered |
| AJMERA NUCLEUS RESIDENTIAL AB WING | SY NO 13/5, ELECTRONIC CITY PHASE 2, DODDANAGAMANGALA MAIN ROAD, | Completed | - | No date filed |
| AJMERA NUCLEUS C WING | SY NO 13/5, ELECTRONIC CITY PHASE 2, DODDANAGAMANGALA MAIN ROAD, | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep AJMERA MARINA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
Sattva Lumina
Sattva Resi Private Limited
Brigade Eternia
Brigade Enterprises Ltd
Nikoo Homes V - Phase - 1
Bhartiya Urban Private Limited
GODREJ AVELINE
GODREJ SSPDL GREEN ACRES PRIVATE LIMITED
ORCHID SALISBURY
GOYAL HARIYANA ENTERPRISES
See every Bengaluru Urban project, with the district possession charts
Builder: AJMERA HOUSING CORPORATION BANGALORE
AJMERA HOUSING CORPORATION BANGALORE has 6 registrations on RERA Karnataka, including AJMERA NUCLEUS PHASE 2 (RESIDENTIAL -C WING) and AJMERA MARINA. Its filings declare 18 earlier projects, 17 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if AJMERA MARINA is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of AJMERA MARINA?
The registered promoter entity is AJMERA HOUSING CORPORATION BANGALORE, a partnership firm as per the filing. Its GSTIN 29AAKFA5286R1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in AJMERA MARINA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AJMERA MARINA?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at AJMERA MARINA?
The professionals named in the filing: Architect: JAMUNA CHALAM; Engineer: VINOD KUMAR R; Engineer: ISA STRUCTURAL STUDIO.; Chartered Accountant: NV RAMANA & CO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AJMERA MARINA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback