Registration approved Mixed Development project

After the Rain- Phase 1

By Total Environment Building Systems Pvt. Ltd

RG-KA-85198 · RERA PRM/KA/RERA/1251/309/PR/171014/000483

Source: official RERA Karnataka filing

Red flags

  • 4 complaints at RERA Karnataka
  • Completion date moved by 34 months
  • 3 extensions taken

Clear

  • Separate project account declared
Apr 2022Possession promisedmoved 34 months from the original
4Complaints at RERA Karnatakaon this registration
Jump to the 70 documents Report an error

After the Rain- Phase 1 is a Mixed Development project by Total Environment Building Systems Pvt. Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/171014/000483 on 14 Oct 2017. Possession is promised by 30 Apr 2022. The completion date has moved by 34 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameAfter the Rain- Phase 1
  • TypeMixed Development
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/171014/000483
  • ReraGenie IDRG-KA-85198

Builder

  • NameTotal Environment Building Systems Pvt. Ltd
  • Entity typeCompany
  • CINU45202KA1996PTC020790
  • Authorized SignatoryUpendra Narayan
  • Other registrations4 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredOct 2017First promiseJun 2019Revised toApr 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Oct 2017
  • Promised completion30 Apr 2022
  • Revised completionRevised to 30 Apr 2022 (originally 30 Jun 2019)
  • Buildings13 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK 01-----6
BLOCK 02-----10
BLOCK 03-----5
BLOCK 04-----10
BLOCK 05-----8
BLOCK 06-----26
BLOCK 07-----4
BLOCK 08-----5
BLOCK 09-----6
BLOCK 10-----6
BLOCK 11-----8
BLOCK 12-----8
BLOCK 13-----4

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Ground Clearance-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities42

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesNoNot applicable
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
WATER TANKS, SUMPS AND OTHERYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area51,028 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 211.11 cr

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2019 → Mar 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/309/PR/200205/000483Mar 2021 → Jun 2020

Reason as filed by the promoterCustomers want modification in interiors; Applied for modification; Financial crunch

ExtensionJun 2020 → Apr 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka4

Case no.ComplainantRespondentFiled
CMP/190408/0002553-Total Environment Building Systems Pvt. Ltd08/04/2019
00139/2023-Total Environment Building Systems Pvt. Ltd31/01/2023
00662/2024-Total Environment Building Systems Pvt. Ltd03/07/2024
00855/2024-Total Environment Building Systems Pvt. Ltd10/09/2024

Documents filed70

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/171014/000483 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Annexure 1.pdf-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: Annexure 4.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Annexure 5.pdf-
CA Certificate for Funds UtilizationFile: Annexure 60.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Annexure 8.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Annexure 9.pdf-
CA Certificate for Funds required for Project CompletionFile: Annexure 10.pdf-
AffidavitFile: FORM B.pdf-
Latest Encumbrance CertificateFile: EC TILL DATE.pdf-
Consent letter from 2/3rd of AllotteesFile: allottee consent lettere with agreement to sale.pdf-
Details Of Sold/ Un-sold UnitsFile: Annexure 12.pdf-
NOC DetailsFile: Annexure 13.pdf-
Document 1File: ALL DOCUMENTS.pdf-
Annexure 105 cc-
Approved Section Of BuildingInfrastructure Plan of Plotting-
Approved Layout Plan-
ATR Sale Deed-
072 P1 AfS 05Oct17 -
Phase 01_RERAMasterplan-
Exisiting Section Plan-
Land Documents & RTC-
Approved Section Of BuildingInfrastructure Plan of Plotting-
Phase 01_RERAMasterplan-
ATR Allotment Letter -
Phase01 Brochure-
NOCcompressed-
Project Specification-
ATR EC-
AtR_e-khata dt 15Oct14-
Agreement for Sale & Supplementory Agreement& GPA-
Legal Opinion-Indus Law phase 1 & Title Docuemnts-
Conversion order-
Relinquishment Deed-
ATR (Phase 1) Panchayath Letter - water-
AtR_Phase 2a_CFE from KSPCB dt 28April17-
AtR_SEIAA_for Phase 1 & 2a dt 25Jan17-
Balance Sheet 2015 - 2016File: 1.pdf-
Balance Sheet 2014 - 2015File: 1.pdf-
Balance Sheet 2013 - 2014File: 1.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2.pdf-
Audited Profit and Loss Statement 2014 - 2015File: 2.pdf-
Audited Profit and Loss Statement 2013 - 2014File: 2.pdf-
Director's Report 2015 - 2016File: 3.pdf-
Director's Report 2014 - 2015File: 3.pdf-
Director's Report 2013 - 2014File: 3.pdf-
Cash Flow Statement 2015 - 2016File: 4.pdf-
Cash Flow Statement 2014 - 2015File: 4.pdf-
Auditor's Report 2015 - 2016File: 5.pdf-
Auditor's Report 2014 - 2015File: 5.pdf-
Auditor's Report 2013 - 2014File: 5.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 6.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: 6.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: 6.pdf-
Form B-
Prospectus/BrochureFile: Annexure 1.01_Brochure.pdf-
Advertisement Copy 1File: Annexure 1.02_Advertisement.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_171014_000483 (1).xlsx-
Loan raised documentFile: Discharge Deed.pdf-
Occupancy CertificateFile: ATR - OC.pdf-
Consent for operation issued by KSPCBFile: KSPCB CFO.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM NOC.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: WATER NOC.pdf-
Architect certificate for having completed the work(in format no 5)File: Form-5 Architect Closure Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form-4 CC CA Certificate.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: ATR phase 1 - Closure Affidavit.pdf-
SEIAA NOCFile: SEIAA NOC.pdf-
Annex-2 - ATR Completion ReportFile: Annex-2 - ATR Completion Report.pdf-
Form-6 Engineer Closure CertificateFile: Form-6 Engineer Closure Certificate.pdf-
RERA Bank Account DeclarationFile: RERA Bank Account Declaration.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 34 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep After the Rain- Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmAfter the Rain- Phase 1Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: Total Environment Building Systems Pvt. Ltd

TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD has 5 registrations on RERA Karnataka, including After The Rain Phase III and After the Rain- Phase 1. Its filings declare 3 earlier projects, none of them declared completed. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if After the Rain- Phase 1 is delayed beyond 30 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of After the Rain- Phase 1?

The registered promoter entity is Total Environment Building Systems Pvt. Ltd, a company as per the filing. Its CIN U45202KA1996PTC020790 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in After the Rain- Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against After the Rain- Phase 1?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in After the Rain- Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About After the Rain- Phase 1. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save After the Rain- Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.