Home / Browse projects / Mumbai Suburban, Maharashtra / Adora Enclave Residency / Commercial
Adora Enclave Residency / Commercial
RG-MH-90417 · RERA P51800012841 · Last updated on MahaRERA portal: 29 Feb 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 57 months past the filed date
- 3 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Adora Enclave Residency / Commercial is a Others project by Hemant Vinaykant Parikh in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012841 on 7 Sep 2017. Possession was promised by 12 Jan 2022 and is now 57 months past that date. 3 complaints are on record with the regulator.
At a glance
Project
- NameAdora Enclave Residency / Commercial
- TypeOthers
- Location
- 90 Ft Road
- Ghatkopar East
- Kurla
- Mumbai Suburban
- 400083
- Pincode400083
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800012841
- ReraGenie IDRG-MH-90417
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on7 Sep 2017
- Promised completion12 Jan 2022
- Revised completionNone
- Buildings1 building record
- Documents filed43 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Alena Residency / Commercial | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
Alena Residency / Commercial: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 29 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 85% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 30% |
| Community Buildings | Yes | 85% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 85% |
| Solid Waste Management And Disposal | Yes | 85% |
| Water conservation /Rain water harvesting | Yes | 85% |
| Energy managemcnt | Yes | 85% |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mumbai Marathi Granth Sangrahalay | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hemant Parikh and Assosciates |
| Engineer | H M Raje |
| Partner | Role in project |
|---|---|
| Hemant Vinaykant Parikh | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 100023/2022 | City Sessions Court Mumbai | Case disposed |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000023126 | Mr. Jayesh Chandrakant Parekh | Mr. Hemant Vinayak Parikh | 31/01/2018 |
| CC006000000056949 | Adora Enclave Flat Owners Association (Members List enclosed) | Hemant Vinaukant Parikh | 19/11/2018 |
| CC006000000197732 | Varsha Bhayani | Siddhivinayak adora CHSL | 24/07/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed43
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: adora details of encumbrances concerned to legal.pdf | 29 Feb 2024 |
| Details of encumbrances concerned to LegalFile: adora details of encumbrances concerned to legal.pdf | 29 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: adora 1, 2, 3, 5.pdf | 20 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: adora 1, 2, 3, 5.pdf | 20 Jan 2023 |
| Certificates of CA (Form 3)File: adora 1, 2, 3, 5.pdf | 20 Jan 2023 |
| Certificates of CA (Form 5)File: adora 1, 2, 3, 5.pdf | 20 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: ANNEXURE - A.pdf | 24 Jan 2022 |
| OtherFile: ANNEXURE - A.pdf | 24 Jan 2022 |
| OtherFile: HPA SPACES Mail - Adora 11_2_20 hearing submissions.pdf | 11 Feb 2020 |
| Certificates of CA (Form 3)File: ITR V HEMANTA VINAYAK PARIKH.pdf | 25 May 2019 |
| OtherFile: Quotation for Adora Enclave Gatkopar east.pdf | 25 May 2019 |
| OtherFile: Gmail - Fwd_ Without prejudice consent terms adora enclave upload in adora rera site inclu | 25 May 2019 |
| OtherFile: adora.pdf | 24 May 2019 |
| OtherFile: adora1.pdf | 24 May 2019 |
| OtherFile: adora2.pdf | 24 May 2019 |
| Certificates of CA (Form 3)File: OB 9 1.pdf | 17 May 2019 |
| Certificates of CA (Form 5)File: ANNUAL REPORT ON STATEMENT OF ACCOUNTS ADORA .pdf | 17 May 2019 |
| OtherFile: HP.pdf | 17 May 2019 |
| OtherFile: RM - HPA Spaces.pdf | 17 May 2019 |
| Building plan approvalFile: 4 OB-9 IOD (1).pdf | 3 Aug 2017 |
| Layout approvalFile: 1ST FLOOR PLAN.pdf | 3 Aug 2017 |
| Layout approvalFile: 2 Attachment -Approved Plan- Adora (1).pdf | 3 Aug 2017 |
| Layout approvalFile: 2ND FLOOR PLAN.pdf | 3 Aug 2017 |
| Layout approvalFile: 7TH FLOOR PLAN (REFUGEE).pdf | 3 Aug 2017 |
| Layout approvalFile: REVISED 3RD TO 6TH 8TH TO 12TH.pdf | 3 Aug 2017 |
| Layout approvalFile: GROUND PANS.pdf | 3 Aug 2017 |
| PAN CardFile: images.pdf | 3 Aug 2017 |
| Copy of the legal title reportFile: 3 OB-9 - MHADA NOC.pdf | 3 Aug 2017 |
| Details of encumbrancesFile: images (1).pdf | 3 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: 1ST FLOOR PLAN.pdf | 3 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: 2 Attachment -Approved Plan- Adora (1).pdf | 3 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: 2ND FLOOR PLAN.pdf | 3 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: 7TH FLOOR PLAN (REFUGEE).pdf | 3 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: REVISED 3RD TO 6TH 8TH TO 12TH.pdf | 3 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: GROUND PANS.pdf | 3 Aug 2017 |
| Building Plan Approval (IOD)File: 4 OB-9 IOD (1).pdf | 3 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: 5 OB-9 CC.pdf | 3 Aug 2017 |
| Declaration in FORM BFile: 9 FORM B- ADORE.pdf | 3 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 FORM 1 ADORA compressed.pdf | 3 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 FORM 2.pdf | 3 Aug 2017 |
| Certificates of CA (Form 3)File: 14 AFFIDAVIT FOR FORM 2 3 OB 9 1.pdf | 3 Aug 2017 |
| Proforma of Allotment letterFile: 11 Attachment - allotment letter draft - OB9.pdf | 3 Aug 2017 |
| Proforma of Allotment letterFile: 12 Attachment -AGREEMENT FOR SALE OB9-CHANGED.pdf | 3 Aug 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Krish Residence | Tilak Road Ghatkopar East | 25 | Completed | Dec 2007 | Late, Jul 2008 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 43 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Adora Enclave Residency / Commercial on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ghatkopar East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 151 registered projects within 2 km.
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt
Mumbai Housing And Area Development Board
Om Siddhivinayak CHS and Gurukrupa CHS
Shreeji Developers
AKASSH AMAZONIA TOWER 1
HEER MEHTA LANDMARK DEVELOPERS PRIVATE LIM
Ajmera Solis
Shree Yogi Realcon Private Limited
CENTRAL PARK
V LAXMI NURSES DEVELOPERS LLP
Swastik Platinum
SUVASYA BUILDERS AND DEVELOPERS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Hemant Vinaykant Parikh
Hemant Vinaykant Parikh has 2 registrations on MahaRERA, including Alena Residency Commercial and Adora Enclave Residency / Commercial. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Adora Enclave Residency / Commercial shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Adora Enclave Residency / Commercial is delayed beyond 12 Jan 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Adora Enclave Residency / Commercial?
The registered promoter entity is Hemant Vinaykant Parikh, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Adora Enclave Residency / Commercial?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Adora Enclave Residency / Commercial?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Adora Enclave Residency / Commercial?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Adora Enclave Residency / Commercial?
The professionals named in the filing: Architect: Hemant Parikh and Assosciates; Engineer: H M Raje. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Adora Enclave Residency / Commercial?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback