ADITYARAJ SQUARE
By ADITYARAJ BUILDERS & PROMOTERS
RG-MH-28079 · RERA P51800024869 · Last updated on MahaRERA portal: 19 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ADITYARAJ SQUARE is a Residential / Group Housing project by ADITYARAJ BUILDERS & PROMOTERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024869 on 9 Mar 2020. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameADITYARAJ SQUARE
- TypeResidential / Group Housing
- Location
- KANNAMWAR NAGAR
- VIKHROLI EAST
- Kurla
- Mumbai Suburban
- 400083
- Pincode400083
- RERA no.P51800024869
- ReraGenie IDRG-MH-28079
Builder
- NameADITYARAJ BUILDERS & PROMOTERS
- Entity typePartnership
- PartnerRAJKUMAR GYANCHAND KHUSHALANI
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Mar 2020
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings2 building records
- Documents filed48 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ADITYARAJ SQUARE WING A | NA | 23 | 0 | 0 | 0 | 0 |
| ADITYARAJ SQUARE WING B | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 19 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 45%.
ADITYARAJ SQUARE WING A35%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 25% |
| Slabs of Super Structure | 45% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ADITYARAJ SQUARE WING B36%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 25% |
| Slabs of Super Structure | 45% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 19 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed55
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| ADITYARAJ SQUARE WING A | 27 | 27 |
| ADITYARAJ SQUARE WING B | 28 | 28 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANKIT MAKANI |
| Engineer | NAVINDERPAL SINGH |
| Chartered Accountant | CHIRAG SURANA |
| Partner | Role in project |
|---|---|
| ADITYARAJ BUILDERS & PROMOTERS | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000428749 | SUNIL MOTIRAM AHIRE | M/S ADITYARAJ BUILDERS AND PROMOTORS | 06/01/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 31 Oct 2023
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - TechnicalFile: Form 4 Bldg No 82.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 82 FORM 1.pdf | 22 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG NO 82 JUNE 23.pdf | 18 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG NO 82SEP 23.pdf | 18 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-82.pdf | 17 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLDG NO 82 JUNE 23 FORM 3.pdf | 8 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLDG NO 82 FORM 3 SEP 23.pdf | 8 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_82.pdf | 31 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A QUALITY ASSURANCES bldg no 82.pdf | 31 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - 22 - 23 BLDG 82.pdf | 31 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 82 Full OC received.pdf | 31 Oct 2023 |
| Status of ConveyanceFile: 1_LEASE DEED_11zon.pdf | 31 Oct 2023 |
| Status of ConveyanceFile: 2_LEASE DEED_11zon.pdf | 31 Oct 2023 |
| Status of ConveyanceFile: 3_LEASE DEED_11zon.pdf | 31 Oct 2023 |
| Status of ConveyanceFile: 4_LEASE DEED_11zon.pdf | 31 Oct 2023 |
| Status of ConveyanceFile: 5_LEASE DEED_11zon.pdf | 31 Oct 2023 |
| Details of encumbrancesFile: EMCUMBRANCES CERTIFICATE.pdf | 6 Jul 2023 |
| Details of encumbrancesFile: EMCUMBRANCES CERTIFICATE.pdf | 5 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 22 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 1_82.pdf | 22 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 22 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 BLDG NO 82 21-22.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ABP RERA.pdf | 9 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ABP RERA.pdf | 9 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ABP RERA.pdf | 9 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ABP RERA.pdf | 9 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner Jun 9, 2022 12-41 PM_compressed (1).pdf | 9 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner Jun 9, 2022 12-41 PM_compressed (1).pdf | 9 Jun 2022 |
| Details of encumbrancesFile: EMCUMBRANCES CERT.pdf | 26 Mar 2022 |
| Details of encumbrancesFile: EMCUMBRANCES CERT.pdf | 26 Mar 2022 |
| Proforma of Allotment letterFile: AGREEMENT.pdf | 26 Mar 2022 |
| Proforma of Allotment letterFile: DRAFT-82.pdf | 23 Mar 2022 |
| Details of encumbrancesFile: EMCUMBRANCES CERT.pdf | 29 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 82_ CC 14th Uppar.pdf | 2 Dec 2021 |
| Layout approvalFile: IOA PLAN.pdf | 22 Feb 2020 |
| Building plan approvalFile: I O A.pdf | 22 Feb 2020 |
| PAN CardFile: ABP PAN CARD ABLFA9725G.pdf | 22 Feb 2020 |
| Copy of the legal title reportFile: Title Clearance Certificate 82_compressed.pdf | 22 Feb 2020 |
| Details of encumbrancesFile: encumbrances.pdf | 22 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: IOA PLAN.pdf | 22 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: I O A.pdf | 22 Feb 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: c c_.pdf | 22 Feb 2020 |
| Declaration in FORM BFile: FORM B 82_.pdf | 22 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 22 Feb 2020 |
| Proforma of Allotment letterFile: aLLOTMENT_.pdf | 22 Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ADITYARAJ SQUARE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VIKHROLI EAST6,700+ in Mumbai Suburban
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt
Mumbai Housing And Area Development Board
Om Siddhivinayak CHS and Gurukrupa CHS
Shreeji Developers
AKASSH AMAZONIA TOWER 1
HEER MEHTA LANDMARK DEVELOPERS PRIVATE LIM
Ajmera Solis
Shree Yogi Realcon Private Limited
CENTRAL PARK
V LAXMI NURSES DEVELOPERS LLP
Swastik Platinum
SUVASYA BUILDERS AND DEVELOPERS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: ADITYARAJ BUILDERS & PROMOTERS
ADITYARAJ BUILDERS & PROMOTERS has 2 registrations on MahaRERA, including ADITYARAJ SQUARE and ADISHAKTI CHS ADITYARAJ PRIME. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that ADITYARAJ SQUARE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ADITYARAJ SQUARE is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ADITYARAJ SQUARE?
The registered promoter entity is ADITYARAJ BUILDERS & PROMOTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ADITYARAJ SQUARE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ADITYARAJ SQUARE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ADITYARAJ SQUARE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ADITYARAJ SQUARE?
The professionals named in the filing: Architect: ANKIT MAKANI; Engineer: NAVINDERPAL SINGH; Chartered Accountant: CHIRAG SURANA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ADITYARAJ SQUARE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback