RG-KA-64240 · RERA PRM/KA/RERA/1251/472/PR/210409/004117 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 26 complaints at RERA Karnataka
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
Saved.
ADARSH GREENS PHASE 2 is a Residential/Group Housing project by ADARSH HAVEN PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/210409/004117 on 9 Apr 2021. Possession is promised by 31 May 2027. The completion date has moved by 24 months from the original filing. 1,042 of the 1,042 units on this registration are recorded sold or booked, and 0 of 19 construction stages are filed complete. 26 complaints are on record with the regulator.
At a glance
Project
- NameADARSH GREENS PHASE 2
- TypeResidential/Group Housing
- Location
- Yelahanka
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/472/PR/210409/004117
- ReraGenie IDRG-KA-64240
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on9 Apr 2021
- Promised completion31 May 2027
- Revised completionRevised to 31 May 2027 (originally 31 May 2025)
- Buildings2 building records
- Documents filed148 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 373 | 0 | 373 |
| Block B | - | - | - | 669 | 0 | 669 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 19 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 98%.
Building: 69% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 98% |
| Foundation footing work | 98% |
| Retaining wall (All types) | 95% |
| Plinth level Beam | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 95% |
| RCC or MS Framed structure | 95% |
| Masonry construction: Bricks, Concrete blocks etc | 95% |
| Plastering inside , outside & Ceiling | 95% |
| Joinery: Doors, Windows, Ventilators etc | 80% |
| Basic work of Water supply, Sanitary and Electrification | 50% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 85% |
| Railing and Grill fixing | 75% |
| Electrification, Water supply and Sanitary Finishing | 70% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 30% |
| Weather Proof work(tile,concrete) | 75% |
| Painting | 80% |
| Elevation work | 50% |
| Internal and External work including landscapes as per santioned drawings | 40% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 50% |
| Internal Roads & Footpaths | Yes | 50% |
| Sewage and Drainage System | Yes | 50% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 30% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 60% |
| Solid waste management and disposal | Yes | 60% |
| Water conservation | Yes | 50% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Education/Health/Other public amenities | Yes | 0% |
| Electricity supply transformer and substation | Yes | 45% |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 80% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 80% |
| Electricity | Yes | 45% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 85% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 60% |
| Swimming Pool | Yes | 40% |
| Gym | Yes | 70% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Gas | Yes | 0% |
| Water and Sanitation | Yes | 50% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 50% |
| Lifts | Yes | 50% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 40% |
| Fire escapes | Yes | 40% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 50% |
| Basement | Yes | 55% |
| Terrace | Yes | 80% |
| Outer Wall | Yes | 0% |
| Open parking areas and common storage spaces | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ADARSH HAVEN PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 352.50 cr | Rs 321.50 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 150.00 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 22.91 cr | Rs 8.12 lakh |
| On-site expenditure-Salaries of workers | Rs 14.10 cr | Rs 25.03 cr |
| On-site expenditure-Site Overhead | Rs 5.35 cr | Rs 5.13 cr |
| On-site expenditure-Consultants Fees | Rs 50.75 lakh | Rs 19.03 lakh |
| RERA FEE | Rs 3.31 lakh | - |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shymala Bharadwaj |
| Engineer | Chetana Engineering Consultants Pvt. Ltd |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterFinancial crunch
No reason recorded in the filing
Complaints filed with RERA Karnataka26
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01462/2025 | - | ADARSH HAVEN PRIVATE LIMITED | 10/12/2025 |
| 00560/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 19/05/2026 |
| 00565/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 20/05/2026 |
| 00571/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 21/05/2026 |
| 00593/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 26/05/2026 |
| 00609/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 27/05/2026 |
| 00696/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 15/06/2026 |
| 00708/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 19/06/2026 |
| 00785/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 06/07/2026 |
| 00791/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 06/07/2026 |
| 00802/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 08/07/2026 |
| 00811/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 14/07/2026 |
| 00814/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 14/07/2026 |
| 00928/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 03/08/2026 |
| 00929/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 03/08/2026 |
| 00945/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 04/08/2026 |
| 00946/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 04/08/2026 |
| 00963/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 05/08/2026 |
| 01020/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 18/08/2026 |
| 01040/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 24/08/2026 |
| 01048/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 24/08/2026 |
| 01065/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 27/08/2026 |
| 01066/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 27/08/2026 |
| 01124/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 15/09/2026 |
| 01260/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 22/10/2026 |
| 01306/2026 | - | ADARSH HAVEN PRIVATE LIMITED | 06/11/2026 |
Documents filed148
As listed on the registration, under the names the promoter filed them with; the newest 80 of 148 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/210409/004117 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA_.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Greens PH 2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Greens PH 2.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Greens PH 2 _.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Greens PH 2.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Greens PH 2.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: GREENS PH 2.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Greens PH 2.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Greens PH 2.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Greens PH 2 _merged.pdf | 31 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Greens PH 2.pdf | 31 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Eng Greens PH 2.pdf | 31 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 31 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 31 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 31 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 31 Jan 2026 |
| Q3 2025-26 Fire and Safety | 31 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 31 Jan 2026 |
| Encumbrance certificate till March 2021File: 1 Encumbrance certificate till march 2021.pdf | 3 Apr 2021 |
| Clarification of Phased Development detailsFile: 2PHASE-I & II numbering-Development Details.pdf | 3 Apr 2021 |
| Commencement certificate/ Technical sanction letterFile: 3cc.pdf | 3 Apr 2021 |
| Bank pass book copy - Letter from BankFile: 2 Bank Passbook copy.pdf | 25 Mar 2021 |
| EC Transaction in favour of Adarsh Haven Private LimitedFile: 3 EC reflecting adarsh havens pvt ltd.pdf | 25 Mar 2021 |
| Form-B on Stamp paperFile: 4 Form-B (Declaration)- Greens Phase-II (23.3.2021.pdf | 25 Mar 2021 |
| Plan Licence letterFile: 6 plan licence letter.pdf | 25 Mar 2021 |
| Affidavit under section 3(1) of the RERA Act uploaded on non-Judicial paperFile: 8 Affidavit- Greens Phase-II (23.3.2021.pdf | 25 Mar 2021 |
| Sanction plan - Part 1File: 7 Sanctioned plans.pdf | 25 Mar 2021 |
| Sanction plan - Part 2File: 7 Sanctioned plans-1-3_compressed.pdf | 25 Mar 2021 |
| Sanction plan - Part 3File: 7 Sanctioned plans-4-6_compressed.pdf | 25 Mar 2021 |
| CertificateFile: AHPL COI.pdf | - |
| Project Details | - |
| Architect Certificate for Work Completion Schedule till DateFile: Work as on Date ARCH.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Greens PH 2 Work as on Date ENG.pdf | - |
| CA Certificate for Funds UtilizationFile: 18 CA certificate - Fund Utilized Greens Phase 2.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Work Pending ARCH.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Greens PH 2 Work Pending ENG.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: 19 CA certificate - Funds Required Greens Phase 2.pdf | - |
| AffidavitFile: Supporting Document Nottarised Affidavit.pdf | - |
| Latest Encumbrance CertificateFile: Supporting Document EC.pdf | - |
| Consent letter from 2/3rd of AllotteesFile: Supporting Document Consent Letter.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| Document 1File: Affidavit.pdf | - |
| Document 2File: Affidavit.pdf | - |
| Document 3File: Affidavit.pdf | - |
| Document 4File: Form B.pdf | - |
| Document 5File: 8 EC.pdf | - |
| Document 6File: Greens PH 2 1.pdf | - |
| Document 7File: Greens PH 2 2.pdf | - |
| Document 8File: Greens PH 2 3.pdf | - |
| Document 9File: Greens PH 2 4.pdf | - |
| Document 10File: Greens PH 2 5.pdf | - |
| Document 11File: Greens PH 2 6.pdf | - |
| Document 12File: Greens PH 2 7.pdf | - |
| Document 13File: Greens PH 2 8.pdf | - |
| Document 14File: Greens PH 2 9.pdf | - |
| Document 15File: Greens PH 2 10.pdf | - |
| Document 16File: Greens PH 2 11.pdf | - |
| Document 17File: Greens PH 2 12.pdf | - |
| Document 18File: Greens PH 2 13.pdf | - |
| Document 19File: Greens PH 2 14.pdf | - |
| Document 20File: Greens PH 2 15.pdf | - |
| Document 21File: Greens PH 2 16.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Adarsh Greens Phase 1 | - | Ongoing | Oct 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ADARSH GREENS PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: ADARSH HAVEN PRIVATE LIMITED
ADARSH HAVEN PRIVATE LIMITED has 2 registrations on RERA Karnataka, including ADARSH GREENS PHASE 1 and ADARSH GREENS PHASE 2. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ADARSH GREENS PHASE 2 is delayed beyond 31 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ADARSH GREENS PHASE 2?
The registered promoter entity is ADARSH HAVEN PRIVATE LIMITED, a company as per the filing. Its CIN U45202KA2009PTC051266 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ADARSH GREENS PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ADARSH GREENS PHASE 2?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at ADARSH GREENS PHASE 2?
The professionals named in the filing: Architect: Shymala Bharadwaj; Engineer: Chetana Engineering Consultants Pvt. Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ADARSH GREENS PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback