Home / Browse projects / Raigarh, Maharashtra / Acons 54 Greens Phase 1

Completed No litigation declared Residential / Group Housing project

Acons 54 Greens Phase 1

By Aarun Gulati

RG-MH-93142 · RERA P52000013906 · Last updated on MahaRERA portal: 9 May 2023

Source: official MahaRERA filing

Red flags

  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2020Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

Acons 54 Greens Phase 1 is a Residential / Group Housing project by Aarun Gulati in Raigarh, Maharashtra, registered with MahaRERA as P52000013906 on 2 Nov 2017. The registration is recorded completed; possession was promised by 20 Mar 2020.

At a glance

Project

  • NameAcons 54 Greens Phase 1
  • TypeResidential / Group Housing
  • Location
    • Khandale
    • Alibag
    • Raigarh
    • 402209
  • Pincode402209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000013906
  • ReraGenie IDRG-MH-93142

Builder

  • NameAarun Gulati
  • Entity typeIndividual
  • GSTIN27AABPG8353R1Z5
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredNov 2017PromisedMar 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Nov 2017
  • Promised completion20 Mar 2020
  • Revised completionNone
  • Buildings2 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Acons 54 Greens Building 1NA10000
Acons 54 Greens Building 4NA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Acons 54 Greens Building 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Acons 54 Greens Building 4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered2
Open Space12
BuildingClosed/CoveredOpen SpaceTotal
Acons 54 Greens Building 1167
Acons 54 Greens Building 4167

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,140 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3140.0
Proposed, not sanctioned3,140 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShreebag, Alibag

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastu Architects & Interior Designers
PartnerRole in project
Aarun Gulati-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000005792Mar 2020 → Mar 2021

Reason as filed by the promoterDue to a shortage of materials in the market to construct the road to approach the land our project construction has started a year after anticipated and as registered on Rera. For this unforeseen reason, we would like to extend the deadline of our project by 1 year.

EXT52000009394Mar 2020 → Sep 2022

Reason as filed by the promoterDue to Covid-19, there has been a huge shortage of labor and transport of materials is taking longer than usual as well. Due to this time lag. We are extending the completion of the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Mar 2023

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: form 4 Acons Green Phase 1.pdf9 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5 A54G.pdf13 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Acons 54 Greens OC.pdf13 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration 1 (Society).pdf20 Sep 2022
Status of ConveyanceFile: Declaration 2 (Conveyance).pdf20 Sep 2022
Declaration about Commencement CertificateFile: Format D - Acons.pdf2 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019- 2020.pdf2 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020- 2021.pdf2 May 2022
CERSAI detailsFile: Acons 54 Greens Phase 1 CERSAI.pdf2 May 2022
Disclosure of sold/ booked inventoryFile: 29- Acons_compressed.pdf2 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Certificate 028.pdf2 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate 029.pdf2 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2 Certificates of CA (Form 5).pdf2 May 2022
Certificates of CA (Form 5)File: Form 5 Rera Audit 20-21.pdf27 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Acons 54 Greens 31-05-2021.pdf16 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-Engineers Certificate_ACONS 54 Green-31052021.pdf16 Jul 2021
Certificates of CA (Form 3)File: Acons 54 Green CA Certificate 31-05-2021.pdf16 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect acons 54 green 27062019_reduce.pdf27 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer54GReens25062019-compressed.pdf27 Jun 2019
Certificates of CA (Form 3)File: CA Acons 54 Green 27062019_reduce.pdf27 Jun 2019
Certificates of CA (Form 5)File: Acons Builders RERA Certificate.pdf23 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Maha Rera30062018.pdf12 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate (Maha Rera)30062018.pdf12 Jul 2018
Certificates of CA (Form 3)File: Chartered Accountants Certificate(MahaRera)30062018.pdf12 Jul 2018
Details of encumbrancesFile: Encumbrances signed.pdf27 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate small.pdf27 Mar 2018
Building plan approvalFile: Plan.pdf20 Oct 2017
Layout approvalFile: Plan.pdf20 Oct 2017
Copy of the legal title reportFile: Search Report small.pdf20 Oct 2017
Details of encumbrancesFile: Encumbrance.pdf20 Oct 2017
Copy of Layout Approval (in case of layout)File: Plan.pdf20 Oct 2017
Building Plan Approval (IOD)File: Plan.pdf20 Oct 2017
Declaration in FORM BFile: Affidavit.pdf20 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf20 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer.pdf20 Oct 2017
Certificates of CA (Form 3)File: CA small.pdf20 Oct 2017
Proforma of Allotment letterFile: Allotment and Agreement.pdf20 Oct 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Acons 54 Greens Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khandale5,900+ in Raigarh

2 kmAcons 54 Greens Phase 1Completed 3Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Aarun Gulati

Aarun Gulati has 2 registrations on MahaRERA, including Acons 54 Greens Phase 1 and Acons The Park Phase 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Acons 54 Greens Phase 1 is delayed beyond 20 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Acons 54 Greens Phase 1?

The registered promoter entity is Aarun Gulati, an individual as per the filing. Its GSTIN 27AABPG8353R1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Acons 54 Greens Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Acons 54 Greens Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Acons 54 Greens Phase 1?

The professionals named in the filing: Architect: Vastu Architects & Interior Designers. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Acons 54 Greens Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Acons 54 Greens Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Acons 54 Greens Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.