Home / Browse projects / Bengaluru Urban, Karnataka / Aarushi Residency - 'The Rising Sun'

Registration approved Residential/Group Housing project

Aarushi Residency - 'The Rising Sun'

By Mehi Developers

RG-KA-64777 · RERA PRM/KA/RERA/1251/309/PR/171208/001036

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Apr 2020Possession promisedmoved 12 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 38 documents Report an error

Aarushi Residency - 'The Rising Sun' is a Residential/Group Housing project by Mehi Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/171208/001036 on 8 Dec 2017. Possession is promised by 17 Apr 2020. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAarushi Residency - 'The Rising Sun'
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/171208/001036
  • ReraGenie IDRG-KA-64777

Builder

  • NameMehi Developers
  • Entity typeProprietorship Firm
  • Authorized SignatoryRoshan Kumar

Key dates

this monthRegisteredDec 2017First promiseApr 2019Revised toApr 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 Dec 2017
  • Promised completion17 Apr 2020
  • Revised completionRevised to 17 Apr 2020 (originally 17 Apr 2019)
  • Buildings1 building record
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AARUSHI RESIDENCY - THE RISING SUN---39039

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,023 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.14 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshish Kumar Sachdev
EngineerDinesh Bellad

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/309/PR/220622/001036Apr 2019 → Apr 2020

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00286/2024-Mehi Developers16/03/2024

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/171208/001036 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: PT.jpg-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate - project extension.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg certificate - work completed.pdf-
CA Certificate for Funds UtilizationFile: CA Fund Utilized_compressed.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate - project extension.pdf-
CA Certificate for Funds required for Project CompletionFile: CA FUND REQUIRED_compressed.pdf-
Consent letter from 2/3rd of Allottees-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (1).xlsx-
Commencement Certificate-
Sanction Plan-
ABSOLUTE SALE DEED (draft)-
Proforma of Agreement for Sale (1)-
Location Map-
Sanction Plan-
Allotment Letter-
Brochure_Single_Front_Final-
Specification-
EC-
Khata Certificate-
ABSOLUTE SALE DEED (draft)-
CONVERSION ORDER-
Sanction Plan-
Bescom-
Sanction Plan-
Balance Sheet 2015 - 2016File: BS AY 2016-17.pdf-
Balance Sheet 2014 - 2015File: BS AY 2015-16.pdf-
Balance Sheet 2013 - 2014File: BS AY 2014-15.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L AY 2016-17 - 1.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P & L AY 2015-16 -1.pdf-
Audited Profit and Loss Statement 2013 - 2014File: p & l AY 2014-15 -1.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income Tax Returns AY 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Income Tax Returns AY 2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: Income Tax Returns AY 2014-15.pdf-
Applied-
Prospectus/BrochureFile: Brochure_Single_Front_Final.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_171208_001036.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Aarushi Residency - 'The Rising Sun' on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Mehi Developers

Mehi Developers has 1 registration on RERA Karnataka, including Aarushi Residency - 'The Rising Sun'. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Aarushi Residency - 'The Rising Sun' is delayed beyond 17 Apr 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Aarushi Residency - 'The Rising Sun'?

The registered promoter entity is Mehi Developers, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Aarushi Residency - 'The Rising Sun'?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Aarushi Residency - 'The Rising Sun'?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Aarushi Residency - 'The Rising Sun'?

The professionals named in the filing: Architect: Ashish Kumar Sachdev; Engineer: Dinesh Bellad. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aarushi Residency - 'The Rising Sun'?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aarushi Residency - 'The Rising Sun'. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aarushi Residency - 'The Rising Sun' to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.