Home / Browse projects / Raigarh, Maharashtra / 9 Meraki
9 Meraki
RG-MH-07231 · RERA P52000054448 · Last updated on MahaRERA portal: 4 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
9 Meraki is a Others project by EKDANT EMPERIA LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000054448 on 25 Jan 2024. Possession is promised by 31 Dec 2028. 74 of the 325 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- Name9 Meraki
- TypeOthers
- Location
- Panvel
- Shedung
- Raigarh
- 410216
- Pincode410216
- RERA no.P52000054448
- ReraGenie IDRG-MH-07231
Builder
- NameEKDANT EMPERIA LLP
- Entity typePartnership
- PartnersManoj Kothari, Neha Jain, Nancy Jain, Dinesh Doshi, Rajendra Chaudhary, Dhiraj Manjeri, Mayank A Dhakad
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jan 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed90 files
Current status
Figures as on 4 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 18 | 18 | 166 | 17 | 183 |
| Wing B | NA | 18 | 18 | 142 | 0 | 142 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 4 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 56%.
Wing A37%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 56% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B37%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 56% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed222
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing A | 1 | 110 | 111 |
| Wing B | 1 | 110 | 111 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 30.50 cr | Rs 8.92 cr |
| Wing B | NA | Rs 30.50 cr | Rs 8.92 cr |
| - | NA | Rs 25.64 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | An Arch |
| Engineer | SOMANTH KALE |
| Engineer | Swapnil Gurkhe |
| Chartered Accountant | Ms Dipika Patel & Co |
| Chartered Accountant | Manish Kumar Gupta and Co |
| Partner | Role in project |
|---|---|
| EKDANT EMPERIA LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 9 Form 1 31-12-2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: 8 Form 2 30-09-2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: 9 Form 3 30-12-2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: 8 Form 1 30-09-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: 8 Form 2 30-09-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: 8 Form 3 30-09-2025.pdf | 23 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 2024-25 Ekdant emperia Signed.pdf | 9 Jan 2026 |
| Withdrawal Update Form 1File: 7 Form 1 30-06-2025.pdf | 22 Aug 2025 |
| Withdrawal Update Form 2File: 7 Form 2 30-06-2025.pdf | 22 Aug 2025 |
| Withdrawal Update Form 3File: 7 Form 3 30-06-2025.pdf | 22 Aug 2025 |
| Withdrawal Update Form 1File: 2 Form 1 31-03-2024.pdf | 25 Jul 2025 |
| Withdrawal Update Form 2File: 2 Form 2 31-03-2024.pdf | 25 Jul 2025 |
| Withdrawal Update Form 3File: Ekdant Emperia LLP - Form 3_page-0001.pdf | 25 Jul 2025 |
| Form 1File: 6 Form 1 31-03-2025.pdf | 10 Jul 2025 |
| Form 2File: 6 Form 2 31-03-2025.pdf | 10 Jul 2025 |
| Form 3File: 6 Form 3 31-03-2025.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventories 31-03-2025.pdf | 10 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress March 2025.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 31-12-2024.pdf | 27 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 31-12-2024.pdf | 27 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 31-12-2024.pdf | 27 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 30-06-2024.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 30-09-2024.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 30-06-2024.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 30-09-2024.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 30-06-2024.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 30-09-2024.pdf | 6 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24 Ekdant emperia.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ekdant Emperia LLP - Form 3_page-0001.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 31-03-2024.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 31-03-2024.pdf | 3 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Revised Format A - Seperate bank Ac Details.pdf | 16 Jan 2024 |
| Declaration in FORM BFile: Revised Form B- Affidavit Cum Declaration.pdf | 4 Jan 2024 |
| Copy of the legal title reportFile: Report on Title Report latest_compressed.pdf | 3 Jan 2024 |
| Proforma of Agreement for saleFile: Final Sale Agreement Draft.pdf | 3 Jan 2024 |
| Other - LegalFile: Registered Sale Deed Scan copy-1-70_compressed.pdf | 3 Jan 2024 |
| Other - LegalFile: Registered Sale Deed Scan copy-71-100.pdf | 3 Jan 2024 |
| Other - LegalFile: Registered Sale Deed Scan copy-101-128_compressed.pdf | 3 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Ekdant Emperia.pdf | 14 Dec 2023 |
| Proforma of Allotment letterFile: Final Allotment letter_.pdf | 14 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: Scan - Deviation of Allotment Letter.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate final.pdf | 12 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclouser of Interest in other Real Estate Organization-3 merged.pdf | 12 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclouser of Interest in other Real Estate Organization-merged 2.pdf | 12 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclouser of Interest in other Real Estate Organization-merged.pdf | 12 Dec 2023 |
| Declaration about Commencement CertificateFile: Scan - Declarationabt CC.pdf | 11 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: Scan - Deviation of Agreement for Sale_11zon.pdf | 11 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC Certificate- 29-11-2023.pdf | 6 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 6 Dec 2023 |
| Building plan approvalFile: 2_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 3_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 4_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 5_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 6_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 7_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 8_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 9_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 10_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 11_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 12_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 13_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 14_11zon.pdf | 5 Dec 2023 |
| Building plan approvalFile: 15_11zon.pdf | 5 Dec 2023 |
| Layout approvalFile: 1_11zon.pdf | 5 Dec 2023 |
| PAN CardFile: Ekdant Emperia LLP - Pan Card.pdf | 5 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Self Declaration - Encumbraces to Finance.pdf | 5 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Self Declaration - Encumbrance to Legal Obligation.pdf | 5 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Self Declaration - Encumbraces to Finance.pdf | 5 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Self Declaration - Encumbrance to Legal Obligation.pdf | 5 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 1_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 8_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 9_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_11zon.pdf | 5 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 11_11zon.pdf | 5 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 9 Meraki on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shedung5,900+ in Raigarh
AMEER VILLA
UNIQUE FORTUNE ENTERPRISES
AQSARA APARTMENT
IMRAN MEHBOOB KHAN
Laxmichhaya Residency
The Craftsman
MOHAN RESIDENCY
SAIRAJ ENTERPRISES
Shiv Krupa
UNIQUE FORTUNE ENTERPRISES
Plot No -1 Sector -29 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
See every Raigarh project, with the district possession charts
Builder: EKDANT EMPERIA LLP
EKDANT EMPERIA LLP has 1 registration on MahaRERA, including 9 Meraki. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if 9 Meraki is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 9 Meraki?
The registered promoter entity is EKDANT EMPERIA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 9 Meraki?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 9 Meraki?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 9 Meraki?
The professionals named in the filing: Architect: An Arch; Engineer: SOMANTH KALE; Engineer: Swapnil Gurkhe; Chartered Accountant: Ms Dipika Patel & Co; Chartered Accountant: Manish Kumar Gupta and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 9 Meraki?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback