Home / Browse projects / Raigarh, Maharashtra / 9 Meraki

Registered No litigation declared Others project

9 Meraki

By EKDANT EMPERIA LLP

RG-MH-07231 · RERA P52000054448 · Last updated on MahaRERA portal: 4 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 56%
251 of 325Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

9 Meraki is a Others project by EKDANT EMPERIA LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000054448 on 25 Jan 2024. Possession is promised by 31 Dec 2028. 74 of the 325 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • Name9 Meraki
  • TypeOthers
  • Location
    • Panvel
    • Shedung
    • Raigarh
    • 410216
  • Pincode410216
  • RERA no.P52000054448
  • ReraGenie IDRG-MH-07231

Builder

  • NameEKDANT EMPERIA LLP
  • Entity typePartnership
  • PartnersManoj Kothari, Neha Jain, Nancy Jain, Dinesh Doshi, Rajendra Chaudhary, Dhiraj Manjeri, Mayank A Dhakad

Key dates

this monthRegisteredJan 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed90 files

Current status

23%74 of 325 units booked
20.6%Work done, per cost certificate

Figures as on 4 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA181816617183
Wing BNA18181420142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 56%.

Wing A37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure56%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure56%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed222

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots222
Closed/Covered2
Open Space220
BuildingClosed/CoveredOpen SpaceTotal
Wing A1110111
Wing B1110111

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,670 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025

Approvals and building plan

Sanctioning authorityMaharashtra State Road Development Corporation LTD
Permissible FSI21816.78
Proposed, not sanctioned20,022 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUnit 1 to 4, CBD Belapur, Ground floor, plot no 27, Ellora, Sector 11, Navi mumbai, Maharashta, 4006
Estimated costRs 86.64 cr
Cost incurredRs 17.84 cr
Work done20.59%
BuildingWingEstimatedIncurred
Wing ANARs 30.50 crRs 8.92 cr
Wing BNARs 30.50 crRs 8.92 cr
-NARs 25.64 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAn Arch
EngineerSOMANTH KALE
EngineerSwapnil Gurkhe
Chartered AccountantMs Dipika Patel & Co
Chartered AccountantManish Kumar Gupta and Co
PartnerRole in project
EKDANT EMPERIA LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 9 Form 1 31-12-2025.pdf4 Apr 2026
Withdrawal Update Form 2File: 8 Form 2 30-09-2025.pdf4 Apr 2026
Withdrawal Update Form 3File: 9 Form 3 30-12-2025.pdf4 Apr 2026
Withdrawal Update Form 1File: 8 Form 1 30-09-2025.pdf23 Feb 2026
Withdrawal Update Form 2File: 8 Form 2 30-09-2025.pdf23 Feb 2026
Withdrawal Update Form 3File: 8 Form 3 30-09-2025.pdf23 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25 Ekdant emperia Signed.pdf9 Jan 2026
Withdrawal Update Form 1File: 7 Form 1 30-06-2025.pdf22 Aug 2025
Withdrawal Update Form 2File: 7 Form 2 30-06-2025.pdf22 Aug 2025
Withdrawal Update Form 3File: 7 Form 3 30-06-2025.pdf22 Aug 2025
Withdrawal Update Form 1File: 2 Form 1 31-03-2024.pdf25 Jul 2025
Withdrawal Update Form 2File: 2 Form 2 31-03-2024.pdf25 Jul 2025
Withdrawal Update Form 3File: Ekdant Emperia LLP - Form 3_page-0001.pdf25 Jul 2025
Form 1File: 6 Form 1 31-03-2025.pdf10 Jul 2025
Form 2File: 6 Form 2 31-03-2025.pdf10 Jul 2025
Form 3File: 6 Form 3 31-03-2025.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventories 31-03-2025.pdf10 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress March 2025.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 31-12-2024.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 31-12-2024.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 31-12-2024.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 30-06-2024.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 30-09-2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 30-06-2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 30-09-2024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 30-06-2024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 30-09-2024.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24 Ekdant emperia.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ekdant Emperia LLP - Form 3_page-0001.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 31-03-2024.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 31-03-2024.pdf3 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Revised Format A - Seperate bank Ac Details.pdf16 Jan 2024
Declaration in FORM BFile: Revised Form B- Affidavit Cum Declaration.pdf4 Jan 2024
Copy of the legal title reportFile: Report on Title Report latest_compressed.pdf3 Jan 2024
Proforma of Agreement for saleFile: Final Sale Agreement Draft.pdf3 Jan 2024
Other - LegalFile: Registered Sale Deed Scan copy-1-70_compressed.pdf3 Jan 2024
Other - LegalFile: Registered Sale Deed Scan copy-71-100.pdf3 Jan 2024
Other - LegalFile: Registered Sale Deed Scan copy-101-128_compressed.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Ekdant Emperia.pdf14 Dec 2023
Proforma of Allotment letterFile: Final Allotment letter_.pdf14 Dec 2023
Deviation Report with respect to Allotment letterFile: Scan - Deviation of Allotment Letter.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate final.pdf12 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclouser of Interest in other Real Estate Organization-3 merged.pdf12 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclouser of Interest in other Real Estate Organization-merged 2.pdf12 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclouser of Interest in other Real Estate Organization-merged.pdf12 Dec 2023
Declaration about Commencement CertificateFile: Scan - Declarationabt CC.pdf11 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Scan - Deviation of Agreement for Sale_11zon.pdf11 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised CC Certificate- 29-11-2023.pdf6 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf6 Dec 2023
Building plan approvalFile: 2_11zon.pdf5 Dec 2023
Building plan approvalFile: 3_11zon.pdf5 Dec 2023
Building plan approvalFile: 4_11zon.pdf5 Dec 2023
Building plan approvalFile: 5_11zon.pdf5 Dec 2023
Building plan approvalFile: 6_11zon.pdf5 Dec 2023
Building plan approvalFile: 7_11zon.pdf5 Dec 2023
Building plan approvalFile: 8_11zon.pdf5 Dec 2023
Building plan approvalFile: 9_11zon.pdf5 Dec 2023
Building plan approvalFile: 10_11zon.pdf5 Dec 2023
Building plan approvalFile: 11_11zon.pdf5 Dec 2023
Building plan approvalFile: 12_11zon.pdf5 Dec 2023
Building plan approvalFile: 13_11zon.pdf5 Dec 2023
Building plan approvalFile: 14_11zon.pdf5 Dec 2023
Building plan approvalFile: 15_11zon.pdf5 Dec 2023
Layout approvalFile: 1_11zon.pdf5 Dec 2023
PAN CardFile: Ekdant Emperia LLP - Pan Card.pdf5 Dec 2023
Details of encumbrances concerned to FinanceFile: Self Declaration - Encumbraces to Finance.pdf5 Dec 2023
Details of encumbrances concerned to FinanceFile: Self Declaration - Encumbrance to Legal Obligation.pdf5 Dec 2023
Details of encumbrances concerned to LegalFile: Self Declaration - Encumbraces to Finance.pdf5 Dec 2023
Details of encumbrances concerned to LegalFile: Self Declaration - Encumbrance to Legal Obligation.pdf5 Dec 2023
Copy of Layout Approval (in case of layout)File: 1_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 2_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 3_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 4_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 5_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 6_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 7_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 8_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 9_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 10_11zon.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 11_11zon.pdf5 Dec 2023

How this compares with Raigarh

23%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 9 Meraki on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shedung5,900+ in Raigarh

Builder: EKDANT EMPERIA LLP

EKDANT EMPERIA LLP has 1 registration on MahaRERA, including 9 Meraki. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if 9 Meraki is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 9 Meraki?

The registered promoter entity is EKDANT EMPERIA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 9 Meraki?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 9 Meraki?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 9 Meraki?

The professionals named in the filing: Architect: An Arch; Engineer: SOMANTH KALE; Engineer: Swapnil Gurkhe; Chartered Accountant: Ms Dipika Patel & Co; Chartered Accountant: Manish Kumar Gupta and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 9 Meraki?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 9 Meraki. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 9 Meraki to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.