ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / 63 Degree East - Tower C & D

Registration approved Residential/Group Housing project

63 Degree East - Tower C & D

By APG Intelli Homes Private Limited

RG-KA-19410 · RERA PRM/KA/RERA/1251/446/PR/171030/000980

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • Separate project account declared
Mar 2021Possession promisedmoved 12 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 80 documents Report an error

63 Degree East - Tower C & D is a Residential/Group Housing project by APG Intelli Homes Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/171030/000980 on 30 Oct 2017. Possession is promised by 31 Mar 2021. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • Name63 Degree East - Tower C & D
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/171030/000980
  • ReraGenie IDRG-KA-19410

Builder

  • NameAPG Intelli Homes Private Limited
  • Entity typeCompany
  • CINU70100KA2014PTC077189
  • Authorized SignatoryAkshay Kishore Diwani
  • Other registrations6 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2017First promiseMar 2020Revised toMar 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Oct 2017
  • Promised completion31 Mar 2021
  • Revised completionRevised to 31 Mar 2021 (originally 30 Mar 2020)
  • Buildings2 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower C---3360336
Tower D---3120312

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing workNot applicable
Retaining wall (All types)Not applicable
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area28,734 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 300.85 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace matrix
EngineerRamboll India Limited

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2020 → Dec 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/200702/000980Dec 2021 → Mar 2021

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
CMP/190607/0003254-APG Intelli Homes Private Limited07/06/2019

Documents filed80

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/171030/000980 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Ann 1-Certificate of Incorporation-APG Intelli.pdf-
Certificate form Architect,Engineer,CA etc.File: Certificates.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arch_Cert_Work Compl.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer_work_Completion.pdf-
CA Certificate for Funds UtilizationFile: CA-Certi-Fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arch_Certif_Work Pend.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer_work_Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA-Certi-Fund Required.pdf-
AffidavitFile: Form B.pdf-
Latest Encumbrance CertificateFile: Latest - EC.pdf-
Relevant Document/sFile: Compansation attachment.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
NOC DetailsFile: BESCOM NOC-25.09.2018.pdf-
NOC DetailsFile: Fire - NOC-18.01.2019.pdf-
Document 1File: Covering Letter.pdf-
Document 2File: Extension Letter.pdf-
Document 3File: Affidavit.pdf-
Document 4File: Receivable Account -Axis.pdf-
Document 5File: Receivable Account -HDFC.pdf-
Document 6File: Escrow -Account.pdf-
Document 7File: Covering Letter -New.pdf-
Document 8File: Extension Letter.pdf-
Document 9File: Affidavit.pdf-
Document 10File: Registration Certificate.pdf-
Document 11File: Extension Letter.pdf-
Document 12File: Annexure 1-Notarized Affidavit Rera Prescribed Form.pdf-
Document 13File: Annexure 2-Correct Extension Date and Reason for Extension.pdf-
Document 14File: Annexure 3 -Commencement Certificate(Tower D) by Planning Authority.pdf-
Document 15File: Annexure 4 -Bank Statement Ac No 915020003352543.pdf-
Document 16File: Affidavit (D).pdf-
Document 17File: Affidavit(C).pdf-
Document 18File: Request Letter.pdf-
Document 19File: TOWER C - OCCUPANCY CERT_001.pdf-
10 BDA Building Plan Approval Letter-
BP_Clear-
Annexure - 10A - Approved layout plan-
Sale Deed 63 East Draft-
Agreement to Sell 01082017-
Title Report-
Section Plan-
Development Site Plan Snapshot-
Allotment Letter-
63šEast Handout-
Noc_2-
Specification & Amenities-1-
EC-09-Mar-2017 TO 20-Jun-2107-
khata-
Conversion Order -3 Nos-
1 FIRE NOC 21 12 2015-
2 AAI NOC-
3 BESCOM-NOC-
4 BWSSB-NOC-
6 NOC from KSPCB-
5 MoEF_Clearance-
7 BSNL NOC-
TOWER-C-SECTION & ELEVATION-
Balance Sheet 2015 - 2016File: 1 b Balance Sheet 2015 16.pdf-
Balance Sheet 2014 - 2015File: 1 a Balance Sheet 2014 15.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2 b Profit & Loss ac 2015 16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: 2 a Profit Loss ac 2014 15.pdf-
Director's Report 2015 - 2016File: 3 a Director's Report 2014 15.pdf-
Director's Report 2014 - 2015File: 3 a Director's Report 2014 15.pdf-
Cash Flow Statement 2015 - 2016File: 4 b Cash Flow Statement 2015 16.pdf-
Cash Flow Statement 2014 - 2015File: 4 a Cash Flow Statement 2014 15.pdf-
Auditor's Report 2015 - 2016File: 5 b Auditor's Report 2015 16.pdf-
Auditor's Report 2014 - 2015File: 5 a Auditor's Report 2014 15.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 6 b AY 2016 2017.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: 6 a ITR AY 2015 2016.pdf-
Form B-
Prospectus/BrochureFile: 1. 63 east, Marq & H&N.pdf-
Advertisement Copy 1File: 1. 63 east, Marq & H&N.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_171030_000980.xlsx-
Loan raised documentFile: Loan Details.pdf-
NOC issued by the Fire Force department after completion of workFile: FIRE NOC.pdf-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Consent for operation issued by KSPCBFile: KSPCB.pdf-
Architect certificate for having completed the work(in format no 5)File: Form-5 Architect 63D Tower C & D.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CA - 63D Tower C & D.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit.pdf-
Engineer CertificateFile: Form -6 Engineer 63D Tower C & D.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep 63 Degree East - Tower C & D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: APG Intelli Homes Private Limited

APG Intelli Homes Private Limited has 7 registrations on RERA Karnataka, including 63 Degree East - Tower C & D and Leaves & Lives Phase 1. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if 63 Degree East - Tower C & D is delayed beyond 31 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of 63 Degree East - Tower C & D?

The registered promoter entity is APG Intelli Homes Private Limited, a company as per the filing. Its CIN U70100KA2014PTC077189 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in 63 Degree East - Tower C & D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 63 Degree East - Tower C & D?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at 63 Degree East - Tower C & D?

The professionals named in the filing: Architect: Space matrix; Engineer: Ramboll India Limited. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 63 Degree East - Tower C & D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 63 Degree East - Tower C & D. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 63 Degree East - Tower C & D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.