Home / Browse projects / Bengaluru Urban, Karnataka / WONDERWALL PHASE III

Registration approved No litigation declared Residential/Group Housing project

WONDERWALL PHASE III

By BRICKS AND MILESTONES PROJECTS LLP

RG-KA-77113 · RERA PRM/KA/RERA/1251/308/PR/050522/004857 · Last updated on RERA Karnataka portal: 29 Apr 2022

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Mar 2027Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 150 documents Report an error

WONDERWALL PHASE III is a Residential/Group Housing project by BRICKS AND MILESTONES PROJECTS LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/050522/004857 on 5 May 2022. Possession is promised by 3 Mar 2027. 1 complaint is on record with the regulator.

At a glance

Project

  • NameWONDERWALL PHASE III
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 562125
  • Pincode562125
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/050522/004857
  • ReraGenie IDRG-KA-77113

Builder

  • NameBRICKS AND MILESTONES PROJECTS LLP
  • Entity typePartnership Firm
  • GSTIN29AASFB2952L1ZT
  • Authorized SignatoryKiran V
  • Other registrations2 more →

Key dates

this monthRegisteredMay 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 May 2022
  • Promised completion3 Mar 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed150 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A---1080108
Wing B---72072
Wing C---90090
Wing D---90090
Wing E---72072

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 29 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 29 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership30

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,055 sq m
Named landowners30
LandownerVillageDistrict
SRI SHIVAKESHAVA REDDY--
S N HEMA S--
S N HEMA S--
SHIVAKESHAVA REDDY S--
SHIVAKESHAVA REDDY S--
HEMA S--
S R ASHOK--
GOKUL REDDY--
ASHWINI ASHOK--
MANASA--
Krishna Reddy--
Hitaishree--
Vijay Kumar--
LAKSHMI--
Murali Mohan--
Amaresh Reddy--
Anju Shree--
Spoorthy K Reedy--
Master Chiranth--
SRINIVAS REDDY--
Krishna Reddy--
Srinivas Reddy--
Spoorthy Reddy--
Lakshmi--
Sri Murali Mohan--
Master Chiranth--
Ms Anju Shree--
Hithaishree--
Vijay Kumar--
Amaresh Reddy--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 142.59 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 142.59 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLakshman D N
EngineerPraveen Kumar G
Chartered AccountantMr Arjun M B

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00900/2026-BRICKS AND MILESTONES PROJECTS LLP28/07/2026

Documents filed150

As listed on the registration, under the names the promoter filed them with; the newest 80 of 150 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/050522/004857 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
1AGREEMENT FOR SALE Draft WWPH3 newFile: 1AGREEMENT FOR SALE Draft WWPH3 new.pdf29 Apr 2022
2NOC Airport AuthorityFile: 2NOC Airport Authority.pdf29 Apr 2022
3NOC FireFile: 3NOC Fire.pdf29 Apr 2022
4NOC WaterFile: 4NOC Water.pdf29 Apr 2022
5CDP Sompur VillageFile: 5CDP Sompur Village.PDF29 Apr 2022
6CDPFile: 6CDP.pdf29 Apr 2022
7GOOGLE MAPFile: 7GOOGLE MAP.pdf29 Apr 2022
8Aerial viewFile: 8Aerial view.pdf29 Apr 2022
9CDPFile: 9CDP.pdf29 Apr 2022
10Guidance value confirmation letterFile: 10Guidance value confirmation letter.pdf29 Apr 2022
11Commencement Certificate WW PH3File: 11Commencement Certificate WW PH3.pdf29 Apr 2022
Site Section and ElevationFile: 12 Site Section and Elevation.pdf29 Apr 2022
Basement Floor PlanFile: 13 Basement Floor Plan.pdf29 Apr 2022
Ground Floor PlanFile: 14 Ground Floor Plan.pdf29 Apr 2022
1st Floor PlanFile: 15 1st Floor Plan.pdf29 Apr 2022
2nd Floor PlanFile: 16 2nd Floor Plan.pdf29 Apr 2022
3rd to 7th Floor PlanFile: 17 3rd to 7th Floor Plan.pdf29 Apr 2022
8th Floor planFile: 18 8th Floor plan.pdf29 Apr 2022
9th Floor planFile: 19 9th Floor plan.pdf29 Apr 2022
Terrace Floor PlanFile: 20 Terrace Floor Plan.pdf29 Apr 2022
Form 1 RERA Wonderwall Block 3 SignedFile: 21 Form 1 RERA Wonderwall Block 3 Signed.pdf29 Apr 2022
3692 QU SCREENSHOTFile: 003692 QU Screenshot.pdf5 Apr 2022
4226 QU SCREENSHOTFile: 004226 QU Screenshot.pdf5 Apr 2022
FINANCIAL DOCUMENTS WITH UDIN NUMBERFile: 2020-21 Finacial Details with CA UDIN number.pdf5 Apr 2022
Partition Deed ashokFile: Partition Deed Ashok.pdf5 Apr 2022
Partition Deed Keshava ReddyFile: Partition Deed Shiva Keshava Reddy.pdf5 Apr 2022
Partnership DeedFile: Partnership Deed.pdf5 Apr 2022
Guidance Value CertificateFile: Guidline Value Project Wonderwall.jpeg5 Apr 2022
1St Floor PlanFile: 1st Floor.PDF5 Apr 2022
2nd Floor PlanFile: 2nd Floor bw.pdf5 Apr 2022
2nd Floor PlanFile: 2nd Floor.PDF5 Apr 2022
3rd Floor Plan to 7th Floor PlanFile: Typical 3rd to 7th Floor.PDF5 Apr 2022
8th Floor PlanFile: 8th Floor.PDF5 Apr 2022
9th Floor PlanFile: 9th Floor.PDF5 Apr 2022
BasementFile: Basement.PDF5 Apr 2022
Ground Floor PlanFile: Ground Floor.PDF5 Apr 2022
Site and Elevation PlanFile: Site Plan Section &Elevation.PDF5 Apr 2022
Terrace Floor PlanFile: Terrace Floor.PDF5 Apr 2022
Change of LanduseFile: Change of Land Use.pdf5 Apr 2022
Site PlanFile: Plan.pdf5 Apr 2022
Architect CertificateFile: Form 2 Architect Certificate.pdf5 Apr 2022
Notarised AffidavitFile: Affidavit.pdf5 Apr 2022
Panchayath NOCFile: Panchayath NOC.pdf5 Apr 2022
Airport NOCFile: Airport Authority NOC.pdf5 Apr 2022
Fire NOCFile: Fire NOC.pdf5 Apr 2022
Allotment LetterFile: Allotment Letter.pdf5 Apr 2022
Agreement of SaleFile: Agreement of Sale.pdf5 Apr 2022
RTC, survey 15/1-
Mutation, survey 15/1-
Encumbrance Certificate, survey 15/1-
Conversion/Alienation Order, survey 15/1-
JDA, survey 15/1-
Khatha, survey 15/1-
RTC, survey 15/3-
Mutation, survey 15/3-
Encumbrance Certificate, survey 15/3-
Conversion/Alienation Order, survey 15/3-
JDA, survey 15/3-
Khatha, survey 15/3-
RTC, survey 139/1-
Mutation, survey 139/1-
Encumbrance Certificate, survey 139/1-
Conversion/Alienation Order, survey 139/1-
JDA, survey 139/1-
Khatha, survey 139/1-
RTC, survey 139/2-
Mutation, survey 139/2-
Encumbrance Certificate, survey 139/2-
Conversion/Alienation Order, survey 139/2-
JDA, survey 139/2-
Khatha, survey 139/2-
RTC, survey 12/3-
Mutation, survey 12/3-
Encumbrance Certificate, survey 12/3-
Conversion/Alienation Order, survey 12/3-
JDA, survey 12/3-
Khatha, survey 12/3-
RTC, survey 21/2-
Mutation, survey 21/2-
Encumbrance Certificate, survey 21/2-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep WONDERWALL PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmWONDERWALL PHASE IIIOther 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: BRICKS AND MILESTONES PROJECTS LLP

BRICKS AND MILESTONES PROJECTS LLP has 3 registrations on RERA Karnataka, including WONDERWALL PHASE III and WONDERWALL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if WONDERWALL PHASE III is delayed beyond 3 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of WONDERWALL PHASE III?

The registered promoter entity is BRICKS AND MILESTONES PROJECTS LLP, a partnership firm as per the filing. Its GSTIN 29AASFB2952L1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in WONDERWALL PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against WONDERWALL PHASE III?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at WONDERWALL PHASE III?

The professionals named in the filing: Architect: Lakshman D N; Engineer: Praveen Kumar G; Chartered Accountant: Mr Arjun M B. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WONDERWALL PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WONDERWALL PHASE III. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WONDERWALL PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.