Home / Browse projects / Bengaluru Urban, Karnataka / SEVEN SARJAPUR

Registration approved No litigation declared Residential/Group Housing project

SEVEN SARJAPUR

By FORTUNE PRIMERO LLP

RG-KA-01692 · RERA PRM/KA/RERA/1251/308/PR/260226/008489 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Mar 2030Possession promisedno revision filed
2 of 18Construction stages donefurthest along: Upto Plinth Level, 0%
569 of 779Units unsoldnot recorded sold or booked
1Complaints at RERA Karnatakaon this registration
Jump to the 195 documents Report an error

SEVEN SARJAPUR is a Residential/Group Housing project by FORTUNE PRIMERO LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/260226/008489 on 26 Feb 2026. Possession is promised by 31 Mar 2030. 210 of the 779 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSEVEN SARJAPUR
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 562125
  • Pincode562125
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/260226/008489
  • ReraGenie IDRG-KA-01692

Builder

  • NameFORTUNE PRIMERO LLP
  • Entity typePartnership Firm
  • LLPINACB-4029
  • GSTIN29AAJFF1158R1ZQ
  • Authorized SignatoryRAAHIL REDDY

Key dates

this monthRegisteredFeb 2026PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Feb 2026
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed195 files

Current status

27%210 of 779 units booked
2.9%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 01---1640164
Tower 2---1640164
Tower 3---1640164
Tower 4---2870287

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 18 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 0%.

Building: 11% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership8

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area44,110 sq m
Named landowners8
LandownerVillageDistrict
Padma ChandraReddy--
Padma ChandraReddy--
Padma ChandraReddy--
VEMI REDDY INDRASENA REDDY--
Padma ChandraReddy--
Padma ChandraReddy--
N Chandra Reddy--
Padma ChandraReddy--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 714.60 cr
Cost incurredRs 20.71 cr
Spent of the estimate2.9%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 446.71 crRs 13.76 cr
Marketing and AdvertisementRs 84.37 crRs 2.24 cr
Payment of taxesRs 80.41 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 43.72 crRs 1.42 cr
On-site expenditure-Consultants FeesRs 12.80 crRs 1.16 cr
ContingenciesRs 12.53 crRs 1.30 cr
Marketing office and Model Aparment CostRs 11.00 cr-
On-site expenditure-Salaries of workersRs 7.00 crRs 30.00 lakh
Payment of cessRs 4.47 cr-
On-site expenditure-Site OverheadRs 4.00 crRs 38.42 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 3.59 crRs 15.00 lakh
Payment of feesRs 2.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGNANAVEL T
EngineerB.V. NAGESH
Chartered AccountantAnanth Mutalik

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01242/2026-FORTUNE PRIMERO LLP16/10/2026

Documents filed195

As listed on the registration, under the names the promoter filed them with; the newest 80 of 195 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/260226/008489 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4-CA Certificate-Q2-2026-27-Seven Sarjapur.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Fortune-Seven sarjapur-Form-5 -Q2-2026-27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-Q2-2026-276-Engineers Certificate- Seven Sarjapura.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4-CA Certificate-Q1-2026-27-Seven Sarjapur.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect Certificate-Seven Sarjapur-Form-5-Q1-2026-27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate-Seven Sarjapur-Form-6-Q1-2026-27.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4-CA working-Q4-2025-26-Seven Sarjapur.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Certificate-Seven Sarjapur-Form-5-Q4-2025-26.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate-Seven Sarjapur-Form-6-Q4-2025-26.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
1) All the sources of funds to complete the project with supporting documentsFile: 1) Source of funds- with support firm and 3-partners financial.pdf24 Feb 2026
2) Declaration of Loan and Revenue in Financial-Source of Funds suport DocumentFile: Declaration of Loan and Revenue in Financial-Source of Funds suport Document.pdf24 Feb 2026
3) Form-1-CA CertificateFile: 2) Form-1-CA Certificate.pdf24 Feb 2026
4) Loan Amount Should be deposited into RERA Designated Account as per NotificationFile: 3) Loan Amount Should be deposited into RERA Designated Account as per Notification.pdf24 Feb 2026
1) Podi MR from 425 to 425/1File: 1) Podi MR from 425 to 425-1.pdf24 Feb 2026
2) Podi MR 615 to 615/1, 615 to 615/2File: 2) Podi MR from 615 to 615-1 and 615-2.pdf24 Feb 2026
Title deed showing flow of title to the current owner is sr no 428/2 for remaining portion of 20 gunFile: 3)Absoulte Sale deed-428-2 -20G.pdf24 Feb 2026
Title deed showing flow of title to the current owner is sr no 428/2 for remaining portion of 4-08 GFile: 4) Sale Deed-428-2 -4-8G.pdf24 Feb 2026
Title deed showing flow of title to the current owner is sr no 428/2 for remaining portion of 16-04GFile: 5) Sale Deed-428-2- 16-04G.pdf24 Feb 2026
EC-Sy No 421-1-( 1-4-2024 to 16-02-2026)File: EC-Sy No 421-1-( 1-4-2024 to 16-02-2026).pdf24 Feb 2026
EC-Sy No 421-1-( 1-4-2024 to 16-02-2026)File: EC-Sy No 421-2-( 1-4-2024 to 16-02-2026).pdf24 Feb 2026
EC-Sy No 427- (1-4-2024 to 16-02-2026)File: EC-Sy No 425- 1-4-2024 to 16-02-2026.pdf24 Feb 2026
EC-Sy No 426-2B-( 1-4-2024 to 16-02-2026)File: EC-Sy No 426-2B-( 1-4-2024 to 16-02-2026).pdf24 Feb 2026
EC-Sy No 425- 1-4-2024 to 16-02-2026File: EC-Sy No 427- (1-4-2024 to 16-02-2026).pdf24 Feb 2026
EC-Sy No 421-2-( 1-4-2024 to 16-02-2026)File: EC-Sy No 428-2-( 1-4-2024 to 16-02-2026).pdf24 Feb 2026
EC-Sy No 421-1-( 1-4-2024 to 16-02-2026)File: EC-Sy No 615-( 1-4-2024 to 16-02-2026).pdf24 Feb 2026
1) Building License from Local AuthorityFile: 1) Building License Acknowledgment.pdf24 Feb 2026
2) Location details of the project , with clear demarcation of land dedicated for the project alongFile: 2)Demraction of land and Location details of the project along with boundiries.png24 Feb 2026
3) Commencement certificateFile: 3) Commencement Certificate.pdf24 Feb 2026
4) Original Site PlanFile: 1) Site Plan.pdf24 Feb 2026
5) Original Basement PlanFile: 2) Basement Plan.pdf24 Feb 2026
6) Original Ground Floor PlanFile: 3) Ground Floor Plan.pdf24 Feb 2026
7) Original First Floor PlanFile: 4) First Floor Plan.pdf24 Feb 2026
8) Original Typical, Refuge and Terrace Floor PlanFile: 5) Typical, Refuge nd Terrace Floor Plan.pdf24 Feb 2026
9) Original Sectional Floor PlanFile: 6) Sectional floor Plan.pdf24 Feb 2026
10) Original elevation PlanFile: 7) Elevation Plan.pdf24 Feb 2026
11) Change of land useFile: CL order.pdf24 Feb 2026
1) the project address and other details as per the approval plan( Survey numbers as per plan)File: Updated-1 to 5 Queries - updated-image.pdf24 Feb 2026
2) Updated plan approval number and date are not matchingFile: Updated-1 to 5 Queries - updated-image.pdf24 Feb 2026
3) Carpet Area entered in area details and development details are mis matches, kindly update the sFile: Updated-1 to 5 Queries - updated-image.pdf24 Feb 2026
4) update the area of common entrance and exit for the building /common portico/foyer/ verandah undFile: Updated-1 to 5 Queries - updated-image.pdf24 Feb 2026
5) Approval cost and Total Construction cost is not matching to CAFile: Updated-1 to 5 Queries - updated-image.pdf24 Feb 2026
6) Elaborated structural stability certificateFile: 6) Structural Stability certificate.pdf24 Feb 2026
7) BWSSB NOC/Water NocFile: 7) Water NOC.pdf24 Feb 2026
8) KIA airport NOCFile: 8) Airport NOC.pdf24 Feb 2026
9) Project brief estimate duly signed by engineerFile: 9) Estimated cost of construction.pdf24 Feb 2026
RTC, survey 421/1-
Mutation, survey 421/1-
Encumbrance Certificate, survey 421/1-
Conversion/Alienation Order, survey 421/1-
Sale/Title/Gift Deed, survey 421/1-
JDA, survey 421/1-
Khatha, survey 421/1-
RTC, survey 421/2-
Mutation, survey 421/2-
Encumbrance Certificate, survey 421/2-
Conversion/Alienation Order, survey 421/2-
Sale/Title/Gift Deed, survey 421/2-
JDA, survey 421/2-
Khatha, survey 421/2-

How this compares with Bengaluru Urban

27%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SEVEN SARJAPUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSEVEN SARJAPUROther 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: FORTUNE PRIMERO LLP

FORTUNE PRIMERO LLP has 1 registration on RERA Karnataka, including SEVEN SARJAPUR. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SEVEN SARJAPUR is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SEVEN SARJAPUR?

The registered promoter entity is FORTUNE PRIMERO LLP, a partnership firm as per the filing. Its LLPIN ACB-4029 and GSTIN 29AAJFF1158R1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SEVEN SARJAPUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SEVEN SARJAPUR?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SEVEN SARJAPUR?

The professionals named in the filing: Architect: GNANAVEL T; Engineer: B.V. NAGESH; Chartered Accountant: Ananth Mutalik. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SEVEN SARJAPUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEVEN SARJAPUR. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEVEN SARJAPUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.