Home / Browse projects / Belagavi, Karnataka / VIVA PRIDE II
VIVA PRIDE II
RG-KA-05046 · RERA PRM/KA/RERA/1249/447/PR/271026/009039 · Last updated on RERA Karnataka portal: 12 Aug 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
VIVA PRIDE II is a Residential/Group Housing project by VIVA CONSTRUCTIONS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/271026/009039 on 27 Oct 2026. Possession is promised by 2 Apr 2029.
At a glance
Project
- NameVIVA PRIDE II
- TypeResidential/Group Housing
- Location
- Belagavi
- 590006
- Pincode590006
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1249/447/PR/271026/009039
- ReraGenie IDRG-KA-05046
Builder
- NameVIVA CONSTRUCTIONS
- Entity typeProprietorship
- GSTIN29ASZPP8069R1ZY
- Authorized SignatoryPRASHANT PATIL
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Oct 2026
- Promised completion2 Apr 2029
- Revised completionNone
- Buildings1 building record
- Documents filed120 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VIVA PRIDE 2 | - | - | - | 15 | 0 | 15 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANJEEV JOSHI | - | - |
| SUMAN NARHARI SALGAONKAR | - | - |
| SAGAR NARHARI SALGAOKAR | - | - |
| SHAILESH NARHARI SALGAONKAR | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 4.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 2.00 lakh | - |
| ADMINISTRATIVE COST | Rs 1.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANIKET TASHILDAR |
| Engineer | ANIKET TASHILDAR |
| Chartered Accountant | MANJUNATH SONANE FOR M/S LATKAN ASSOCIATES |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed120
As listed on the registration, under the names the promoter filed them with; the newest 80 of 120 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/271026/009039 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Renewed Engineer LicenseFile: Licencecompressed.pdf | 12 Aug 2026 |
| the valid engineer licence of engineer who has signed the estimate and form-3File: Licencecompressed.pdf | 12 Aug 2026 |
| Affidavit for water supplyFile: Water NOC.pdf | 12 Aug 2026 |
| Notice replyFile: Notice reply.pdf | 12 Aug 2026 |
| Form 1 of CAFile: Reg 1 Viva Pride 2 Revised Form_compressed.pdf | 12 Aug 2026 |
| land cost calculationsFile: land cost calculation.pdf | 12 Aug 2026 |
| Authenticated copy of current year RTC (CTS 4627)File: CTS Joshi 2026.pdf | 17 Jul 2026 |
| Authenticated copy of current year RTC (CTS 4628)File: CTS salgoankar 2026.pdf | 17 Jul 2026 |
| connected MR (CTS 4627) showing flow of titles in favour of landownerFile: CTS Joshi 2026.pdf | 17 Jul 2026 |
| connected MR (CTS 4628) showing flow of titles in favour of landownerFile: CTS salgoankar 2026.pdf | 17 Jul 2026 |
| ABOUT TITLE DEED OF PRESENT OWNERFile: ABOUT TITLE DOCUMENT OF PRESENT LAND OWNER.pdf | 17 Jul 2026 |
| JDA between land owner and promoter (CTS 4627)File: Joshi Joint Development Agreement.pdf | 17 Jul 2026 |
| JDA between land owner and promoter (CTS 4628)File: Salgoankar Joint Development Agreement.pdf | 17 Jul 2026 |
| conversion order issued by DCFile: NA Order.pdf | 17 Jul 2026 |
| Defect free EC from 1-4-2011 to till date (CTS 4627)File: ECC- Joshi- pride 2.pdf | 17 Jul 2026 |
| Defect free EC from 1-4-2011 to till date (CTS 4628)File: ECC-Salgoankar- pride 2.pdf | 17 Jul 2026 |
| notarized affidavit in form-BFile: Form B declaration notarized .pdf | 17 Jul 2026 |
| notarized JD cum Affidavit.File: Joint affidavit .pdf | 17 Jul 2026 |
| Advocate search reportFile: legal Opinion.pdf | 17 Jul 2026 |
| Notarized No litiation affiadavit with clear mentioning land acquisation, promoter name, project addFile: no litigation affidavit .pdf | 17 Jul 2026 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land (CTS 4627)File: CTS Joshi map.pdf | 17 Jul 2026 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land (CTS 4628)File: CTS Salgoakar.pdf | 17 Jul 2026 |
| Location details of the project , demarcation of land for the project with boundaries n latitude lonFile: Location Details of Project.pdf | 17 Jul 2026 |
| original sanctioned drawingsFile: APPROVED DWG.pdf | 17 Jul 2026 |
| Original floor plan, sectional drawings and elevationsFile: APPROVED DWG.pdf | 17 Jul 2026 |
| about commencement ceritificateFile: about commencement certificate.pdf | 17 Jul 2026 |
| Demarcation of proposed land in Approved Master planFile: 15 (1).jpg | 17 Jul 2026 |
| Demarcation of proposed land in Approved Master planFile: CDP Map.pdf | 17 Jul 2026 |
| about Approval/NOC under section 14 of the KTCP ActFile: about Section 14 NOC.pdf | 17 Jul 2026 |
| about the parking lots details in development details against the individual flatsFile: ABOUT CAR PARKING ALLOTMENT.pdf | 17 Jul 2026 |
| Engineer valid renewed licenseFile: Licence__compressed.pdf | 17 Jul 2026 |
| about land costFile: CLARIFICATION OF LAND COST.pdf | 17 Jul 2026 |
| form-3 engineer certifcate duly signed by engineer whose having valid licenceFile: FORM 3 Engineers Certificate.PDF | 17 Jul 2026 |
| estimate duly signed by engineer whose having valid licenceFile: Estimatiom of the project Viva Pride II_compressed.pdf | 17 Jul 2026 |
| AFS (without possession to be removed)File: Agreement of sale.pdf | 17 Jul 2026 |
| Promforma of allotment with all necessary filling of blanksFile: Allotment Letter.pdf | 17 Jul 2026 |
| affiadvit in detail mentioning the responsibility and liability of the builder if any issues arisesFile: undertaking for water.pdf | 17 Jul 2026 |
| brief project estimation with Engineer signatureFile: summary of project estimated cost of construction.pdf | 17 Jul 2026 |
| self attested land cost calculation sheetFile: land cost calculations.pdf | 17 Jul 2026 |
| Sewer Line drawingFile: Viva Pride 2 Sewage Layout Plan.PDF | 17 Jul 2026 |
| Detailed project specification with signatureFile: Project specification with name and sign.pdf | 17 Jul 2026 |
| Detailed stability with valide engineer licenseFile: Detailed stability with valide license.pdf | 17 Jul 2026 |
| Notice ReplyFile: Notice Reply.pdf | 17 Jul 2026 |
| AUTHENTICATED COPY OF CURRENT YEAR RTC JOSHIFile: CTS Joshi 2026.pdf | 7 Jul 2026 |
| AUTHENTICATED COPY OF CURRENT YEAR RTC SALGAONKARFile: CTS salgoankar 2026.pdf | 7 Jul 2026 |
| CONNCECTED MR SHOWING FLOW OF TITLES IN FAVOUR OF LAND OWNER JOSHIFile: CTS Joshi 2026.pdf | 7 Jul 2026 |
| CONNCECTED MR SHOWING FLOW OF TITLES IN FAVOUR OF LAND OWNER SALGAONKARFile: CTS salgoankar 2026.pdf | 7 Jul 2026 |
| ABOUT TITLE DEED OF THE CURRENT LAND OWNER AS PER LATEST TRANSACTIONSFile: ABOUT TITLE DOCUMENT OF PRESENT LAND OWNER.pdf | 7 Jul 2026 |
| JDA BETWEENLAND OWNER JOSHI AND PROMOTERFile: Joshi Joint Development Agreement.pdf | 7 Jul 2026 |
| JDA BETWEEN LAND OWNER SALGAONKAR AND PROMOTERFile: Salgoankar Joint Development Agreement.pdf | 7 Jul 2026 |
| CONVERSION ORDER ISSUED BY DCFile: NA Order.pdf | 7 Jul 2026 |
| DEFECT FREE EC FROM 01/04/2011 TO TILL DATE OF JOSHIFile: ECC- Joshi- pride 2.pdf | 7 Jul 2026 |
| DEFECT FREE EC FROM 01/04/2011 TO TILL DATE OF SALGAONKARFile: ECC-Salgoankar- pride 2.pdf | 7 Jul 2026 |
| NOTARIZED AFFIDAVIT IN FORM BFile: Form B declaration notarized .pdf | 7 Jul 2026 |
| NOTARIZED JD CUM AFFIDAVITFile: Joint affidavit .pdf | 7 Jul 2026 |
| ADVOCATE SEARCH REPORTFile: legal Opinion.pdf | 7 Jul 2026 |
| NOTARIZED AFFIDAVIT OF NO LITIGATION WITH PROMOTER NAME, PROJECT ADDRESS, EXTENT, DETAIL AND LAND ETFile: no litigation affidavit .pdf | 7 Jul 2026 |
| ADLR CERTIFIED SURVEY KETCH CERTIFYING THE BOUNDARY OF PROPOSED LAND JOSHIFile: CTS Joshi map.pdf | 7 Jul 2026 |
| ADLR CERTIFIED SURVEY KETCH CERTIFYING THE BOUNDARY OF PROPOSED LAND SALGAONKARFile: CTS Salgoakar.pdf | 7 Jul 2026 |
| LOCATION DETAILS OF THE PROJECT WITH CLEAR DEMARCATION OF LAND ALONGWITH BOUNDARIES WITH L AND LFile: Location Details of Project.pdf | 7 Jul 2026 |
| ABOUT COMMENCEMENT CERTIFICATEFile: about commencement certificate.pdf | 7 Jul 2026 |
| DECARCATION OF PROPOSED LAND IN APPROVED MASTER PLANFile: 15 (1).jpg | 7 Jul 2026 |
| DEMARCATION OF PROPOSED LAND IN VILLAGE MAP CERTIFIED BY ADLR (CTS MPA)File: CTS Joshi map.pdf | 7 Jul 2026 |
| DEMARCATION OF PROPOSED LAND IN VILLAGE MAP CERTIFIED BY ADLR (CTS MPA)File: CTS Salgoakar.pdf | 7 Jul 2026 |
| ABOUT NOC UNDER SECTION 14 OF KTCPFile: about Section 14 NOC.pdf | 7 Jul 2026 |
| ABOUT PARKING SLOTSFile: ABOUT CAR PARKING ALLOTMENT.pdf | 7 Jul 2026 |
| RENEWED ENGINEER LICENSEFile: Licence__compressed.pdf | 7 Jul 2026 |
| ABOUT LAND COST DETAILSFile: land cost calculations.pdf | 7 Jul 2026 |
| CLARIFICATION ABOUT LAND COST ENTERED AS ZEROFile: CLARIFICATION OF LAND COST.pdf | 7 Jul 2026 |
| FORM 3 SIGNED BY VALID ENG LICENSEFile: FORM 3 Engineers Certificate.PDF | 7 Jul 2026 |
| SEWERLINE DRAWING WITH FULL PROJECT NAME AND ADDRESS WITH ENGINEER SIGNATUREFile: Viva Pride 2 Sewage Layout Plan.PDF | 7 Jul 2026 |
| UNDERTAKEING AFFIDAVIT FOR WATER SUPPLYFile: undertaking for water.pdf | 7 Jul 2026 |
| CORRECT AFS (WITHOUT POSSESSION IS REMOVED)File: Agreement of sale.pdf | 7 Jul 2026 |
| PROFORMA ALLOTMENT LETTER AS PER FORMAT WITH FILLED APPLICABLEFile: Allotment Letter.pdf | 7 Jul 2026 |
| Registration CertificateFile: Udyam Registration Certificate UPDATED.pdf | - |
| GST CertificateFile: GST.pdf | - |
| Certificate issued by CA Form 1File: Reg 1 Viva Pride 2 Revised Form_compressed.pdf | - |
| Certificate issued by Architect Form 2File: FORM 2 Architects Certificate.PDF | - |
| Certificate issued by Engineer Form 3File: FORM 3 Engineers Certificate.PDF | - |
| Project Chartered Accountant | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep VIVA PRIDE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Filed coordinates, straight-line distance. 64 registered projects within 2 km.
One Life Phase III ,IV & V
Ambica Infra Build
ONE LIFE PHASE I & II
Ambica Infra Build
FORTUNE TOWER
The Fortune Five
ALORA
THE FORTUNE FIVE
SHREE DATTA SMRUTI
SHREE RADHAKRISHNA DEVELOPERS
SANAVI RESIDENCY
ANIL ANNASAHEB PATIL
See every Belagavi project, with the district possession charts
Builder: VIVA CONSTRUCTIONS
VIVA CONSTRUCTIONS has 1 registration on RERA Karnataka, including VIVA PRIDE II. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if VIVA PRIDE II is delayed beyond 2 Apr 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of VIVA PRIDE II?
The registered promoter entity is VIVA CONSTRUCTIONS, a proprietorship as per the filing. Its GSTIN 29ASZPP8069R1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in VIVA PRIDE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at VIVA PRIDE II?
The professionals named in the filing: Architect: ANIKET TASHILDAR; Engineer: ANIKET TASHILDAR; Chartered Accountant: MANJUNATH SONANE FOR M/S LATKAN ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VIVA PRIDE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.