Home / Browse projects / Belagavi, Karnataka / SHREE DATTA SMRUTI

Registration approved No litigation declared Mixed Development project

SHREE DATTA SMRUTI

By SHREE RADHAKRISHNA DEVELOPERS

RG-KA-53071 · RERA PRM/KA/RERA/1249/447/PR/271023/006353 · Last updated on RERA Karnataka portal: 12 Oct 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 111 documents Report an error

SHREE DATTA SMRUTI is a Mixed Development project by SHREE RADHAKRISHNA DEVELOPERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/271023/006353 on 27 Oct 2023. Possession is promised by 31 Mar 2027.

At a glance

Project

  • NameSHREE DATTA SMRUTI
  • TypeMixed Development
  • Location
    • Belagavi
    • 590006
  • Pincode590006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1249/447/PR/271023/006353
  • ReraGenie IDRG-KA-53071

Builder

  • NameSHREE RADHAKRISHNA DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29AENFS6386L1ZX
  • Authorized SignatoryPRADIP SHIVAJIRAO CHAVAN
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on27 Oct 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE DATTA SMRUTI-----38

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 12 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 12 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceNoNot applicable
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area838 sq m
Named landowners1
LandownerVillageDistrict
Mr. DEVDATTA S/o SURESH PRABHU KHANOLKAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.50 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 7.50 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRATIKSHA P KATTIMANI
EngineerEr. KOUSTUBH J JADHAV
Chartered AccountantCA SANIL R HARGUDE

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed111

As listed on the registration, under the names the promoter filed them with; the newest 80 of 111 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/271023/006353 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
clarification about All pages LBPAS drawingFile: Clarification about approval plan pages.jpg12 Oct 2023
Plan approved by competent authorityFile: Approval drawing (2).pdf12 Oct 2023
QR code on first page on approved planFile: approved plan with QR code on first page.jpeg12 Oct 2023
BALANCE SHEET 2022-23File: BS 2022-23 (1).pdf22 Sep 2023
PROFIT AND LOSS 2022-23File: PL 2022'23 (1).pdf22 Sep 2023
SOURCE OF FUNDFile: Source of Fund_1.pdf22 Sep 2023
FORM 2- ARCH CERTIFICATEFile: Form 2.pdf22 Sep 2023
APPROVED BUILDING PERMISSION PLANFile: Approval drawing.pdf22 Sep 2023
APPROVED LBPAS SITE PLANFile: site plan.jpeg22 Sep 2023
APPROVED LBPAS BASEMENT FLOOR PLANFile: basement floor plan.jpeg22 Sep 2023
APPROVED LBPAS FIRST FLOOR PLANFile: first floor plan.jpeg22 Sep 2023
APPROVED TYPICAL LBPAS 2 TO 4TH FLOOR PLANFile: approved Typical second, third and fourth floor plan.jpeg22 Sep 2023
APPROVED LBPAS TERRACE FLOOR PLANFile: terrace floor plan.jpeg22 Sep 2023
APPROVED FRONT ELEVATIONFile: front elevation.jpeg22 Sep 2023
APPROVED SECTION PLANFile: section.jpeg22 Sep 2023
about borewell NOCFile: about borewell.jpg22 Sep 2023
Undertaking and declaration for water supplyFile: Undertaking for water supply.jpg22 Sep 2023
Demolition of old structure by project EngineerFile: Demolition letter 1.pdf22 Sep 2023
Sources of fund is not supporting by financial statementFile: Source of Funds Declaration Shree Datta Smruti PDF.pdf10 Aug 2023
Sources of fund is not supporting by financial statementFile: Trail Balance Sheet 2022-23.pdf10 Aug 2023
Upload Architects certificate with valid COA numberFile: Self Declration of COA Number PDF.pdf10 Aug 2023
Upload all sanctioned drawings Floor plans, sectional drawings and elevations.(All pages LBPAS drawFile: Clarification of Drawings Floors Plan.pdf10 Aug 2023
Uploaded the demolition certificate of the existing building.File: Demolition Certificate.pdf10 Aug 2023
Upload the copy of ZR showing the exemption of Pent house area as its shown in the break up of flatsFile: Rectification of Penthouse.pdf10 Aug 2023
Source of water mentioned as Bore well on the project detail page and uploaded the declaration insteFile: Self Declration of KGWA NOC for Shree Datta Smruti PDF-1_removed.pdf10 Aug 2023
Source of water mentioned as Bore well on the project detail page and uploaded the declaration insteFile: Water NOC Copy.pdf10 Aug 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Declaration of P&L Balance Sheet for 2 Years PDF.pdf12 Jul 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Audit Report -2021-22.pdf12 Jul 2023
GST registration certificate.File: GST Certificate Copy.pdf12 Jul 2023
What are all the sources of funds to complete the project? With supporting documents.File: Declaration of Source of Funds with Trial Balance PDF.pdf12 Jul 2023
Khata Certificate Form No-2File: Form No-2 Khata Copy 77336 & 77345.pdf12 Jul 2023
As this is a partnership firm, need to upload registered JDA between land owner and DevelopeFile: JDA CTS No-3210_compressed.pdf12 Jul 2023
Notarized Non litigation affidavit not uploaded.File: Non-Litigation Affidavit.pdf12 Jul 2023
Upload Architects certificate with valid COA numberFile: Architect Licence Copy.jpg12 Jul 2023
Built up area / Number of units in the KSPCB NOC is not matching with the sanction Plan.File: Declaration of KSPCB NOC PDF.pdf12 Jul 2023
Basement Drawings LBPASFile: SHRI_DATTA SMRUTHI BASEMENT DWG.pdf12 Jul 2023
Ground Floor Drawings LBPASFile: datta smruti ground floor for rera.pdf12 Jul 2023
First Floor Drawings LBPASFile: SHRI_DATTA SMRUTHI first floor for rera.pdf12 Jul 2023
Typical Floor Drawings LBPASFile: SHRI_DATTA SMRUTH TYPICAL FLOOR FOR RERA.pdf12 Jul 2023
Elevation Drawings LBPASFile: SHRI_DATTA SMRUTHI ELEVATION.pdf12 Jul 2023
Sectional Drawings LBPASFile: SHRI_DATTA SMRUTHI SECTION DWG.pdf12 Jul 2023
Uploaded the demolition certificate of the existing buildingFile: Rectification of Demolition Certificate Shree Datta Smruti PDF.pdf12 Jul 2023
Upload the copy of ZR showing the exemption of Pent house area as its shown in the break up of flatsFile: Rectification for Exemption of Penthouse PDF.pdf12 Jul 2023
Upload the existing building sanctioned drawing.File: Existing Building Letter .pdf12 Jul 2023
Upload the existing building sanctioned License/ OC.File: Existing Building Letter .pdf12 Jul 2023
Water NOC Fee Paid ReceiptFile: Self Declration of Water Supply Paid Receipt Shree Datta Smruti PDF.pdf12 Jul 2023
HESCOM NOC Fee Paid RecepitFile: Self Declration of HESCOM Paid Receipt for Shree Datta Smruti PDF.pdf12 Jul 2023
Please upload the STP design drawing certified by the concerned Engineer along with the STP demarcatFile: STP DRAWING SHREE DATTA SMRUTI_page-0001.pdf12 Jul 2023
Please upload the STP design drawing certified by the concerned Engineer along with the STP demarcatFile: STP Demarcation.pdf12 Jul 2023
Uploaded clarification. Please upload the permission letter issued by the concerned Karnataka GroundFile: Self Declaration of KGWA of Shree Datta Smruti PDF.pdf12 Jul 2023
Registration CertificateFile: Firm Registration Copy.pdf-
Partnership DeedFile: Old & New Partnership Deed Copy_compressed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form No-1 CA Revised Certificate.pdf-
Certificate issued by Architect Form 2File: Form 2.pdf-
Certificate issued by Engineer Form 3File: Form No-3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non=Litigation.pdf-
Certificate from Chartered AccountFile: Form No-1 CA Revised Certificate.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet 2021-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L Statement 2021-22 Audited.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2021-22.pdf-
Commencement Certificate-
HESCOM NOC-
Water NOC Copy-
Approved Plan Copy-
Sectional Drawing-
Project Specification of Shree Datta Smruti-
Approved Plan Copy-
Stability Certificate-
Advocate Search Report No-3210-
JDA CTS No-3210-
DC Conversion Order No-3210(-
GPA CTS No-3210-
Agreement of Sale Proforma Shree Datta Smruti PDF-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
J.P TOWERR.S NO-1007, CTS NO-4823/A3A, OLD P.B ROAD, NEAR EXCISE OFFICE, SUBHASH NAGAR, BELAGAVIOngoingAug 2025Not delivered

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep SHREE DATTA SMRUTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

2 kmSHREE DATTA SMRUTIOther 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 67 registered projects within 2 km.

Builder: SHREE RADHAKRISHNA DEVELOPERS

SHREE RADHAKRISHNA DEVELOPERS has 2 registrations on RERA Karnataka, including J.P TOWER and SHREE DATTA SMRUTI. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if SHREE DATTA SMRUTI is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHREE DATTA SMRUTI?

The registered promoter entity is SHREE RADHAKRISHNA DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AENFS6386L1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHREE DATTA SMRUTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHREE DATTA SMRUTI?

The professionals named in the filing: Architect: PRATIKSHA P KATTIMANI; Engineer: Er. KOUSTUBH J JADHAV; Chartered Accountant: CA SANIL R HARGUDE. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE DATTA SMRUTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE DATTA SMRUTI. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE DATTA SMRUTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.