Home / Browse projects / Belagavi, Karnataka / ONE LIFE PHASE I & II

Registration approved No litigation declared Residential/Group Housing project

ONE LIFE PHASE I & II

By Ambica Infra Build

RG-KA-42433 · RERA PRM/KA/RERA/1249/447/PR/140126/008402

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Jump to the 64 documents Report an error

ONE LIFE PHASE I & II is a Residential/Group Housing project by Ambica Infra Build in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/140126/008402 on 14 Jan 2026. Possession is promised by 30 Aug 2027.

At a glance

Project

  • NameONE LIFE PHASE I & II
  • TypeResidential/Group Housing
  • Location
    • Belagavi
    • 590006
  • Pincode590006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1249/447/PR/140126/008402
  • ReraGenie IDRG-KA-42433

Builder

  • NameAmbica Infra Build
  • Entity typePartnership Firm
  • GSTIN29ABNFA3818Q2ZN
  • Authorized SignatoryAbhijit Arvind Javalkar
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2026PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Jan 2026
  • Promised completion30 Aug 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1---40040
Tower B---40040

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,824 sq m
Named landowners2
LandownerVillageDistrict
Shri. Prabhakar Basavprabhu Kore--
Shri. Prabhakar Basavprabhu Kore--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 22.80 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 19.50 cr-
Interest on borrowingRs 3.30 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjit V Patil
EngineerMilind K Belgaonkar
Chartered AccountantKrishnanand Kamat

Documents filed64

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/140126/008402 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 94-
Mutation, survey 94-
Encumbrance Certificate, survey 94-
Conversion/Alienation Order, survey 94-
Sale/Title/Gift Deed, survey 94-
JDA, survey 94-
Khatha, survey 94-
RTC, survey 95/2-
Mutation, survey 95/2-
Encumbrance Certificate, survey 95/2-
Conversion/Alienation Order, survey 95/2-
Sale/Title/Gift Deed, survey 95/2-
JDA, survey 95/2-
Khatha, survey 95/2-
Registration CertificateFile: Partnership Reg certificate.pdf-
GST CertificateFile: GST Certificate.pdf-
Partnership DeedFile: Partnership deed_.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Format REG 1 CA Certificate One Life Phase I & II.pdf-
Certificate issued by Architect Form 2File: Architect Certificate Form-2 Phase I & II.pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate Form-3 Phase I & II.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: 4- Non Litigation One Life Phase-I & II.pdf-
Balance Sheet 2024 - 2025File: Balance Sheet & PL 24-25.pdf-
Balance Sheet 2023 - 2024File: Balance Sheet and PNL 24-25.pdf-
Balance Sheet 2022 - 2023File: Balance Sheet and PNL AY 23-24.pdf-
Audited Profit and Loss Statement 2024 - 2025File: Balance Sheet & PL 24-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Balance Sheet and PNL 24-25.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Balance Sheet and PNL AY 23-24.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR 2025-26.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR 2024-25.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR 2023-24.pdf-
Commencement Certificate-
Building Approval-
Building Approval-
To be uploaded later-
Specification-
AGREEMENT_TO_SALE_ONE LIFE PHASE I & II-
ANNEXURE- Allotment Letter__ONE LIFE PHASE I & II-
1 - Form- B Affidavit One Life Phase-I & II-
3- No Violation One Life Phase-I & II (1)-
2- JDA Affiadavit One Life Phase-I & II-
LEGAL OPINION-RERA-
NOC from HESCOM Belgavi-
Water NOC_merged-
KSPCB (3)-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
CDP Map-
Irrecovable General Power of Attorney-
Single layout BUDA letter-
Single Layout plan with Amalgamation-
Estimation -

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep ONE LIFE PHASE I & II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

2 kmONE LIFE PHASE I & IIOther 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: Ambica Infra Build

Ambica Infra Build has 2 registrations on RERA Karnataka, including ONE LIFE PHASE I & II and One Life Phase III ,IV & V. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if ONE LIFE PHASE I & II is delayed beyond 30 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ONE LIFE PHASE I & II?

The registered promoter entity is Ambica Infra Build, a partnership firm as per the filing. Its GSTIN 29ABNFA3818Q2ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ONE LIFE PHASE I & II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ONE LIFE PHASE I & II?

The professionals named in the filing: Architect: Ajit V Patil; Engineer: Milind K Belgaonkar; Chartered Accountant: Krishnanand Kamat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE LIFE PHASE I & II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE LIFE PHASE I & II. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE LIFE PHASE I & II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.