Registration approved Residential/Group Housing project

Vishal’s Soni Sankul

By Vishal Constructions and Developers

RG-KA-17084 · RERA PRM/KA/RERA/1249/447/PR/190823/002814

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jun 2021Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 48 documents Report an error

Vishal’s Soni Sankul is a Residential/Group Housing project by Vishal Constructions and Developers in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/190823/002814 on 23 Aug 2019. Possession is promised by 30 Jun 2021. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameVishal’s Soni Sankul
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/190823/002814
  • ReraGenie IDRG-KA-17084

Builder

  • NameVishal Constructions and Developers
  • Entity typePartnership Firm
  • Authorized SignatoryVijay Bharma Patil

Key dates

this monthRegisteredAug 2019First promiseSep 2020Revised toJun 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Aug 2019
  • Promised completion30 Jun 2021
  • Revised completionRevised to 30 Jun 2021 (originally 30 Sep 2020)
  • Buildings1 building record
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vishal's Soni Sankul---25025

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,012 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.95 cr

Certifying professionals and partners1

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerVinay Behere

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionSep 2020 → Jun 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/190823/002814 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration of Firm.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate of Work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Eng Certificate of Work completed.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate for Fund Utilisation.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate of Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer's Certificate of Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate for Fund Required.pdf-
AffidavitFile: AFFIDAVIT (2).pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Consent letter from 2/3rd of AllotteesFile: Consent_compressed.pdf-
Details Of Sold/ Un-sold UnitsFile: sold - unsold inventories.pdf-
CC-
Building plan-
Building plan-
Not yet done-
Not yet done-
sale deed-
Building plan-
Building plan-
Not yet done-
Not yet done-
specification-
EC-
affidavit-
affidavit cum declaration-
kahata-
JDA and GPA-
Fire NOC-
HESCOM NOC-
NOC of KUWS of SONI SANKUL page 1-
Pollution NOC-
Building plan-
Building plan-
NA order-
Balance Sheet 2017 - 2018File: Balance Sheet 2017-18.jpg-
Balance Sheet 2016 - 2017File: Balance Sheet 2016-17.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 2015-16.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P and L 2017-18.jpg-
Audited Profit and Loss Statement 2016 - 2017File: P and L 2016-17.jpg-
Audited Profit and Loss Statement 2015 - 2016File: P and L 2015-16.jpg-
Auditor's Report 2017 - 2018File: audit report 2017-18.jpg-
Income Tax Return Acknowledgement 2017 - 2018File: IT Ack 2018-19.jpg-
Income Tax Return Acknowledgement 2016 - 2017File: IT ack 2017-18.jpg-
Income Tax Return Acknowledgement 2015 - 2016File: IT ack 2016-17.jpg-
declaration-
Prospectus/BrochureFile: Not yet done.pdf-
Advertisement Copy 1File: Not yet done.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1249_447_PR_190823_002814.xlsx-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one moved by 9 months
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep Vishal’s Soni Sankul on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: Vishal Constructions and Developers

Vishal Constructions and Developers has 1 registration on RERA Karnataka, including Vishal’s Soni Sankul. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if Vishal’s Soni Sankul is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Vishal’s Soni Sankul?

The registered promoter entity is Vishal Constructions and Developers, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Vishal’s Soni Sankul?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Vishal’s Soni Sankul?

The professionals named in the filing: Engineer: Vinay Behere. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vishal’s Soni Sankul?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vishal’s Soni Sankul. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vishal’s Soni Sankul to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.