Home / Browse projects / Belagavi, Karnataka / VIGHNARAJENDRA IDEAL HOMES
VIGHNARAJENDRA IDEAL HOMES
By M/s SHREE VIGHNARAJENDRA DEVELOPERS
RG-KA-95088 · RERA PRM/KA/RERA/1249/447/PR/250124/006573 · Last updated on RERA Karnataka portal: 14 Jan 2026
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
Saved.
VIGHNARAJENDRA IDEAL HOMES is a Residential/Group Housing project by M/s SHREE VIGHNARAJENDRA DEVELOPERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/250124/006573 on 25 Jan 2024. Possession is promised by 31 Mar 2026. The completion date has moved by 12 months from the original filing. 0 of the 13 units on this registration are recorded sold or booked, and 14 of 14 construction stages are filed complete.
At a glance
Project
- NameVIGHNARAJENDRA IDEAL HOMES
- TypeResidential/Group Housing
- Location
- Belagavi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1249/447/PR/250124/006573
- ReraGenie IDRG-KA-95088
Builder
- NameM/s SHREE VIGHNARAJENDRA DEVELOPERS
- Entity typePartnership Firm
- GSTIN29AETFS7616H1Z9
- Authorized SignatoryMr. VIJAYAMAHANTESH. RAJASHEKARAYYA. SALIMATH
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on25 Jan 2024
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2025)
- Buildings1 building record
- Documents filed159 files
Current status
Figures as on 14 Jan 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VIGHNARAJENDRA IDEAL HOMES | - | - | - | 13 | 0 | 13 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 14 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 14 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | No | Not applicable |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mrs. Sarala Shivanad Herekar | - | - |
| Mrs. Gouri Basavraj Anapur | - | - |
| Mr. Vivek Ganappa Herekar | - | - |
| Mr. Sadanand Ganappa Herekar | - | - |
| Mr. Basavaraj Ganappa Herekar | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 2.30 cr | Rs 21.22 lakh |
| Payment of taxes | Rs 2.92 lakh | Rs 34,720 |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | - | Rs 19,600 |
| Principal sum and interest payable to financial institutions-Scheduled Banks | - | Rs 3.59 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Pooja. P Varadai |
| Engineer | Er. AJAY SALIMATH |
| Chartered Accountant | Krishnamurthy. V. Deshpande |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterothers
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed159
As listed on the registration, under the names the promoter filed them with; the newest 80 of 159 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/250124/006573 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Dec-2025.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Dec-2025.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Dec-2025.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Renewal Order CopyFile: Plan Renewal Order Copy.pdf | 24 Sep 2025 |
| Renewal Approved PlanFile: Rectification for Renewal Plan with Supporting Documents.pdf | 24 Sep 2025 |
| Approved PlanFile: Approved Plan Clear Copy.pdf | 24 Sep 2025 |
| Rectification Leter for Extension QueryFile: Letter for Extension Certificate.pdf | 24 Sep 2025 |
| Renewal Order & Plan CopyFile: Plan Renewal Ordee & Plan Copy.pdf | 24 Sep 2025 |
| Renewal Fee ReceiptFile: Renewal Fee Receipt.pdf | 24 Sep 2025 |
| Upload the Renewal Order Copy and Renewal PlanFile: Rectification for Renewal Plan with Supporting Documents.pdf | 20 Jul 2025 |
| Upload the Renewal Order Copy and Renewal PlanFile: Plan Renewal Order Copy.pdf | 20 Jul 2025 |
| Upload the Renewal Order Copy and Renewal PlanFile: Approved Plan Clear Copy.pdf | 20 Jul 2025 |
| Upload the Renewal Order Copy and Renewal PlanFile: Renewal Fee Receipt.pdf | 20 Jul 2025 |
| Undertaking Cum Declaration Letter for NoticeFile: Undertaking Cum Rectification of Notice 04-01-2024 PDF.pdf | 14 Jan 2024 |
| Area is not reflected in sanctioned plan, please legible planFile: Layout Plan (2).pdf | 14 Jan 2024 |
| Area is not reflected in sanctioned plan, please legible planFile: Approved Plan Clear Copy.pdf | 14 Jan 2024 |
| What are all the sources of funds to complete the project? With supporting documentsFile: Source of Funds Pre-Approval Letter.pdf | 14 Jan 2024 |
| What are all the sources of funds to complete the project? With supporting documentsFile: Declaration of Source of Funds with FD Copy.pdf | 14 Jan 2024 |
| Upload layout plan to verify area measurementFile: Layout Area Meaurement with Declaration.pdf | 20 Dec 2023 |
| What are all the sources of funds to complete the project? With supporting documentsFile: Source of Funds with All Copy_compressed.pdf | 20 Dec 2023 |
| Upload profit and loss account and balance sheet 2020-21, 2021-22File: Declaration of P&L 2 Years.pdf | 20 Dec 2023 |
| Upload katha extract issued from the belagavi city corporation, instead of assessment register extrFile: Form No-2 Khata Extract with Declaration.pdf | 20 Dec 2023 |
| Declaration LetterFile: Undertaking Cum Rectification of Notice PDF.pdf | 7 Dec 2023 |
| 2022-23 Profit and Loss account and Balance Sheet with CA UDINFile: Vighnarajendra P&L.pdf | 7 Dec 2023 |
| Layout Plan to verify Area MeasurementFile: Layout Area Measurement with Letter.pdf | 7 Dec 2023 |
| Passbook/Pass Sheets of 100%File: RERA 100%.pdf | 7 Dec 2023 |
| Passbook/Pass sheets of 30% Account DetailsFile: RERA 30%.pdf | 7 Dec 2023 |
| supportive documents for borrowing and unsecured loansFile: Undertaking Cum Rectification of Notice PDF.pdf | 7 Dec 2023 |
| Borrowing and unsecured loan details are not mentioned in the sources of fundsFile: Undertaking Cum Rectification of Notice PDF.pdf | 7 Dec 2023 |
| Borrowing details are not mentioned in the CA certificateFile: Undertaking Cum Rectification of Notice PDF.pdf | 7 Dec 2023 |
| Financial Statements with attested from CAFile: Vighnarajendra P&L.pdf | 7 Dec 2023 |
| Katha Extract issued from the Belagavi City CorporationFile: Form No-2 & Form No-1 Khata.pdf | 7 Dec 2023 |
| passbook/ pass sheets of 100% & 30% account detailsFile: RERA Bank Account Letter.pdf | 7 Dec 2023 |
| Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along withFile: Vighnarajendra P&L.pdf | 15 Nov 2023 |
| Upload layout plan to verify area measurementFile: NA Layout Plan Copy.pdf | 15 Nov 2023 |
| Upload passbook/ pass sheets of 100% & 30% account details, the bank account name should be as per tFile: RERA Bank Account Letter.pdf | 15 Nov 2023 |
| Upload supportive documents for borrowing and unsecured loansFile: Undertaking Cum Rectification of Unsecured Funds PDF.pdf | 15 Nov 2023 |
| Borrowing and unsecured loan details are not mentioned in the sources of fundsFile: Source of Funds Declaration Vignarajendra Ideal Homes PDF.pdf | 15 Nov 2023 |
| Borrowing details are not mentioned in the CA certificateFile: Undertaking Cum Rectification of Unsecured Funds PDF.pdf | 15 Nov 2023 |
| Upload financial statements with attested from CAFile: Vighnarajendra P&L.pdf | 15 Nov 2023 |
| Title deed of the land ownerFile: Flow of Title Marathi to Kannada Translate with Notorized.pdf | 15 Nov 2023 |
| Title deed of the land ownerFile: Title Deed (Marathi Copy).pdf | 15 Nov 2023 |
| katha extract issued from the belagavi city corporationFile: Form No-2 Khata Copy.pdf | 15 Nov 2023 |
| advocate search reportFile: Advocate Search Report.pdf | 15 Nov 2023 |
| FAR As per the sanction Plan is Not Matching with the details EnteredFile: Self Declration of FAR PDF.pdf | 15 Nov 2023 |
| Built up area Mentioned in the project details Page not matching with the sanction plan clarify / upFile: Certified Built Up Area & Plinth Area Details PDF.pdf | 15 Nov 2023 |
| Height of the building mentioned in the development details page is not matching with the sanction pFile: Rectification of Building Height PDF.pdf | 15 Nov 2023 |
| Upload commencement certificateFile: Self Declration of Commenecement Certificate Vignarajendra Ideal Homes PDF.pdf | 15 Nov 2023 |
| Upload KSPCB CFEFile: Self Declration of KSPCB NOC for Vighnarajendra Ideal PDF.pdf | 15 Nov 2023 |
| Please update the detailed Amenities and common area details properly as per the sanctioned drawingFile: Certified Common Area.pdf | 15 Nov 2023 |
| Please upload the permission letter issued by the Karnataka Groundwater Authority along with the borFile: KGWA NOC PDF.pdf | 15 Nov 2023 |
| Please upload the building area calculation sheet (built up area, plinth area, etc.)certified by theFile: Certified Built Up Area & Plinth Area Details PDF.pdf | 15 Nov 2023 |
| Clarify the height of the building in case of pent house with the supporting documents and ZRFile: Rectification of Building Height as Per ZR.pdf | 15 Nov 2023 |
| Please upload the Land calculation sheet as per the guidance value(self-attested copy).File: Self Declration of Land Value Calculaion for Vignarajendra Ideal Homes PDF.pdf | 15 Nov 2023 |
| profit and loss account and balance sheet 2020-21, 2021-22File: Declaration of P&L Balance Sheet for 2 Years PDF.pdf | 15 Nov 2023 |
| Registration CertificateFile: Firm Registration Certificate.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form No-1 CA.pdf | - |
| Certificate issued by Architect Form 2File: Form No-2 Architect.pdf | - |
| Certificate issued by Engineer Form 3File: Form No-3 Engineer (PR).pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation.pdf | - |
| Certificate from Chartered AccountFile: Form No-1 CA.pdf | - |
| Balance Sheet 2022 - 2023File: Financial 2022-23.pdf | - |
| Balance Sheet 2021 - 2022File: Declaration of P&L Balance Sheet for 3 Years PDF.pdf | - |
| Balance Sheet 2020 - 2021File: Declaration of P&L Balance Sheet for 3 Years PDF.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Financial 2022-23.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Declaration of P&L Balance Sheet for 3 Years PDF.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Declaration of P&L Balance Sheet for 3 Years PDF.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR 2023-24.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: Declaration of P&L Balance Sheet for 3 Years PDF.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: Declaration of P&L Balance Sheet for 3 Years PDF.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep VIGHNARAJENDRA IDEAL HOMES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: M/s SHREE VIGHNARAJENDRA DEVELOPERS
M/s SHREE VIGHNARAJENDRA DEVELOPERS has 1 registration on RERA Karnataka, including VIGHNARAJENDRA IDEAL HOMES. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if VIGHNARAJENDRA IDEAL HOMES is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of VIGHNARAJENDRA IDEAL HOMES?
The registered promoter entity is M/s SHREE VIGHNARAJENDRA DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AETFS7616H1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in VIGHNARAJENDRA IDEAL HOMES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at VIGHNARAJENDRA IDEAL HOMES?
The professionals named in the filing: Architect: Ar. Pooja. P Varadai; Engineer: Er. AJAY SALIMATH; Chartered Accountant: Krishnamurthy. V. Deshpande. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VIGHNARAJENDRA IDEAL HOMES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback