ReraGenieLog inGet a buyer report

Home / Browse projects / Kalaburagi, Karnataka / VASANT RESIDENCY

Registration approved No litigation declared Residential/Group Housing project

VASANT RESIDENCY

By M S CONSTRUCTIONS

RG-KA-80979 · RERA PRM/KA/RERA/1263/419/PR/271123/006436 · Last updated on RERA Karnataka portal: 24 Nov 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 135 documents Report an error

VASANT RESIDENCY is a Residential/Group Housing project by M S CONSTRUCTIONS in Kalaburagi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1263/419/PR/271123/006436 on 27 Nov 2023. Possession is promised by 31 Mar 2028.

At a glance

Project

  • NameVASANT RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Kalaburagi
    • 585102
  • Pincode585102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1263/419/PR/271123/006436
  • ReraGenie IDRG-KA-80979

Builder

  • NameM S CONSTRUCTIONS
  • Entity typePartnership Firm
  • GSTIN29ABRFM3497K1Z9
  • Authorized SignatorySYED OSMAN FAROOQ

Key dates

this monthRegisteredNov 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on27 Nov 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed135 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VASANT RESIDENCY---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 24 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Sewage Treatment Plant (STP)Yes-
Electricity supply transformer and substationYes-
Internal Roads & FootpathsNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area446 sq m
Named landowners2
LandownerVillageDistrict
ANIL KUMAR MASHALKAR--
SUNIL VASANTRAO MASHALKAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.88 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.88 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFIRDOUS KHANAM
EngineerMOHAMMED WAJEED ALI
Chartered AccountantMOHAMMED KHAJA MOINUDDIN

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed135

As listed on the registration, under the names the promoter filed them with; the newest 80 of 135 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1263/419/PR/271123/006436 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Uploaded Affidavit Cum Declaration regarding clarification with allotment relevant documentFile: Affidavit Cum Declaration regarding clerification on allotment certificate.pdf24 Nov 2023
Uploaded balance sheet 2021-22 with CA UDINFile: Balance sheet With UDIN 2021-22.pdf8 Nov 2023
Uploaded balance sheet 2022-23 with CA UDINFile: Balance sheet With UDIN 2022-23.pdf8 Nov 2023
Uploaded profit and loss account 2021-22 with CA UDINFile: Profit & Loss With UDIN 2021-22.pdf8 Nov 2023
Uploaded profit and loss account 2022-23 with CA UDINFile: Profit & Loss With UDIN 2022-23.pdf8 Nov 2023
Declaration regarding sources of funds to complete the projectFile: Declaration Regarding Source of fund.pdf8 Nov 2023
Uploaded CTS copyFile: CTS Copy.pdf8 Nov 2023
Uploaded conversion order issued by the deputy commissionerFile: conversion order issued by the deputy commissioner.pdf8 Nov 2023
Uploaded advocate search reportFile: Advacate Search report.pdf8 Nov 2023
Declaration regarding FAR As per the sanction Plan is Not Matching with the details EnteredFile: Declaration regarding FAR As per the sanction Plan is Not Matching.pdf8 Nov 2023
Uploaded Single plot layoutFile: Single plot layout.pdf8 Nov 2023
Uploaded Single plot layout OrderFile: Single plot layout Order.pdf8 Nov 2023
Uploaded certified Carpet area calculationFile: Certified Carpet area calculation.pdf8 Nov 2023
Uploaded CDP map showing the proposed siteFile: CDP Map showing proposed site.pdf8 Nov 2023
uploaded self-attested copy of the Engineer's license certificateFile: Registration Certificate with seal & signiture.pdf8 Nov 2023
Uploaded the visible sanctioned drawingFile: Visible sanctioned drawing.pdf8 Nov 2023
Uploaded Declaration self-attested copy and NOC issued by the Power supplyFile: Declaration self-attested copy and NOC issued by the Power supply.pdf8 Nov 2023
Land cost detail as per the guidance value issued by Sub Registered KalaburagiFile: Land cost detail as per the guidance value issued by Sub Registered Kalaburagi.pdf8 Nov 2023
BALANCE SHEET P&LFile: BALANCE SHEET P&L.pdf24 Oct 2023
DC LETTERFile: DC LETTER.pdf24 Oct 2023
DESIGN STP PLANFile: DESIGN STP PLAN.pdf24 Oct 2023
ENGR REGFile: ENGR REG.jpeg24 Oct 2023
ESTIMATE COPYFile: ESTIMATE COPY.pdf24 Oct 2023
GESCOM NOCFile: GESCOM NOC.pdf24 Oct 2023
GUIDELINE VAULE BY SRFile: GUIDELINE VAULE BY SR.pdf24 Oct 2023
ITR BALANCE SHEET P&L FOR FY 2021-22File: ITR BALANCE SHEET P&L FOR FY 2021-22.pdf24 Oct 2023
ITR BALANCE SHEET P&L FOR FY 2022-23File: ITR BALANCE SHEET P&L FOR FY 2022-23.pdf24 Oct 2023
KHATHA TAX PAIDFile: KHATHA TAX PAID.pdf24 Oct 2023
KUWSDB NOCFile: KUWSDB NOC.pdf24 Oct 2023
LATEST KHATHAFile: LATEST KHATHA.pdf24 Oct 2023
STP DETAILSFile: STP DETAILS.pdf24 Oct 2023
VILLAGE MAP DEMARCATEDFile: VILLAGE MAP DEMARCATED.pdf24 Oct 2023
AFFIDAVIT SECTION 3 NOTARIZEDFile: AFFIDAVIT SECTION 3.pdf28 Sep 2023
APPROVED PLANFile: APPROVED PLAN.pdf28 Sep 2023
DC LETTERFile: DC LETTER.pdf28 Sep 2023
EC 2003 to 2022File: EC 2003 to 2022.pdf28 Sep 2023
EC 2003 to 2023File: EC 2003 to 2023.pdf28 Sep 2023
EC TILL DATEFile: EC TILL DATE.pdf28 Sep 2023
ENGR REGFile: ENGR REG.jpeg28 Sep 2023
FIRM PANFile: FIRM PAN.jpeg28 Sep 2023
FIRM REG FORM CFile: FIRM REG FORM C.pdf28 Sep 2023
GESCOM NOCFile: GESCOM NOC.pdf28 Sep 2023
GUIDELINE VAULE BY SRFile: GUIDELINE VAULE BY SR.pdf28 Sep 2023
ITR BALANCE SHEET P&L FOR FY 2021-22File: ITR BALANCE SHEET P&L FOR FY 2021-22.pdf28 Sep 2023
ITR BALANCE SHEET P&L FOR FY 2022-23File: ITR BALANCE SHEET P&L FOR FY 2022-23.pdf28 Sep 2023
KHATHAFile: KHATHA.pdf28 Sep 2023
KUWSDB NOCFile: KUWSDB NOC.pdf28 Sep 2023
Partnership Deed RegisteredFile: Partnership Deed Registered.pdf28 Sep 2023
STP DRAWINGSFile: STP DRAWINGS.pdf28 Sep 2023
VILLAGE MAP DEMARCATEDFile: VILLAGE MAP DEMARCATED.pdf28 Sep 2023
Registration CertificateFile: FIRM REG.pdf-
Partnership DeedFile: Partnership Deed Registered.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Certificate issued by CA Form 1.pdf-
Certificate issued by Architect Form 2File: Certificate issued by Architect Form 2.pdf-
Certificate issued by Engineer Form 3File: Certificate issued by Engineer Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: AFFIDAVIT NON LITIGATION.pdf-
Certificate from Chartered AccountFile: Certificate from CA.pdf-
Balance Sheet 2021 - 2022File: BS PL 21-22.pdf-
Balance Sheet 2020 - 2021File: BS PL 21-22.pdf-
Balance Sheet 2019 - 2020File: BS PL 21-22.pdf-
Audited Profit and Loss Statement 2021 - 2022File: BS PL 21-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: BS PL 21-22.pdf-
Audited Profit and Loss Statement 2019 - 2020File: BS PL 21-22.pdf-
Director's Report 2021 - 2022File: BS PL 21-22.pdf-
Director's Report 2020 - 2021File: BS PL 21-22.pdf-
Director's Report 2019 - 2020File: BS PL 21-22.pdf-
Cash Flow Statement 2021 - 2022File: BS PL 21-22.pdf-
Cash Flow Statement 2020 - 2021File: BS PL 21-22.pdf-
Auditor's Report 2021 - 2022File: BS PL 21-22.pdf-
Auditor's Report 2020 - 2021File: BS PL 21-22.pdf-
Auditor's Report 2019 - 2020File: BS PL 21-22.pdf-

How this compares with Kalaburagi

32%of Kalaburagi projects moved their completion datethis one has not
0%of Kalaburagi registrations are shown as withdrawn or revokedthis one is not

Computed across the 210+ Kalaburagi projects on ReraGenie, from their own filings.

Keep VASANT RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kalaburagi210+ in Kalaburagi

2 kmVASANT RESIDENCYOther 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: M S CONSTRUCTIONS

M S CONSTRUCTIONS has 1 registration on RERA Karnataka, including VASANT RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Kalaburagi district page.

Frequently asked questions

What are my rights if VASANT RESIDENCY is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of VASANT RESIDENCY?

The registered promoter entity is M S CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29ABRFM3497K1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in VASANT RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at VASANT RESIDENCY?

The professionals named in the filing: Architect: FIRDOUS KHANAM; Engineer: MOHAMMED WAJEED ALI; Chartered Accountant: MOHAMMED KHAJA MOINUDDIN. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VASANT RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VASANT RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VASANT RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.