Home / Browse projects / Kalaburagi, Karnataka / S.R. NAJMA TOWER

Registration approved No litigation declared Commercial project

S.R. NAJMA TOWER

By S R Constructions

RG-KA-61509 · RERA PRM/KA/RERA/1263/419/PR/060525/007713 · Last updated on RERA Karnataka portal: 7 Feb 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 116 documents Report an error

S.R. NAJMA TOWER is a Commercial project by S R Constructions in Kalaburagi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1263/419/PR/060525/007713 on 6 May 2025. Possession is promised by 12 Jun 2025.

At a glance

Project

  • NameS.R. NAJMA TOWER
  • TypeCommercial
  • Location
    • Kalaburagi
    • 585102
  • Pincode585102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1263/419/PR/060525/007713
  • ReraGenie IDRG-KA-61509

Builder

  • NameS R Constructions
  • Entity typePartnership Firm
  • GSTIN29ACCFS2533C1ZE
  • Authorized SignatoryMohammad Shafeeq ur Rahman
  • Other registrations4 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2025PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 May 2025
  • Promised completion12 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed116 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
S.R. NAJMA TOWER---03131

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 7 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 7 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area743 sq m
Named landowners1
LandownerVillageDistrict
MOHMMED GALIB PASHA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.32 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.32 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiraj Ahmed
EngineerMohammed Irfan
Chartered AccountantAmogh Srikant Dharwadkar

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed116

As listed on the registration, under the names the promoter filed them with; the newest 80 of 116 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1263/419/PR/060525/007713 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA CertificateFile: CA Certificate.pdf7 Feb 2025
form 1 CAFile: FORM 1 CA.pdf20 Jan 2025
Mutation copyFile: Mutation copy.pdf20 Jan 2025
Najma begum death certificateFile: Najma Begum - Death Certificate.pdf20 Jan 2025
commencement certificateFile: commencement certificate.pdf20 Jan 2025
KSPCBFile: KSPCB.pdf20 Jan 2025
CDP MAPFile: CDP Map of SR Najma Tower.pdf20 Jan 2025
GUIDANCE VALUE CERTIFICATEFile: Land cost calculation sheet as per the guidance va.pdf20 Jan 2025
INVENTORY SIGNED BY ENGINEERFile: Inventory Details Signed by Engineer.pdf20 Jan 2025
NA ORDER COPYFile: NA ORDER COPY.pdf20 Jan 2025
engineer licenseFile: engineer certificate.pdf20 Jan 2025
Joint Development NajmaFile: Joint Development NAJMA.pdf20 Jan 2025
Declaration for FAR mentionedFile: Declaration for FAR mentioned.pdf25 Apr 2024
Self-attested Land cost calculation as per guidance valueFile: Land cost calculation sheet as per the guidance va.pdf25 Apr 2024
Water NOC Request letterFile: Waterboard NOC Applied CopySelf Attested (1).pdf25 Apr 2024
Latest RTCFile: RTC.pdf25 Apr 2024
CA Certificate - FORM-1File: Form-1 CA.pdf25 Apr 2024
Mutation RecordFile: Mutation copy.pdf25 Apr 2024
Village MapFile: Village Map_001.jpg25 Apr 2024
Commencement CertificateFile: Permission copy.pdf25 Apr 2024
Structural SafetyFile: SAFETY CERTIFICATE.pdf25 Apr 2024
Engineer Certificate- FORM 3File: FORM3.pdf25 Apr 2024
Area DetailsFile: Area Details.pdf25 Apr 2024
KSPCB CFE NOC DeclarationFile: Declaration for KSPCB CFE NOC.pdf25 Apr 2024
STP Drawing DeclarationFile: Declaration for STP Drawing.pdf25 Apr 2024
Engineer License CertificateFile: Declaration for Engineer license certificate.pdf25 Apr 2024
Declaration for Single plot LayoutFile: Declaration for Single plot layout.pdf25 Apr 2024
CDP MapFile: CDP Map of SR Najma Tower.pdf25 Apr 2024
AmenitiesFile: ameneties.pdf25 Apr 2024
Encumbrance CertificateFile: EC Upto 26-03-2024.pdf2 Apr 2024
Latest KhathaFile: Khata.pdf2 Apr 2024
Advocate Search ReportFile: Title Report.pdf2 Apr 2024
Permission CopyFile: Permission copy.pdf2 Apr 2024
Town Planning, Village MapFile: Town Planning, Village Map.pdf2 Apr 2024
Premium FAR Copy (Approved Plan)File: Approved Plan.pdf2 Apr 2024
GST CertificateFile: SR Construction - GST Copy.pdf2 Apr 2024
Financials Combined profit and loss account, balance sheet & ITR, (2021-22, 2022-23 & 2023-24)File: SR Constructions-IT Assessment YEAR 2023-24_compressed.pdf2 Apr 2024
Financials Combined profit and loss account, balance sheet & ITR, (2021-22, 2022-23 & 2023-24)File: SR Constructions-IT Assessment YEAR 2022-23_compressed.pdf2 Apr 2024
Financials Combined profit and loss account, balance sheet & ITR, (2021-22, 2022-23 & 2023-24)File: SR Constructions-IT Assessment YEAR 2021-22_compressed.pdf2 Apr 2024
MutationFile: Mutation copy.pdf2 Apr 2024
Declaration for Relinquishment DeedFile: Declaration for Relinquishment Deed.pdf2 Apr 2024
Bank Details MergedFile: Bank Merged.pdf2 Apr 2024
Bank AffidavitFile: Bank Affidavit.pdf2 Apr 2024
CA Registration CertificateFile: CA-Self Attested Registration copy.pdf2 Apr 2024
current year RTCFile: SR Najma Towers-RTC.pdf2 Apr 2024
Certified Carpet AreaFile: Certified Carpet Area.pdf2 Apr 2024
Engineer Certificate- FORM 3File: FORM 3.pdf2 Apr 2024
Engineer Registration CertificateFile: Engineer License Self Attested.pdf2 Apr 2024
Amenities and Common area detailsFile: Amenities & project details.pdf2 Apr 2024
Details of Exclusive Common Area Allottee, Common Area Alloted To Association, Undivided Share and NFile: Inventory Details Signed by Engineer.pdf2 Apr 2024
GESCOMFile: GESCOME NOC SELF ATTESTED.pdf2 Apr 2024
GESCOM PaymentFile: GESCOME PAYMENT SELF ATTESTED.pdf2 Apr 2024
Brief estimated cost of construction certified by the engineerFile: Brief estimated cost of construction.pdf2 Apr 2024
Land cost calculation sheet as per the guidance valueFile: Land cost calculation sheet as per the guidance value.pdf2 Apr 2024
Project SpecificationsFile: PROJECT SPECIFICATION.pdf2 Apr 2024
Chartered accountant certificate in prescribed format form -01 in new formatFile: Form-1 CA.pdf2 Apr 2024
Water NOCFile: Waterboard NOC Applied Copy-Self Attested.pdf2 Apr 2024
Declaration for FAR mentionedFile: Declaration for FAR mentioned.pdf2 Apr 2024
Agreement of Sale Proforma final-S R Najma TowerFile: Agreement of Sale Proforma final-S R Najma Tower.pdf2 Apr 2024
Permission LetterFile: Permission copy.pdf2 Apr 2024
Permission ReceiptFile: Permission Payment Receipt.pdf2 Apr 2024
RTC, survey 73-
Mutation, survey 73-
Encumbrance Certificate, survey 73-
Sale/Title/Gift Deed, survey 73-
JDA, survey 73-
Khatha, survey 73-
Registration CertificateFile: RC.pdf-
GST CertificateFile: SR Construction - GST Copy.pdf-
Partnership DeedFile: SR PARTNERSHIP DEED.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form-1 CA.pdf-
Certificate issued by Architect Form 2File: FORM-2 ARCHIETECT CERTIFICATE (PR).pdf-
Certificate issued by Engineer Form 3File: FORM3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation.pdf-
Certificate from Chartered AccountFile: Form-1 CA.pdf-

How this compares with Kalaburagi

32%of Kalaburagi projects moved their completion datethis one has not
0%of Kalaburagi registrations are shown as withdrawn or revokedthis one is not

Computed across the 210+ Kalaburagi projects on ReraGenie, from their own filings.

Keep S.R. NAJMA TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kalaburagi210+ in Kalaburagi

2 kmS.R. NAJMA TOWEROther 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: S R Constructions

S R Constructions has 5 registrations on RERA Karnataka, including S R APARTMENTS and S.R. NAJMA TOWER. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Kalaburagi district page.

Frequently asked questions

What are my rights if S.R. NAJMA TOWER is delayed beyond 12 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of S.R. NAJMA TOWER?

The registered promoter entity is S R Constructions, a partnership firm as per the filing. Its GSTIN 29ACCFS2533C1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in S.R. NAJMA TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at S.R. NAJMA TOWER?

The professionals named in the filing: Architect: Siraj Ahmed; Engineer: Mohammed Irfan; Chartered Accountant: Amogh Srikant Dharwadkar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in S.R. NAJMA TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About S.R. NAJMA TOWER. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save S.R. NAJMA TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.