Home / Browse projects / Belagavi, Karnataka / VAISHNAVII RESIDENCY I
VAISHNAVII RESIDENCY I
By Veerbhadrappa Ghativalappa Kivadasannavar Prop. Vaishnavii Developers
RG-KA-23040 · RERA PRM/KA/RERA/1249/447/PR/260924/007076 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
VAISHNAVII RESIDENCY I is a Residential/Group Housing project by Veerbhadrappa Ghativalappa Kivadasannavar Prop. Vaishnavii Developers in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/260924/007076 on 26 Sep 2024. Possession is promised by 31 Mar 2027. 9 of the 16 units on this registration are recorded sold or booked, and 6 of 15 construction stages are filed complete.
At a glance
Project
- NameVAISHNAVII RESIDENCY I
- TypeResidential/Group Housing
- Location
- Belagavi
- 590010
- Pincode590010
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1249/447/PR/260924/007076
- ReraGenie IDRG-KA-23040
Builder
- NameVeerbhadrappa Ghativalappa Kivadasannavar Prop. Vaishnavii Developers
- Entity typeProprietorship
- GSTIN29ANWPK2808H2ZH
- Authorized SignatoryVEERBHADRAPPA GHATIVALAPPA KIVADASANNAVAR
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on26 Sep 2024
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed132 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VAISHNAVII RESIDENCY I | - | - | - | - | - | 16 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 15 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 95%.
Building: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 95% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 75% |
| Joinery: Doors, Windows, Ventilators etc | 75% |
| Basic work of Water supply, Sanitary and Electrification | 75% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 75% |
| Railing and Grill fixing | 75% |
| Electrification, Water supply and Sanitary Finishing | 75% |
| Painting | 75% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 75% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 70% |
| Sewage and Drainage System | Yes | 60% |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 50% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 85% |
| Lifts | Yes | 45% |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 90% |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VEERABHADRAPPA GHATIVALAPPA KIVADASANNAVAR | - | - |
| VAISHNAVI VEERABHADRAPPA KIVADASANNAVAR | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 3.37 cr | Rs 12.77 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAHUL PATIL |
| Engineer | SAGAR HUDDAR |
| Chartered Accountant | BHAKTI ADITYA BHIDE |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed132
As listed on the registration, under the names the promoter filed them with; the newest 80 of 132 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/260924/007076 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 .pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: VR-I RERA 4th Qtr 25-26_compressed.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 QU 3 25-26.pdf | 4 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: FORM 5 QU 3 25-26.pdf | 4 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 QU 3 25-26.pdf | 4 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 4 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 4 Feb 2026 |
| GST CERTIFICATE WHEREIN PROMOTER NAME MATCHEDFile: GST CERTIFICATE - NEW.pdf | 1 Jun 2024 |
| CLARIFICATION ABOUT UNDER GROUND WATER AUTHORITYFile: ABOUT GROUND WATER NOC-compressed.pdf | 1 Jun 2024 |
| IT ACK AND SELF ATTESTED SCHEDULE 2021-22File: self attested IT ack with schedule AY 2021-22.pdf | 7 May 2024 |
| IT ACK AND SELF ATTESTED SCHEDULE 2022-23File: self attested IT with scheduel, AY 2022-23.pdf | 7 May 2024 |
| IT ACK AND SELF ATTESTED SCHEDULE 2023-24File: self attested IT ack with schedule for assesment year 2023-24.pdf | 7 May 2024 |
| BALANCE SHEET AND ABOUT P & L WITH CA UDIN 2021-22File: Balance sheet and about P and L with CA UDIN 2021-22-6.pdf | 7 May 2024 |
| BALANCE SHEET AND ABOUT P & L WITH CA UDIN 2022-23File: Balance sheet and about P and L with CA UDIN 2022-23-4.pdf | 7 May 2024 |
| ABOUT GSTFile: GST -.pdf | 7 May 2024 |
| CONVERSION ORDER OF PROJECT LAND AREAFile: na order.pdf | 7 May 2024 |
| ABOUT CAR PARKING LOTSFile: about car parking.pdf | 7 May 2024 |
| ABOUT the Construction Cost Details properly from Sl. no. (2) to (13)File: about cost in column 2 to 13.pdf | 7 May 2024 |
| SELF ATTESTED HESCOM NOCFile: self attested hescom 03 (1).pdf | 7 May 2024 |
| SELF ATTESTED WATER NOCFile: self attested hescom 03 (1).pdf | 7 May 2024 |
| ABOUT LAND COST CALCULATIONFile: ABOUT COST OF LAND.pdf | 7 May 2024 |
| UNDERTAKING FOR WATER SUPPLYFile: Undertaking for water supply.pdf | 7 May 2024 |
| Balance sheet and about P & L 2021-22 with CA UDINFile: Balance sheet and about P and L with CA UDIN 2021-22-6.pdf | 19 Apr 2024 |
| Balance sheet and about P & L 2022-23 with CA UDINFile: Balance sheet and about P and L with CA UDIN 2022-23-4.pdf | 19 Apr 2024 |
| IT ack with self attested schedule for 2021-22File: self attested IT ack with schedule AY 2021-22.pdf | 19 Apr 2024 |
| IT ack with self attested schedule for 2022-23File: self attested IT with scheduel, AY 2022-23.pdf | 19 Apr 2024 |
| IT ack with self attested schedule for 2023-24File: self attested IT ack with schedule for assesment year 2023-24.pdf | 19 Apr 2024 |
| conversion Order (NA order)File: na order.pdf | 19 Apr 2024 |
| about car parking slotsFile: about car parking.pdf | 19 Apr 2024 |
| the Construction Cost Details properly from Sl. no. (2) to (13)File: about cost in column 2 to 13.pdf | 19 Apr 2024 |
| about cost of landFile: ABOUT COST OF LAND.pdf | 19 Apr 2024 |
| self attested Water NOC with details of DD receipt in NOCFile: self attested water noc 03.pdf | 19 Apr 2024 |
| self attested HESCOM NOC with details of receipt in NOCFile: self attested hescom 03 (1).pdf | 19 Apr 2024 |
| about water supplyFile: Undertaking for water supply.pdf | 19 Apr 2024 |
| source of fundFile: Source of Fund (1).pdf | 19 Apr 2024 |
| SOURCE OF FUNDFile: Source of Fund.pdf | 21 Mar 2024 |
| SUPPORTING DOCUMENT FOR SOURCE OF FUNDFile: IT with scheduel, Income and Expenditure, Balance sheet 2022-23.pdf | 21 Mar 2024 |
| GST CERTIFICATEFile: GST - VEINTURE INFRA.pdf | 21 Mar 2024 |
| PROPIETORSHIP CERTIFICATEFile: VENTURE Udyam Registration Certificate.pdf | 21 Mar 2024 |
| BUILDING PERMISSION WITH QR CODE WITH ALL ELEVATION, SECTIONAL DRAWING AND FLOOR PLANFile: Permission plan.pdf | 21 Mar 2024 |
| SELF ATTESTED HESCOM NOCFile: hescom 03.pdf | 21 Mar 2024 |
| SELF ATTESTED WATER NOCFile: water NOC.pdf | 21 Mar 2024 |
| SEWER LINE DRAWINGFile: sewar drawing plot 03.pdf | 21 Mar 2024 |
| UNDERTAKING FOR WATER SUPPLYFile: UNDERTAKING FOR WATER SUPPLY.pdf | 21 Mar 2024 |
| ABOUT CAR PARKING ALLOTMENTFile: about car parking.pdf | 21 Mar 2024 |
| ABOUT COST OF CONSTRUCTION DETAILS AT 2 TO 13File: about cost of construction in sr 2 to 13.pdf | 21 Mar 2024 |
| SELF ATTESTED ENGINEER LICENSE ISSUED BY PLANNING AUTHORITYFile: SELF ATTESTED LCIENCE UPTO DATE.pdf | 21 Mar 2024 |
| BANK LETTER FOR 100%, 70% AND 30% ACCOUNT DETAILSFile: Bank Letter.pdf | 15 Feb 2024 |
| ABOUT UNSECURED LOAN CLARIFICATION AS NOT MENTIONED IN CA CERTIFICATE AND SOURCE OF FUNDFile: about borrowing in CA certificate.pdf | 15 Feb 2024 |
| SOURCE OF FUNDFile: Source of Fund.pdf | 15 Feb 2024 |
| CERTIFIED CARPET AREAFile: carpet area calculations[2].pdf | 15 Feb 2024 |
| VILLAGE MAP (CTS MAP)File: Village map (CTS Map).pdf | 15 Feb 2024 |
| ABOUT ARCH COA CERTIFICATEFile: about COA of Arch.pdf | 15 Feb 2024 |
| SANCTION DRAWINGFile: Permission plan.pdf | 15 Feb 2024 |
| ABOUT CAR PARKING SLOTSFile: ABOUT CAR PARKING ALLOTMENT.pdf | 15 Feb 2024 |
| COMMON AREA AND AMENITIES CERTIFIED BY ENGINEERFile: common area calculation sheet.pdf | 15 Feb 2024 |
| SELF ATTESTED ENGINEER LICENSE APPROVED BY PLANNING AUTHORITYFile: Self attested Eng license.jpeg | 15 Feb 2024 |
| BRIEF ESTIMATION COST CERTIFIED BY ENGINEERFile: Certified breif estimation cost.pdf | 15 Feb 2024 |
| DRAFT OF AGREEMENT WITH PROJECT SPECIFICATIONFile: Draft of Agreement of sale (1).pdf | 15 Feb 2024 |
| CDP PLANFile: CDP.jpg | 15 Feb 2024 |
| Registration CertificateFile: VENTURE Udyam Registration Certificate.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA I.pdf | - |
| Certificate issued by Architect Form 2File: residency 2 plot 3 form 2.pdf | - |
| Certificate issued by Engineer Form 3File: residency 1 form no 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: no litigation affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA I.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep VAISHNAVII RESIDENCY I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
THE FORMIST RIDGE
FORMIST REALTY PRIVATE LIMITED
SUNSHINE AVENUE
Sunshine Developers Prop Raaz Mohammed Abd
HARSHA FORTUNE
HARSHA BUILDERS AND DEVELOPERS PRIVATE LIM
ABHIRAM EMERALD
P SQUARE INFRA
Galaxy B Apartment
BSS Infrastructure
GIRNAR ENCLAVE
SHREE BALAJEE CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: Veerbhadrappa Ghativalappa Kivadasannavar Prop. Vaishnavii Developers
Veerbhadrappa Ghativalappa Kivadasannavar Prop. Vaishnavii Developers has 1 registration on RERA Karnataka, including VAISHNAVII RESIDENCY I. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if VAISHNAVII RESIDENCY I is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of VAISHNAVII RESIDENCY I?
The registered promoter entity is Veerbhadrappa Ghativalappa Kivadasannavar Prop. Vaishnavii Developers, a proprietorship as per the filing. Its GSTIN 29ANWPK2808H2ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in VAISHNAVII RESIDENCY I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at VAISHNAVII RESIDENCY I?
The professionals named in the filing: Architect: RAHUL PATIL; Engineer: SAGAR HUDDAR; Chartered Accountant: BHAKTI ADITYA BHIDE. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VAISHNAVII RESIDENCY I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback