Home / Browse projects / Belagavi, Karnataka / THE FORMIST RIDGE
THE FORMIST RIDGE
By FORMIST REALTY PRIVATE LIMITED
RG-KA-54101 · RERA PRM/KA/RERA/1249/447/PR/291026/009049 · Last updated on RERA Karnataka portal: 19 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
THE FORMIST RIDGE is a Mixed Development project by FORMIST REALTY PRIVATE LIMITED in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/291026/009049 on 29 Oct 2026. Possession is promised by 31 Dec 2031.
At a glance
Project
- NameTHE FORMIST RIDGE
- TypeMixed Development
- Location
- Belagavi
- 590010
- Pincode590010
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1249/447/PR/291026/009049
- ReraGenie IDRG-KA-54101
Builder
- NameFORMIST REALTY PRIVATE LIMITED
- Entity typeCompany
- CINU45400KA2018PTC112945
- GSTIN29AADCF3939P1ZX
- Authorized SignatoryAMIT K KULKARNI
- Managing DirectorAMIT K KULKARNI
- DirectorsAMIT K KULKARNI, Marie Raghavan, Mohan Raghavan, Anirban Sen
- Project HeadSAMPATH KUMAR
- Other registrations2 more →
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on29 Oct 2026
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings1 building record
- Documents filed107 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| THE FORMIST RIDGE | - | - | - | - | - | 101 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 19 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 19 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | Yes | - |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MIS. BHARATESH STONE CRUSHING INDUSTRIES | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 62.90 cr | - |
| On-site expenditure-Salaries of workers | Rs 6.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.25 cr | - |
| Payment of taxes | Rs 36.81 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MILIND BELGAONKAR |
| Engineer | MUBASHAR MUNSHI |
| Chartered Accountant | SAMIR CHANDRAKANT ANAVEKAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed107
As listed on the registration, under the names the promoter filed them with; the newest 80 of 107 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/291026/009049 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILITY FORMIST RIDGE.pdf | 19 Oct 2026 |
| STRUCTURAL ENGINEER LICENCEFile: BBMP CERTIFICATE TSV NEW.pdf | 19 Oct 2026 |
| WATER NOC DECLARATION AFFIDAVITFile: water noc declaration notarized affidavit.pdf | 19 Oct 2026 |
| WATER NOCFile: WATER NOC.pdf | 19 Oct 2026 |
| BOREWELLFile: borewell1.jpeg | 19 Oct 2026 |
| BOREWELLFile: borewell2.jpeg | 19 Oct 2026 |
| LAND COST CALCULATION WITH GUIDANCE VALUEFile: Land Cost estimate_Ridge.pdf | 19 Oct 2026 |
| FORM-1 CA CERTIFICATE UPDATEDFile: FORM1 CA CERTIFICATE UPDATED.pdf | 19 Oct 2026 |
| FORM-1 CA CERTIFICATEFile: FORM-1 CA CERTIFICATE UPDATED.pdf | 6 Oct 2026 |
| SOURCE OF FUNDSFile: SOURCE OF FUND.pdf | 6 Oct 2026 |
| DIRECTOR MOHAN 3 YEARS ITRFile: DIRECTOR MOHAN 3 YEARS ITR.pdf | 6 Oct 2026 |
| DIRECTOR MARIE 3 YEARS ITRFile: DIRECTOR MARIE 3 YEARS ITR.pdf | 6 Oct 2026 |
| DIRECTOR ANIRBAN 3 YEARS ITRFile: DIRECTOR ANIRBAN 3 YEARS ITR.pdf | 6 Oct 2026 |
| DIRECTOR AMIT 3 YEARS ITRFile: DIRECTOR AMIT 3 YEARS ITR.pdf | 6 Oct 2026 |
| JDAFile: DEED OF CONFIRMATION JDA.pdf | 6 Oct 2026 |
| GPAFile: ADDENDUM TO GPA.pdf | 6 Oct 2026 |
| ADVOCATE SEARCH REPORTFile: advocate report.pdf | 6 Oct 2026 |
| STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILITY FORMIST RIDGE.pdf | 6 Oct 2026 |
| STRUCTURAL ENGINEER LICENCEFile: ENGINEER LICENCE.pdf | 6 Oct 2026 |
| AGREEMENT FOR SALE PROFORMA UPDATEDFile: AGREEMENT FOR SALE FORMIST UPDATED.pdf | 6 Oct 2026 |
| WATER NOC DECLARATION AFFIDAVITFile: Water supply declaration.pdf | 6 Oct 2026 |
| WATER NOCFile: WATER NOC.pdf | 6 Oct 2026 |
| BOREWELLFile: borewell1.jpeg | 6 Oct 2026 |
| BOREWELLFile: borewell2.jpeg | 6 Oct 2026 |
| LAND COST DECLARATIONFile: LAND CALCULATION WITH GV.pdf | 6 Oct 2026 |
| ALLOTMENT LETTERFile: ALLOTMENT LETTER UPDATED.pdf | 6 Oct 2026 |
| SOURCE OF FUND DECLARATIONFile: Declaration of Proof of funds.pdf | 6 Oct 2026 |
| PREVIOUS PROJECT DECLARATIONFile: PREVIOUS PROJEC DECLARATION.pdf | 11 Sep 2026 |
| FORM-1 CA CERTIFICATEFile: FORM-1 CA CERTIFICATE.pdf | 11 Sep 2026 |
| SOURCE OF FUNDSFile: FORMIST_Balance Sheet 2024-25.pdf | 11 Sep 2026 |
| MR ORIGINALFile: MR ORIGINAL.pdf | 11 Sep 2026 |
| MR TRANSLATEDFile: MR TRANSLATED.pdf | 11 Sep 2026 |
| GRANT ORDER FOR TITLEFile: GRANT TITLE DEED.pdf | 11 Sep 2026 |
| JDAFile: JDA.pdf | 11 Sep 2026 |
| EC UPTO DATEFile: EC UPTO DATE.pdf | 11 Sep 2026 |
| E-KHATHAFile: KHATHA.pdf | 11 Sep 2026 |
| JD CUM DECLARATION AFFIDAVITFile: JD AFFIDAVIT CUM DECLARATION.pdf | 11 Sep 2026 |
| ADVOCATE SEARCH REPORTFile: ADVOCATE SEARCH REPORT.PDF | 11 Sep 2026 |
| NON LITIGATION AFFIDAVITFile: NON LITIGATION AFFIDAVIT.pdf | 11 Sep 2026 |
| FORM-B AFFIDAVITFile: FORM-B AFFIDAVIT.pdf | 11 Sep 2026 |
| SINGLE LAYOUT PLAN AND ORDERFile: SIGNLE SITE ORDER AND PLAN.pdf | 11 Sep 2026 |
| BUILDING LICENCEFile: BUILDING LICENCE.pdf | 11 Sep 2026 |
| ADLR SURVEY SKETCHFile: ADLR SURVEY SKETCH.pdf | 11 Sep 2026 |
| ORIGINAL SANCTIONED DRAWINGFile: ORIGINAL SANCTIONED DRAWING.pdf | 11 Sep 2026 |
| ORIGINAL FLOOR PLANSFile: ORIGINAL FLOOR PLANS.pdf | 11 Sep 2026 |
| ORIGINAL SECTIONAL DRAWINGSFile: ORIGINAL SANCTIONED DRAWING.pdf | 11 Sep 2026 |
| CDP MAPFile: ORIGINAL CDP PLAN.jpeg | 11 Sep 2026 |
| CDP MAP DEMARKEDFile: CDP DEMARKED.png | 11 Sep 2026 |
| VILLAGE MAP DEMARKEDFile: VILLAGE MAP DEMARCATED.pdf | 11 Sep 2026 |
| KTCP NOC DECLARATIONFile: KTCP NOC DECLARATION.pdf | 11 Sep 2026 |
| PROJECT FACILITIESFile: AMENITIES.pdf | 11 Sep 2026 |
| BROCHUREFile: BROCHURE_compressed.pdf | 11 Sep 2026 |
| STRUCTURAL STABILITY CERTIFICATEFile: STABILITY CERTIFICATE.pdf | 11 Sep 2026 |
| AGREEMENT FOR SALE UPDATEDFile: ridge proforma sale agreement.pdf | 11 Sep 2026 |
| ALLOTMENT LETTER UPDATEDFile: ALLOTMENT LETTER UPDATED.pdf | 11 Sep 2026 |
| PROJECT ESTIMATIONFile: Project estimation signed by engineer - ridge.pdf | 11 Sep 2026 |
| STP DRAWINGFile: STP DRAWING.pdf | 11 Sep 2026 |
| LAND COST CALCULATIONFile: LAND CALCULATION WITH GV.pdf | 11 Sep 2026 |
| GUIDANCE VALUE CERTIFICATEFile: GUIDANCE VALUE CERTIFICATE.pdf | 11 Sep 2026 |
| SOURCE OF WATER DECLARATIONFile: Water supply declaration.pdf | 11 Sep 2026 |
| WATER NOCFile: WATER NOC.pdf | 11 Sep 2026 |
| AREA MISMATCH CLARIFICATIONFile: AREA CLARIFICATION.pdf | 11 Sep 2026 |
| Registration CertificateFile: Certificate of incorporation.pdf | - |
| Memorandum of AssociationFile: MOA FormistFinal.pdf | - |
| Article of AssociationFile: AOA Formist-Final.pdf | - |
| GST CertificateFile: Formist GST Certificate.pdf | - |
| Organization StructureFile: Organistation Structure.jpeg | - |
| Certificate issued by CA Form 1File: FORM-1 CA CERTIFICATE UPDATED.pdf | - |
| Certificate issued by Architect Form 2File: FORM 2 Architects Certiifcate.pdf | - |
| Certificate issued by Engineer Form 3File: Ridge Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: NON LITIGATION AFFIDAVIT.pdf | - |
| Balance Sheet 2024 - 2025File: FORMIST_Balance Sheet 2024-25.pdf | - |
| Balance Sheet 2023 - 2024File: BSFY 2324.pdf | - |
| Balance Sheet 2022 - 2023File: BSFY 2223.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: FORMIST_Profit and Loss 2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: PLFY 2324.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: PLFY 2223.pdf | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| THE FORMIST MANDALA | SY NO 1/2B, GUNDAPPA ROAD, KEMPAPURA VILLAGE, YELAHANKA HOBLI , BANGALORE NORTH, BANGALORE, KARNTAKA , Bengaluru North , Bengaluru Urban, Karnataka - 560024 | Ongoing | Mar 2030 | Not due yet |
| THE FORMIST TREEHOUSE | THE FORMIST TREEHOUSE, KHATA NO. 346/33, SY. NO. 33, SRI RAMAPURA VILLAGE YELHANKA HOBLI BANGALORE NORTH | Completed | - | No date filed |
| THE FORMIST COVE | SY NO 40/A1, CTS NO.5399A, KANGRALI B K, BELAGAVI | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep THE FORMIST RIDGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
SUNSHINE AVENUE
Sunshine Developers Prop Raaz Mohammed Abd
HARSHA FORTUNE
HARSHA BUILDERS AND DEVELOPERS PRIVATE LIM
ABHIRAM EMERALD
P SQUARE INFRA
Galaxy B Apartment
BSS Infrastructure
GIRNAR ENCLAVE
SHREE BALAJEE CONSTRUCTIONS
Salamat Residency
Lacasa Builders and Developers
See every Belagavi project, with the district possession charts
Builder: FORMIST REALTY PRIVATE LIMITED
FORMIST REALTY PRIVATE LIMITED has 3 registrations on RERA Karnataka, including THE FORMIST COVE and THE FORMIST RIDGE. Its filings declare 4 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if THE FORMIST RIDGE is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of THE FORMIST RIDGE?
The registered promoter entity is FORMIST REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U45400KA2018PTC112945 and GSTIN 29AADCF3939P1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in THE FORMIST RIDGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at THE FORMIST RIDGE?
The professionals named in the filing: Architect: MILIND BELGAONKAR; Engineer: MUBASHAR MUNSHI; Chartered Accountant: SAMIR CHANDRAKANT ANAVEKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE FORMIST RIDGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback