Home / Browse projects / Belagavi, Karnataka / UNITY HEIGHTS
UNITY HEIGHTS
By TARADE BROTHERS INFRASTRUCTURE PRIVATE LIMITED
RG-KA-44314 · RERA PRM/KA/RERA/1249/447/PR/170625/007833 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
UNITY HEIGHTS is a Residential/Group Housing project by TARADE BROTHERS INFRASTRUCTURE PRIVATE LIMITED in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/170625/007833 on 17 Jun 2025. Possession is promised by 23 Apr 2028. 13 of the 24 units on this registration are recorded sold or booked, and 5 of 15 construction stages are filed complete.
At a glance
Project
- NameUNITY HEIGHTS
- TypeResidential/Group Housing
- Location
- Belagavi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1249/447/PR/170625/007833
- ReraGenie IDRG-KA-44314
Builder
- NameTARADE BROTHERS INFRASTRUCTURE PRIVATE LIMITED
- Entity typeCompany
- CINU45400KA2020PTC136768
- GSTIN29AAHCT9951H1ZO
- Authorized SignatoryALAM HUSEN TARADE
- DirectorALAM HUSEN TARADE
- DirectorsALAM HUSEN TARADE, RAFIK APPASAB TARADE, APPASAB MAMULAL TARADE, MIRASAHEB MAMULAL TARADE, MOBINA MOHAMMED YUSUF MUDALGI, NOORJAHAN HUSEN TARADE
- Project HeadALAM HUSEN TARADE
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Jun 2025
- Promised completion23 Apr 2028
- Revised completionNone
- Buildings1 building record
- Documents filed107 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| UNITY HEIGHTS | - | - | - | 24 | 0 | 24 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 15 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 98%.
Building: 95% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 98% |
| Masonry Construction | 98% |
| Plastering inside , outside & Ceiling | 98% |
| Joinery: Doors, Windows, Ventilators etc | 85% |
| Basic work of Water supply, Sanitary and Electrification | 90% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 90% |
| Railing and Grill fixing | 90% |
| Electrification, Water supply and Sanitary Finishing | 90% |
| Painting | 90% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 90% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 98% |
| Sewage and Drainage System | Yes | 98% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 90% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 98% |
| Lifts | Yes | 70% |
| Corridor/Lobbies | Yes | 95% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 85% |
| Basement | Yes | 98% |
| Terrace | Yes | 98% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| TARADE BROTHERS INFRASTRUCTURES PVT LTD | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 4.40 cr | Rs 4.31 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KHALEEL AHMED JALIHAL |
| Engineer | VINAY BEHERE |
| Chartered Accountant | SHIVANAND VILAS HALBHAVI |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed107
As listed on the registration, under the names the promoter filed them with; the newest 80 of 107 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/170625/007833 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Certificate of Unity Heights Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Q2 FY 2026-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Q2 FY 2026-27.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Q1 FY 2026-27.pdf | 7 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Q1 FY 2026-2027.pdf | 7 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Structural Engg Q1 FY 2026-2027.pdf | 7 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Q4 RERA CA final.pdf | 20 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Q4 RERA Architect Final.pdf | 20 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Q4 RERA Str Engg Final.pdf | 20 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Q3 CA signed final.pdf | 17 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Q3 RERA Architect Final.pdf | 17 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Q3 RERA Str Engg Final.pdf | 17 Jan 2026 |
| CASH FLOW STATEMENT 2021-22 WITH CA UDINFile: CASH FLOW STATEMENT 2021-22 WITH CA UDIN.pdf | 27 May 2025 |
| CASH FLOW STATEMENT 2022-23 WITH CA UDINFile: CASH FLOW STATEMENT 2022-23 WITH CA UDIN.pdf | 27 May 2025 |
| CASH FLOW STATEMENT 2023-24 WITH CA UDINFile: CASH FLOW STATEMENT 2023-24 WITH CA UDIN.pdf | 27 May 2025 |
| project declaration page showing cash flow statements for last three years updateFile: project declaration page for update of cash flow statements of last three years.pdf | 27 May 2025 |
| CA certificate with CA UDIN in respect of cash flow statement for last 3 yearsFile: rera filetarade brother_20250505_0001(1).pdf | 7 May 2025 |
| Cash Flow statement for last 3 yearsFile: about cash flow statement.pdf | 13 Apr 2025 |
| About water and HESCOM NOCFile: about water n electricity NOC.pdf | 13 Apr 2025 |
| Cash flow statement, audit report and Directors report for 2021-22File: 21-22.pdf | 3 Apr 2025 |
| Cash flow statement, audit report and Directors report for 2022-23File: 22-23.pdf | 3 Apr 2025 |
| Cash flow statement, audit report and Directors report for 2023-24File: 23-24.pdf | 3 Apr 2025 |
| Source of fund with supporting documentsFile: source of fund with supporting documents.pdf | 3 Apr 2025 |
| about Approved Original Single Plot layout planFile: about Single plot layout order and plan.pdf | 3 Apr 2025 |
| Approved Original Single Plot layout work orderFile: about Single plot layout order and plan.pdf | 3 Apr 2025 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey | 3 Apr 2025 |
| about ADLR Certified survey sketch Certifying the Boundary of the Proposed land-mapFile: about ADLR survey sketch.pdf | 3 Apr 2025 |
| about commencement certificateFile: about commencment cetificate.pdf | 3 Apr 2025 |
| Demarcation of proposed land in original Village map certified by the concern authorityFile: ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey | 3 Apr 2025 |
| Form 6 at the time of registrationFile: Form 6 at the time of registration.pdf | 3 Apr 2025 |
| about water and HESCOM NOCFile: about water n electricity NOC.pdf | 3 Apr 2025 |
| ABOUT LOAN AMOUNT DISBURSEMENTFile: about loan amount.pdf | 25 Feb 2025 |
| SOURCE OF FUND WITH SUPPORTING DOCUMENTSFile: source of fund with supporting documents.pdf | 25 Feb 2025 |
| EC FROM 01-04-2004 TO 14-02-2025File: EC 2004 till 2025.pdf | 25 Feb 2025 |
| ABOUT SINGLE PLOT LAYOUT PLANFile: about Single plot layout order and plan.pdf | 25 Feb 2025 |
| ABOUT SINGLE PLOT LAYOUT WORK ORDERFile: about Single plot layout order and plan.pdf | 25 Feb 2025 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land BY CTS survey sketchFile: ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey | 25 Feb 2025 |
| APPROVED BUILDING PLAN-ORIGINAL WITH QR CODEFile: Approved Plan IMP.pdf | 25 Feb 2025 |
| all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: origianl Approved Plan IMP with all section, floor, elvations with QR code.pdf | 25 Feb 2025 |
| ABOUT WATER N ELECTRICITY NOCFile: about water n electricity NOC.pdf | 25 Feb 2025 |
| ABOUT APPROVAL/NOC UNDER SECTION 14 OF KTCP ACTFile: Approval-NOC Section 14.pdf | 25 Feb 2025 |
| Demarcation of proposed land in original Village map certified byFile: ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey | 25 Feb 2025 |
| BRIEF ESTIMATED COST OF CONSTRUCTION CERTIFIED BY THE REGISTERED CIVIL ENGINEERFile: estimation-ahad.pdf | 25 Feb 2025 |
| ABOUT CONSTRUCTION COST DETAILS AT SR 2 TO 13 IN PROJECT DETAIL PAGEFile: about cost of construction in sr 2 to 13.pdf | 25 Feb 2025 |
| SEWER LINE DRAWINGFile: Sewer Line Drawing certified by project archtiect.jpeg | 25 Feb 2025 |
| ABOUT FORM 6 OF ENGINEERFile: about Form 6 - Engineer certificate -clarification.pdf | 25 Feb 2025 |
| UNDERTAKING FOR SOURCE OF WATERFile: Undertaking for water supply.pdf | 25 Feb 2025 |
| FORM 2 OF ARCHITECTFile: Form 2.jpeg | 25 Feb 2025 |
| demarcation of project land on approved master planFile: 5 (1) - Copy.jpg | 25 Feb 2025 |
| master plan with project land demarcationFile: 5 (1).jpg | 25 Feb 2025 |
| RTC, survey 1496/2 | - |
| Mutation, survey 1496/2 | - |
| Encumbrance Certificate, survey 1496/2 | - |
| Conversion/Alienation Order, survey 1496/2 | - |
| Sale/Title/Gift Deed, survey 1496/2 | - |
| Khatha, survey 1496/2 | - |
| Registration CertificateFile: certificate of incorporations.pdf | - |
| Memorandum of AssociationFile: MOA.pdf | - |
| Article of AssociationFile: AOA_compressed.pdf | - |
| GST CertificateFile: GST CERT.pdf | - |
| Organization StructureFile: certificate of incorporations.pdf | - |
| Certificate issued by CA Form 1File: Form 1 RERA CA Signed.pdf | - |
| Certificate issued by Architect Form 2File: Form 2.jpeg | - |
| Certificate issued by Engineer Form 3File: Form 2.jpeg | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: no litigation affidavit Tarade.pdf | - |
| Balance Sheet 2023 - 2024File: Balance sheet 23-24 with CA UDIN.pdf | - |
| Balance Sheet 2022 - 2023File: Balance sheet 22-23 with CA UDIN.pdf | - |
| Balance Sheet 2021 - 2022File: Balance sheet 21-22 with CA UDIN.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Pn L 23-24 with CA UDIN.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: P n L 22-23 with CA UDIN.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: P n L 21-22 with CA UDIN.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: self attested IT Ack 2024-25 with schedue.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: self attested IT ACK 2023-24 with schedule.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: self attested IT ACK 2022-23 with schedule.pdf | - |
| Auditor's Report 2023 - 2024File: Annual audit 23-24 with CA UDIN.pdf | - |
| Auditor's Report 2022 - 2023File: Audit report 22-23 with CA UDIN.pdf | - |
| Auditor's Report 2021 - 2022File: audit report 21-22.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep UNITY HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: TARADE BROTHERS INFRASTRUCTURE PRIVATE LIMITED
TARADE BROTHERS INFRASTRUCTURE PRIVATE LIMITED has 1 registration on RERA Karnataka, including UNITY HEIGHTS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if UNITY HEIGHTS is delayed beyond 23 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of UNITY HEIGHTS?
The registered promoter entity is TARADE BROTHERS INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Its CIN U45400KA2020PTC136768 and GSTIN 29AAHCT9951H1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in UNITY HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at UNITY HEIGHTS?
The professionals named in the filing: Architect: KHALEEL AHMED JALIHAL; Engineer: VINAY BEHERE; Chartered Accountant: SHIVANAND VILAS HALBHAVI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in UNITY HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback