Home / Browse projects / Gandhinagar, Gujarat / Tulsi Bungalows
Tulsi Bungalows
RG-GJ-56904 · RERA PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA00262/EX1/161018 · Last updated on GujRERA portal: 13 Dec 2018
Source: official GujRERA filing
Red flags
- Completion date moved by 6 months
- 1 extension taken
Clear
- Separate project account declared
Saved.
Tulsi Bungalows is a Residential/Group Housing project by Krishna Developers in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA00262/EX1/161018 on 26 Sep 2017. Possession is promised by 31 Dec 2018. The completion date has moved by 6 months from the original filing. 0 of the 49 units on this registration are recorded sold or booked, and 42 of 42 construction stages are filed complete.
At a glance
Project
- NameTulsi Bungalows
- TypeResidential/Group Housing
- Location
- Tulsi Bungalows
- Nr.Sankalp Royal Bungalows
- New Vavol
- Vavol
- Gandhinagar
- 382028
- Pincode382028
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA00262/EX1/161018
- ReraGenie IDRG-GJ-56904
Builder
- NameKrishna Developers
- Entity typePARTNERSHIP FIRM
- Other registrations4 more →
- Past their filed date2
Key dates
Key facts
Registration and timeline
- StatusValid until 31 Dec 2018
- Registered on26 Sep 2017
- Promised completion31 Dec 2018
- Revised completionRevised to 31 Dec 2018 (originally 30 Jun 2018)
- Buildings7 building records
- Documents filed42 files
Current status
Figures as on 13 Dec 2018, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK A | - | - | - | - | - | 7 |
| BLOCK B | - | - | - | - | - | 14 |
| BLOCK C | - | - | - | - | - | 9 |
| BLOCK D | - | - | - | - | - | 4 |
| BLOCK E | - | - | - | - | - | 1 |
| BLOCK F | - | - | - | - | - | 7 |
| BLOCK G | - | - | - | - | - | 7 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building7
As on 13 Dec 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
42 of 42 construction stages are filed complete across 7 buildings.
BLOCK A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BLOCK B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BLOCK C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BLOCK D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BLOCK E100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BLOCK F100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
BLOCK G100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities19
As on 13 Dec 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 100% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | Yes | 100% |
| Landscaping and tree planting | Yes | 100% |
| Street lighting | Yes | 100% |
| Community buildings | No | Not applicable |
| Treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation, rain water harvesting | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | Yes | 100% |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | Yes | 100% |
| Letter box | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BLOCK A | NA | Rs 1.07 cr | Rs 1.06 cr |
| BLOCK B | NA | Rs 1.07 cr | Rs 1.06 cr |
| BLOCK C | NA | Rs 1.07 cr | Rs 1.06 cr |
| BLOCK D | NA | Rs 1.07 cr | Rs 1.06 cr |
| BLOCK E | NA | Rs 1.07 cr | Rs 1.06 cr |
| BLOCK F | NA | Rs 1.07 cr | Rs 1.06 cr |
| BLOCK G | NA | Rs 1.07 cr | Rs 1.06 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Devang .B. Vaghela |
| Engineer | Amee Associates |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Documents filed42
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA00262/EX1/161018 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect's certificate (Form 1) | 13 Dec 2018 |
| Engineer's certificate (Form 2) | 13 Dec 2018 |
| Site photograph, BLOCK A | 13 Dec 2018 |
| Site photograph, BLOCK B | 13 Dec 2018 |
| Site photograph, BLOCK C | 13 Dec 2018 |
| Site photograph, BLOCK D | 13 Dec 2018 |
| Site photograph, BLOCK E | 13 Dec 2018 |
| Site photograph, BLOCK F | 13 Dec 2018 |
| Site photograph, BLOCK G | 13 Dec 2018 |
| RERA registration certificate | 26 Sep 2017 |
| Proforma agreement for sale | - |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Commencement certificate | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Agreement | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Proforma allotment letter | - |
| Brochure | - |
| Project related document | - |
| Declaration in Form B | - |
| Project photograph | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Gandhinagar
Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.
Keep Tulsi Bungalows on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vavol1,600+ in Gandhinagar
Filed coordinates, straight-line distance. 109 registered projects within 2 km.
SWARNA AMRUT HEIGHTS
SANT BAGDANA INFRA PROJECTS
Golden Arcade
Akshar Engineering (Electronics)
SHREEJI SARVASVA
SHREEJI INFRA
Panchamrut 2
RAJ INFRA
Siddheshwari Sopan
DWARKESH INFRA
SAHAJANAND SHYAM
AKSHAR INFRASTRUCTURE
See every Gandhinagar project, with the district possession charts
Builder: Krishna Developers
Krishna Developers has 5 registrations on GujRERA, including Tulsi Bungalows and KRISHNA ORCHID. Read the full track record. See more projects on the Gandhinagar district page.
Frequently asked questions
What are my rights if Tulsi Bungalows is delayed beyond 31 Dec 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of Tulsi Bungalows?
The registered promoter entity is Krishna Developers, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in Tulsi Bungalows?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Tulsi Bungalows?
The professionals named in the filing: Architect: Devang .B. Vaghela; Engineer: Amee Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tulsi Bungalows?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback