Tranquillo Meadow is a Residential/Group Housing project by Shuubharambh Developer in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/210518/004153 on 18 May 2021. Possession is promised by 10 May 2024.
At a glance
Project
- NameTranquillo Meadow
- TypeResidential/Group Housing
- Location
- Belagavi
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1249/447/PR/210518/004153
- ReraGenie IDRG-KA-21009
Builder
- NameShuubharambh Developer
- Entity typePartnership Firm
- Authorized SignatoryDeepak Appasaheb Patil
- OthersSharmila Deepak Patil, Pradeep Patil, Praveen C Navalli
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 May 2021
- Promised completion10 May 2024
- Revised completionNone
- Buildings1 building record
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TRANQUILLO MEADOW PHASE I | - | - | - | 79 | 0 | 79 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 15 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | Yes | - |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shuubharambh Developer | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dnyaneshwar amrut Sayanekar |
| Engineer | Uday kalkundrikar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed68
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/210518/004153 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Renewal Plan with QR CodeFile: ORDER COPY.pdf | 15 Nov 2024 |
| Renewal Order copy with QR codeFile: ORDER COPY.pdf | 15 Nov 2024 |
| Engineer Certificate for Pending Work Completion ScheduleFile: ENGINEER_WORK pending.pdf | 15 Nov 2024 |
| FIRE NOCFile: Fire NOC.pdf | 5 May 2021 |
| POLLUTION NOCFile: Pollution NOC.pdf | 5 May 2021 |
| SALE DEED WITH TRANSLATION AND GIFT DEEDFile: Sale deed and its translation.pdf | 5 May 2021 |
| JOINT AFFIDAVIT CUM DECLARATIONFile: Joint affidavit cum Declaration.pdf | 5 May 2021 |
| DEVELOPMENT DETAILS WITH BREAK UPFile: DEVELOPMENT DETAILS.pdf | 5 May 2021 |
| KHATAFile: Khatha.JPG | 5 May 2021 |
| CONVERSION ORDERFile: NA order.pdf | 5 May 2021 |
| CTS EXTRACTFile: CTS EXTRACT-KHATA.pdf | 5 May 2021 |
| CertificateFile: Firm registration.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT_WORK DONE.PDF | - |
| Engineer Certificate for Work Completion Schedule till DateFile: ENGINEER_WORK DONE_compressed.pdf | - |
| CA Certificate for Funds UtilizationFile: CA CERTIFICATE_FUND UTILISED_compressed.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT _WORK PENDING.PDF | - |
| Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER_WORK PENDING_compressed.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA CERTIFICATE_FUND REQUIRED_compressed.pdf | - |
| AffidavitFile: AFFIDAVIT_EXTENSION_compressed.pdf | - |
| Latest Encumbrance CertificateFile: Encumbrance certificate.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| ORDER COPY | - |
| PERMISSION | - |
| NA Layout | - |
| Not yet done | - |
| Not yet done | - |
| Addendum Deed | - |
| PERMISSION | - |
| PERMISSION | - |
| Not yet done | - |
| Not yet done | - |
| Specification | - |
| Encumbrance certificate 1 | - |
| Affidavit under 3 (1) | - |
| Affidavit under 3 (1) | - |
| Khata | - |
| Addendum Deed | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Hescom NOC | - |
| Water supply NOC | - |
| STP01-converted | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Buda | - |
| PERMISSION | - |
| NA order | - |
| Unnamed document | - |
| Declaration From B | - |
| Prospectus/BrochureFile: No Broucher.pdf | - |
| Advertisement Copy 1File: No ad.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1249_447_PR_210518_004153 (2).xlsx | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep Tranquillo Meadow on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Filed coordinates, straight-line distance. 49 registered projects within 2 km.
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: Shuubharambh Developer
Shuubharambh Developer has 1 registration on RERA Karnataka, including Tranquillo Meadow. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if Tranquillo Meadow is delayed beyond 10 May 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Tranquillo Meadow?
The registered promoter entity is Shuubharambh Developer, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Tranquillo Meadow?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Tranquillo Meadow?
The professionals named in the filing: Architect: Dnyaneshwar amrut Sayanekar; Engineer: Uday kalkundrikar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tranquillo Meadow?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback