ReraGenieLog inGet a buyer report

Home / Browse projects / Belagavi, Karnataka / THE SEVEN

Registration approved Residential/Group Housing project

THE SEVEN

By SEVEN CONSTRUCTIONS

RG-KA-86412 · RERA PRM/KA/RERA/1249/447/PR/170915/000141

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Feb 2018Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 42 documents Report an error

THE SEVEN is a Residential/Group Housing project by SEVEN CONSTRUCTIONS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/170915/000141 on 15 Sep 2017. Possession is promised by 28 Feb 2018.

At a glance

Project

  • NameTHE SEVEN
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1249/447/PR/170915/000141
  • ReraGenie IDRG-KA-86412

Builder

  • NameSEVEN CONSTRUCTIONS
  • Entity typePartnership Firm
  • Authorized SignatoryFAIZAN FEROZ SAIT
  • OthersFAIZAN FEROZ SAIT, IMTIYAZ MANIYAR, QAIS BHAVNAGARI

Key dates

this monthRegisteredSep 2017PromisedFeb 2018

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Sep 2017
  • Promised completion28 Feb 2018
  • Revised completionNone
  • Buildings1 building record
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE SEVEN---94094

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,048 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 21.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBAKUL JOSHI ARCHITECTS INTERIOR DESIGNERS
EngineerDILEEP KULKARNI

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/170915/000141 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: certificate of regist.pdf-
Commencement certificate (1)-
SANCTION PLAN-
Single Layout plan and Sanction letter-
Draft Sale Deed RERA-
Draft Agreement rera-
Land documents-
SANCTION PLAN-
BROCHURE-
All NOC copy-
Project Specifications-
encumbrance certificate below-
RTC pdf-
Mutation pdf-
NA order-
Fire_NOC_pdf-
Hescom NOC pdf-
Water NOC pdf-
KSPCB NOC-
Unnamed document-
NA order-
Structure Stability Certificate-
Cross Section Pdf-
Legal Doc pdf-
Balance Sheet 2015 - 2016File: Seven Constraction (BS).PDF-
Balance Sheet 2014 - 2015File: Balance Sheet 2015-16.pdf-
Balance Sheet 2013 - 2014File: Balance Sheet 2014 - 15.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Seven Constraction (PL).PDF-
Audited Profit and Loss Statement 2014 - 2015File: Profit & Loss 2015 - 16.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Profit & Loss 2014 - 15.pdf-
Auditor's Report 2015 - 2016File: Form 3CD- Audit report.pdf-
Auditor's Report 2014 - 2015File: Audit Report 2016 -17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR- FY -16-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT Return 2016 - 17.pdf-
Affidavit Cum Declaration - Form B-
Prospectus/BrochureFile: Broucher final.pdf-
Advertisement Copy 1File: All in One.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1249_447_PR_170915_000141.xlsx-
Occupancy CertificateFile: Complition Certificate.jpg-
Completion certificateFile: Complition Certificate.jpg-
Registered Agreement of SaleFile: ATS NEW.pdf-
Registered conveyance deed for an individual unitFile: SALEDEED NEW.pdf-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep THE SEVEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

2 kmTHE SEVENOther 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: SEVEN CONSTRUCTIONS

SEVEN CONSTRUCTIONS has 1 registration on RERA Karnataka, including THE SEVEN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if THE SEVEN is delayed beyond 28 Feb 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of THE SEVEN?

The registered promoter entity is SEVEN CONSTRUCTIONS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in THE SEVEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at THE SEVEN?

The professionals named in the filing: Architect: BAKUL JOSHI ARCHITECTS INTERIOR DESIGNERS; Engineer: DILEEP KULKARNI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE SEVEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE SEVEN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE SEVEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.