Home / Browse projects / Belagavi, Karnataka / Salamat Residency

Registration approved No litigation declared Residential/Group Housing project

Salamat Residency

By Lacasa Builders and Developers

RG-KA-90224 · RERA PRM/KA/RERA/1249/447/PR/300522/004934 · Last updated on RERA Karnataka portal: 3 Jan 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2023Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 81 documents Report an error

Salamat Residency is a Residential/Group Housing project by Lacasa Builders and Developers in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/300522/004934 on 30 May 2022. Possession is promised by 30 Jun 2023.

At a glance

Project

  • NameSalamat Residency
  • TypeResidential/Group Housing
  • Location
    • Belagavi
    • 590010
  • Pincode590010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1249/447/PR/300522/004934
  • ReraGenie IDRG-KA-90224

Builder

  • NameLacasa Builders and Developers
  • Entity typePartnership Firm
  • GSTIN29AAIFL5142Q1ZN
  • Authorized SignatoryParvezahmed K Garag

Key dates

this monthRegisteredMay 2022PromisedJun 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 May 2022
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SALAMAT RESIDENCY---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 3 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 3 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area371 sq m
Named landowners1
LandownerVillageDistrict
SALMA BEGAUM SHOUKAT ATTAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.08 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.08 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARBASSAHEMD GARG
EngineerArbassahemad Garg
Chartered AccountantR N Sampagaon

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed81

As listed on the registration, under the names the promoter filed them with; the newest 80 of 81 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/300522/004934 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Bank account confirmation letter from the bank in letter head of the concerned bankFile: Bank Letter.jpeg3 Jan 2022
approved building plan issued by planning authorityFile: DWG 1_Layout_Layout2_BGM_LBPAS_13598_19_20_BP.pdf3 Jan 2022
proforma of agreement of saleFile: Format of Agreement of sale Residential-converted.pdf3 Jan 2022
Proforma of sale deedFile: Format of Sale Deed.pdf3 Jan 2022
NOC issued by Water supply authorityFile: Water NOC.pdf3 Jan 2022
the section 3(1) notarized affidavit as per the prescribed formatFile: Affidavit S 3 (1) as per prescirbed format.pdf3 Jan 2022
Bank letter for the bank account as per the directionFile: Bank Letter for Designated Bank Account.jpeg20 Dec 2021
audited balance sheet for 2020-21File: UDIN Balance Sheet 2020-21.jpeg20 Dec 2021
audited P and L for 2020-21File: UDIN P and L 2020-21.jpeg20 Dec 2021
self attested PAN of firmFile: Self attested PAN of Firm.jpeg20 Dec 2021
complete JDAFile: JDA (1)_compressed.pdf20 Dec 2021
Joint affidavit cum declaration notiarizedFile: Joint affidavit cum declaration Lacasa.pdf20 Dec 2021
certified copy of land cost by Sub Registrar BelgaumFile: Certified copy of the land cost from Sub Registrar Belgaum.jpeg20 Dec 2021
non litigation affidavitFile: NON LITIGATION AFFIDAVIT.pdf20 Dec 2021
approved building permissionFile: SALAMATH PERMISSION PLAN (1).pdf20 Dec 2021
layout plan approved by competeny authorityFile: Layout plan approved by competent authority.jpeg20 Dec 2021
Sale Agreement formatFile: Sale Agreement For RERA.pdf20 Dec 2021
allotment letter formatFile: PROFORMA OF ALLOTMENT LETTER.jpeg20 Dec 2021
notarized Form BFile: Lacasa Form B notarized.pdf20 Dec 2021
notarized affidavit Sec 3File: Lacasa notarized affidavit sec 3.pdf20 Dec 2021
self attested project specificationFile: PROJECT SPECIFICATION.pdf20 Dec 2021
water NOC applicationFile: Water NOC Application.jpeg20 Dec 2021
provision of septic tank and built up area as per approved planFile: About septic tank and built up area.pdf20 Dec 2021
Registration CertificateFile: Firm Certificate.jpeg-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: CA certificate_compressed.pdf-
Certificate issued by Architect Form 2File: Arch certificate.pdf-
Certificate issued by Engineer Form 3File: Eng Certificate Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NON LITIGATION AFFIDAVIT.pdf-
Certificate from Chartered AccountFile: CA certificate_compressed.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P & L.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: IT ACKNOWLEDGEMENT.pdf-
building permission-
HESCOM NOC-
DWG 1_Layout_Layout1 (1)-
DWG 1_Layout_Layout1 (1)-
DWG 1_Layout_Layout1 (1)-
DWG 1_Layout_Layout1-
DWG 1_Layout_Layout1-
Self attested Project Specification-
DWG 1_Layout_Layout1 (1)-
DWG 1_Layout_Layout1 (1)-
Unnamed document-
Unnamed document-
Unnamed document-
development agreement (1)-
Unnamed document-
Unnamed document-
Unnamed document-
Not yet done-
Not yet done-
Not yet done-
Not yet done-
Form B (1)_compressed-
affidavit (1)-
JOINT AFFIDAVIT CUM DELCARATION-
HESCOM NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Fire NOC-
Unnamed document-
Pollution NOC (1)-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep Salamat Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

2 kmSalamat ResidencyOther 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: Lacasa Builders and Developers

Lacasa Builders and Developers has 1 registration on RERA Karnataka, including Salamat Residency. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if Salamat Residency is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Salamat Residency?

The registered promoter entity is Lacasa Builders and Developers, a partnership firm as per the filing. Its GSTIN 29AAIFL5142Q1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Salamat Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Salamat Residency?

The professionals named in the filing: Architect: ARBASSAHEMD GARG; Engineer: Arbassahemad Garg; Chartered Accountant: R N Sampagaon. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Salamat Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Salamat Residency. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Salamat Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.