Home / Browse projects / Belagavi, Karnataka / TAIF RESIDENCY

Registration approved No litigation declared Mixed Development project

TAIF RESIDENCY

By IMPERIAL BUILDERS

RG-KA-98298 · RERA PRM/KA/RERA/1249/447/PR/230125/007426 · Last updated on RERA Karnataka portal: 24 Jul 2024

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 121 documents Report an error

TAIF RESIDENCY is a Mixed Development project by IMPERIAL BUILDERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/230125/007426 on 23 Jan 2025. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameTAIF RESIDENCY
  • TypeMixed Development
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/230125/007426
  • ReraGenie IDRG-KA-98298

Builder

  • NameIMPERIAL BUILDERS
  • Entity typePartnership Firm
  • GSTIN29AAHFI5099N1ZH
  • Authorized SignatorySANJAYMARUTI CHOTE

Key dates

this monthRegisteredJan 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Jan 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed121 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TAIF RESIDENCY-----59

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 24 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
IMPERIAL BUILDERS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 5.34 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 5.00 cr-
On-site expenditure-Consultants FeesRs 15.00 lakh-
INTEREST ON BORROWINGSRs 13.98 lakh-
ADMINISTRATIVE COSTRs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKAZI ASSOCIATES
EngineerSAGAR HUDDAR
Chartered AccountantSANKANNAVAR MOOLYA & CO

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed121

As listed on the registration, under the names the promoter filed them with; the newest 80 of 121 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/230125/007426 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CDP PLAN WITH DEMARCATION OF PROJECT LANDFile: CDP.jpg24 Jul 2024
ENTIRE CDP MAPFile: Nehru Nagar+ city Level.jpg24 Jul 2024
ABOUT COA CERITIFICATEFile: about COA of Arch.pdf24 Jul 2024
ABOUT BUILT UP AREA IN KSPCB NOCFile: ABOUT KSPCB NOT BUILT UP AREA.pdf24 Jul 2024
about unsecured loanFile: ABOUT UNSECURED LOAN.pdf20 Jun 2024
source of fund with supporting documentsFile: Source of Fund with supporting documents.pdf20 Jun 2024
Form B Declaration signed all pages including last pageFile: Form B Declaration.pdf20 Jun 2024
about COAFile: about COA of Arch.pdf20 Jun 2024
about pollution NOCFile: ABOUT NUMBER OF UNITS AS PER POLLUTION NOC.pdf20 Jun 2024
about single plot layout orderFile: About Single Plot layout and its order (1).pdf20 Jun 2024
about single plot layout planFile: About Single Plot layout and its order (1).pdf20 Jun 2024
CDP map showing project landFile: CDP.jpg20 Jun 2024
VIllage Map (CTS Map)File: CTS map- VIllage Map.pdf20 Jun 2024
ABOUT DISCLOSURE OF UNSECURED LOANFile: ABOUT UNSECURED LOAN.pdf24 May 2024
SOURCE OF FUND WITH SUPPORTING DOCUMENTSFile: Source of Fund with supporting documents.pdf24 May 2024
LATEST KHATA EXTRACTFile: Latest Khata.pdf24 May 2024
ADVOCATE SEARCH REPORTFile: Legal Opinion (1).pdf24 May 2024
SIGNATURE ON ALL PAGES OF FORM BFile: SIGNED ALL PAGES ON FORM B.pdf24 May 2024
ABOUT COA CERTIFICATEFile: about COA of Arch.pdf24 May 2024
ABOUT SINGLE PLOT LAYOUT AND ITS ORDERFile: About Single Plot layout and its order (1).pdf24 May 2024
CERTIFIED CARPET AREA CALCULATIONSFile: certified carpet area.jpeg24 May 2024
CDP MAP SHOWING PROPOSED SITEFile: CDP.jpg24 May 2024
VILLAGE MAP (CTS MAP)File: CTS map- VIllage Map.pdf24 May 2024
NUMBER OF UNITS AS PER KSPCB NOC AND SANCTIONED PLANFile: ABOUT NUMBER OF UNITS AS PER POLLUTION NOC.pdf24 May 2024
ABOUT CAR PARKING SLOTSFile: about car parking.pdf24 May 2024
the Amenities and Common area details calculation sheet certified by the EngineerFile: certified common area and amenities.jpeg24 May 2024
latest dated self-attested copy of the complete Engineer license certificateFile: licence scan copy.pdf24 May 2024
FORM 6 OF ENGINEERFile: Form-6 Enginner.pdf24 May 2024
SELF ATTESTED HESCOM NOC WITH REFERENCE OF ACK OF PAYMENT RECEIPT IN NOCFile: Self attested HESCOM NOC.pdf24 May 2024
SELF ATTESTED WATER NOC WITH REFERENCE OF ACK OF PAYMENT RECEIPT IN NOCFile: Self attested Water NOC.pdf24 May 2024
STP DRAWING CERTIFIED BY ENGINEERFile: STP DRAWING OF IMPERIAL BUILDERS 20 KLD STP PLAN CERTIFIED BY ENGINEER.pdf24 May 2024
Partnership DeedFile: partnership deed.pdf30 Apr 2024
about cost of landFile: ABOUT COST OF LAND.pdf30 Apr 2024
about FARFile: about FAR.pdf30 Apr 2024
about height of buildingFile: ABOUT HEIGHT OF BUILDING.pdf30 Apr 2024
about single plot layout order and planFile: about single plot layout order and plan.pdf30 Apr 2024
about unsecured loanFile: about unsecured loan.pdf30 Apr 2024
Agreement of Sale ProformaFile: Agreement of Sale Proforma (1).pdf30 Apr 2024
approve planFile: aproved plan.pdf30 Apr 2024
CTS extractFile: CTS extract (2).pdf30 Apr 2024
VIllage Map (CTS map)File: CTS Map.pdf30 Apr 2024
EC from 01042004 to 01042004File: EC from 01042004 to 01042024.pdf30 Apr 2024
Notarized Form BFile: form B.pdf30 Apr 2024
HESCOM NOCFile: HESCOM NOC.PDF30 Apr 2024
undertaking for water supplyFile: Undertaking for water supply.pdf30 Apr 2024
Water NOCFile: Water NOC.pdf30 Apr 2024
Project specification with project name and addressFile: Project Specification.pdf30 Apr 2024
self attested copy of Engineer LicenseFile: LIC.pdf30 Apr 2024
Partnership DeedFile: partnership deed.pdf11 Apr 2024
source of fundFile: Source of Fund.pdf11 Apr 2024
about unsecured loanFile: about unsecured loan.pdf11 Apr 2024
EC from 01042004 to 01042024File: EC from 01042004 to 01042024.pdf11 Apr 2024
Notarized Form BFile: form B.pdf11 Apr 2024
CTS extractFile: CTS extract (2).pdf11 Apr 2024
Sanctioned Plan with QR CodeFile: aproved plan.pdf11 Apr 2024
about FARFile: about FAR.pdf11 Apr 2024
about Height of BuildingFile: ABOUT HEIGHT OF BUILDING.pdf11 Apr 2024
Village Map (CTS Map)File: CTS Map.pdf11 Apr 2024
Proforma of Agreement of saleFile: Agreement of Sale Proforma (1).pdf11 Apr 2024
self attested Engineer LicenseFile: Self attested Eng license.jpeg11 Apr 2024
about Land costFile: ABOUT COST OF LAND.pdf11 Apr 2024
about water supply undertakingFile: Undertaking for water supply.pdf11 Apr 2024
original HESCOM NOCFile: HESCOM NOC.PDF11 Apr 2024
original water NOCFile: Water NOC.pdf11 Apr 2024
about single plot layout order and planFile: about single plot layout order and plan.pdf11 Apr 2024
Registration CertificateFile: firm certificate.pdf-
Partnership DeedFile: partnership deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Imperial (1).pdf-
Certificate issued by Architect Form 2File: Form 2 Imperial.pdf-
Certificate issued by Engineer Form 3File: Form 3 Imperial.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: no litigation affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 CA Imperial (1).pdf-
Balance Sheet 2022 - 2023File: IT ACK 2022-23 WITH SELF ATTESTED SCHEDULE AND BALANCE SHEET AND P & L.pdf-
Balance Sheet 2021 - 2022File: IT ACK 2021-22 WITH SELF ATTESTED SCHEDUEL AND BALANCE SHEET AND P AND L.pdf-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep TAIF RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: IMPERIAL BUILDERS

IMPERIAL BUILDERS has 1 registration on RERA Karnataka, including TAIF RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if TAIF RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of TAIF RESIDENCY?

The registered promoter entity is IMPERIAL BUILDERS, a partnership firm as per the filing. Its GSTIN 29AAHFI5099N1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in TAIF RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at TAIF RESIDENCY?

The professionals named in the filing: Architect: KAZI ASSOCIATES; Engineer: SAGAR HUDDAR; Chartered Accountant: SANKANNAVAR MOOLYA & CO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TAIF RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TAIF RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TAIF RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.