Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Nothing adverse is on this record. The buyer report still lays out every unit and the land chain as filed and places this filing against the promoter's other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved.
SWARNA GRIHA VISTARA is a Mixed Development project by FELICITY ADOBE LLP in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/111126/009096 on 11 Nov 2026. Possession is promised by 30 Sep 2030.
At a glance
Project
- NameSWARNA GRIHA VISTARA
- TypeMixed Development
- Location
- Dharwad
- 580011
- Pincode580011
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1259/410/PR/111126/009096
- ReraGenie IDRG-KA-22927
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on11 Nov 2026
- Promised completion30 Sep 2030
- Revised completionNone
- Buildings5 building records
- Documents filed110 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER A | - | - | - | 178 | 0 | 178 |
| TOWER B | - | - | - | 166 | 0 | 166 |
| TOWER C | - | - | - | 152 | 0 | 152 |
| Tower D | - | - | - | 178 | 0 | 178 |
| Commercial Complex | - | - | - | 0 | 3 | 3 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 2 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 2 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| FELICITY ADOBE LLP | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 99.92 cr | - |
| Land Cost as per CA Certificate | Rs 16.71 cr | - |
| Various Approvals & NOCs | Rs 27.50 lakh | - |
| Others | Rs 19.17 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pramod Shiggavi |
| Engineer | Sandeep Nagendra |
| Chartered Accountant | Poonacha SS |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed110
As listed on the registration, under the names the promoter filed them with; the newest 80 of 110 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/111126/009096 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approved by the concern planning authority (original Copy)File: Building plan approved by the concern planning authority (original Copy).pdf | 2 Nov 2026 |
| Club House PlanFile: Club House Plan.pdf | 2 Nov 2026 |
| Commercial 2nd & Terrace Plan, Elevation & Section 1File: Commercial 2nd & Terrace Plan, Elevation & Section 1.pdf | 2 Nov 2026 |
| Commercial 2nd & Terrace Plan, Elevation & SectionFile: Commercial 2nd & Terrace Plan, Elevation & Section.pdf | 2 Nov 2026 |
| Commercial Ground & 1st Floor PlanFile: Commercial Ground & 1st Floor Plan.pdf | 2 Nov 2026 |
| Residential - 13th Floor & Terrace PlanFile: Residential - 13th Floor & Terrace Plan.pdf | 2 Nov 2026 |
| Residential - Basement & Stilt PlanFile: Residential - Basement & Stilt Plan.pdf | 2 Nov 2026 |
| Residential - Elevation & Section PlanFile: Residential - Elevation & Section Plan.pdf | 2 Nov 2026 |
| Residential - Typical Floor & 12th Floor PlanFile: Residential - Typical Floor & 12th Floor Plan.pdf | 2 Nov 2026 |
| Site PlanFile: Site Plan.pdf | 2 Nov 2026 |
| Status of the project- NEW PROJECT & WORK NOT YET STARTEDFile: STATUS OF THE PROJECT.pdf | 2 Nov 2026 |
| Details of facilities provided thereof including firefighting facilities, drinking water facilitiesFile: Details of facilities provided thereof including firefighting facilities, drinking water f | 2 Nov 2026 |
| Borewell Water NOC LetterFile: Borewell Water NOC Letter.pdf | 2 Nov 2026 |
| Application / request letter towards water supply NOC to the AuthorityFile: Application - request letter towards water supply NOC to the Authority.pdf | 2 Nov 2026 |
| Affidavit towards Water Supply NOCFile: Affidavit towards Water Supply NOC.pdf | 2 Nov 2026 |
| Breif project estimation with engineer signatureFile: project estimation with engineer signature.pdf | 2 Nov 2026 |
| Affidavit towards SEIAA NOCFile: Affidavit towards SEIAA NOC.pdf | 2 Nov 2026 |
| the clear exclusive STP drawing with engineer signature - COMMERCIAL STPFile: the clear exclusive STP drawing with engineer signature - COMMERCIAL STP.pdf | 2 Nov 2026 |
| the clear exclusive STP drawing with engineer signature - RESIDENTIAL STPFile: the clear exclusive STP drawing with engineer signature - RESIDENTIAL STP.pdf | 2 Nov 2026 |
| Declaration towards NOC of KTCPFile: Declaration towards NOC of KTCP.pdf | 2 Nov 2026 |
| SWARNA GRIHA VISTARA AREAS WITH BALCONYFile: SWARNA GRIHA VISTARA AREAS WITH BALCONY.xlsx | 2 Nov 2026 |
| ADLR SKETCHFile: ADLR SKETCH 02-05-2026.pdf | 22 Oct 2026 |
| Borewell Water NOC LetterFile: Borewell Water NOC Letter.pdf | 22 Oct 2026 |
| BrochureFile: Brochure.pdf | 22 Oct 2026 |
| Building License OriginalFile: Building License Original.pdf | 22 Oct 2026 |
| CFE (1)File: CFE (1).pdf | 22 Oct 2026 |
| COMMENCEMENT CERTIFICATE FROM PDOFile: COMMENCEMENT CERTIFICATE FROM PDO.pdf | 22 Oct 2026 |
| Conversion OrderFile: Conversion Order.pdf | 22 Oct 2026 |
| Declaration Status of the projectFile: Declaration Status of the project.pdf | 22 Oct 2026 |
| Demarcation of proposed land in Approved Master planFile: Demarcation of proposed land in Approved Master plan.pdf | 22 Oct 2026 |
| Demarcation of proposed land in original Village map certifiedFile: Demarcation of proposed land in original Village map certified.pdf | 22 Oct 2026 |
| ECC-17092026-5444794File: ECC-17092026-5444794.pdf | 22 Oct 2026 |
| FACILITIESFile: FACILITIES.pdf | 22 Oct 2026 |
| Fire NOCFile: Fire NOC.pdf | 22 Oct 2026 |
| Form - 3_RERAFile: Engineer Certificate.pdf | 22 Oct 2026 |
| KTCP DeclarationFile: KTCP Declaration.pdf | 22 Oct 2026 |
| MR209-1File: MR 209-1.pdf | 22 Oct 2026 |
| MR209-2File: MR 209-2.pdf | 22 Oct 2026 |
| Pollution NOCFile: Pollution NOC.pdf | 22 Oct 2026 |
| SEIAA PROPOSAL NUMBERFile: SEIAA NOC.pdf | 22 Oct 2026 |
| Single Layout Approval Letter OriginalFile: Single Layout Approval Letter Original.pdf | 22 Oct 2026 |
| Single Layout Plan Dharward OriginalFile: Single Layout Plan Dharward Original.pdf | 22 Oct 2026 |
| Stability Certificate Swarna Griha Vistara 19 Oct 26File: Stability Certificate Swarna Griha Vistara 19 Oct 26.pdf | 22 Oct 2026 |
| STP drawing with full project name and address along with engineer signatureFile: STP drawing with full project name and address along with engineer signature.pdf | 22 Oct 2026 |
| Parking DetailsFile: Parking Details.pdf | 22 Oct 2026 |
| LAND CALCULATION CUM DECLARATIONFile: LAND CALCULATION CUM DECLARATION.pdf | 22 Oct 2026 |
| COVERED AREA + BUILTUP AREA + CARPET AREAFile: COVERED AREA + BUILTUP AREA + CARPET AREA.jpeg | 22 Oct 2026 |
| Club House PlanFile: Club House Plan.pdf | 22 Oct 2026 |
| Commercial 2nd & Terrace Plan, Elevation & Section 1File: Commercial 2nd & Terrace Plan, Elevation & Section 1.pdf | 22 Oct 2026 |
| Commercial 2nd & Terrace Plan, Elevation & SectionFile: Commercial 2nd & Terrace Plan, Elevation & Section.pdf | 22 Oct 2026 |
| Commercial Ground & 1st Floor PlanFile: Commercial Ground & 1st Floor Plan.pdf | 22 Oct 2026 |
| FACILITIESFile: FACILITIES.pdf | 22 Oct 2026 |
| Project SpecificationFile: Project Specification.pdf | 22 Oct 2026 |
| Residential - 13th Floor & Terrace PlanFile: Residential - 13th Floor & Terrace Plan.pdf | 22 Oct 2026 |
| Residential - Basement & Stilt PlanFile: Residential - Basement & Stilt Plan.pdf | 22 Oct 2026 |
| Residential - Elevation & Section PlanFile: Residential - Elevation & Section Plan.pdf | 22 Oct 2026 |
| Residential - Typical Floor & 12th Floor PlanFile: Residential - Typical Floor & 12th Floor Plan.pdf | 22 Oct 2026 |
| Site PlanFile: Site Plan.pdf | 22 Oct 2026 |
| RTCFile: RTC - 2025-26.pdf | 22 Oct 2026 |
| RTC, survey 209 | - |
| Mutation, survey 209 | - |
| Encumbrance Certificate, survey 209 | - |
| Conversion/Alienation Order, survey 209 | - |
| Sale/Title/Gift Deed, survey 209 | - |
| Khatha, survey 209 | - |
| Registration CertificateFile: LLP Agreement (2)_compressed.pdf | - |
| GST CertificateFile: GST CERTIFICATE.pdf | - |
| Partnership DeedFile: LLP Agreement (2)_compressed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: CA Certificate Form 1.pdf | - |
| Certificate issued by Architect Form 2File: Architect Certificate Form 2_compressed.pdf | - |
| Certificate issued by Engineer Form 3File: Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: NON-LITIGATION AFFIDAVIT (1).pdf | - |
| Balance Sheet 2024 - 2025File: Financial -FY 2024-2025_compressed.pdf | - |
| Balance Sheet 2023 - 2024File: Felicity Audit Report with Financial FY 2023-2024_compressed.pdf | - |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SWARNA GRIHA 3 ANNEXE | SY NO. 21/1, 21/2, ARABIKOTHANOOR VILLAGE , VAKKALERI HOBLI , Kolar , Kolar, | Ongoing | May 2029 | Not due yet |
| SWARNA GRIHA - 4 PHASE 2 | SY NO.S - 214/2, 215/1, 216/8, 216/9, 216/10, 216/11, 216/12, 216/13, 216/14, 216/15A, 216/15B, 216/16A, 216/18, 216/19, 216/20 , KAKATI VILLAGE AND HOBLI , Belagavi | Ongoing | Oct 2027 | Not due yet |
| SWARNAGRIHA NOVA GREENS | Sy no : 71/1, 71/2, 71/3, 71/4, 71/5 State Highway 96 , Nadupalli village, Hutlur Hobli, Honnenahalli Gram Panchayat Kolar, Karnataka , Kolar | Ongoing | Jul 2027 | Not due yet |
| Swarna Griha - 4 Phase 1 | Sy.No.214/2,215/1,216/8,216/9,216/10,216/11,216/12,216/13,216/14/216/15A,216/15B,216/16A,216/18,216/19,216/20 , of Kakati Village and Hobli, Belgaum , Belagavi , Belagavi, | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dharwad
Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's RERA Karnataka filing, in plain language.
- Red flags and clear checks, the possession story and who you are dealing with
- Every unit as filed, tower by tower: carpet area, undivided share of the land and parking, with the sizes placed against the other projects of the taluk
- The land chain survey by survey: conversion order, deed, khata and joint development, in date order
- Joined against the promoter's other registrations on RERA Karnataka and every project registered within 2 km, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep SWARNA GRIHA VISTARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dharwad250+ in Dharwad
construction of 1248 houses at Hubli
Commissioner
Akshay Town Tarihal Sector A
Suresh Enterprises Pvt.Ltd
ONE HUBLI PHASE-1
SHETTY-PATIL DEVELOPERS LLP
construction of 784 houses at Hubli
Commissioner
M/s. PRIDE IKON
M/s. PRIDE GROUP
Pourakarmikas Gruha Bhagya Yojane
Hubli Dharwad Municipal Corporation
See every Dharwad project, with the district possession charts
Builder: FELICITY ADOBE LLP
FELICITY ADOBE LLP has 8 registrations on RERA Karnataka, including SWARNA GRIHA - 4 PHASE 2 and Swarna Griha - 4 Phase 1. Its filings declare 6 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Dharwad district page.
Frequently asked questions
What are my rights if SWARNA GRIHA VISTARA is delayed beyond 30 Sep 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SWARNA GRIHA VISTARA?
The registered promoter entity is FELICITY ADOBE LLP, a partnership firm as per the filing. Its LLPIN AAJ-7502 and GSTIN 29AAMFT5978L2Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SWARNA GRIHA VISTARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SWARNA GRIHA VISTARA?
The professionals named in the filing: Architect: Pramod Shiggavi; Engineer: Sandeep Nagendra; Chartered Accountant: Poonacha SS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SWARNA GRIHA VISTARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback