Home / Browse projects / Bengaluru Urban, Karnataka / SUMADHURA SOLACE PHASE-II
SUMADHURA SOLACE PHASE-II
By SUMADHURA INFRACON PRIVATE LIMITED
RG-KA-81158 · RERA PRM/KA/RERA/1251/446/PR/111225/008333 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SUMADHURA SOLACE PHASE-II is a Residential/Group Housing project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/111225/008333 on 11 Dec 2025. Possession is promised by 31 Dec 2029. 0 of the 329 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameSUMADHURA SOLACE PHASE-II
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560066
- Pincode560066
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/111225/008333
- ReraGenie IDRG-KA-81158
Builder
- NameSUMADHURA INFRACON PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2012PTC062071
- GSTIN29AAQCS9641A1ZZ
- Authorized SignatoryG NAVEEN KUMAR
- Chairman and Managing DirectorGUNDA MADHUSUDHAN
- DirectorsBHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, G NAVEEN KUMAR, G SWAPNA, G MADHUSUDHAN, RAHUL KANDUKURI, Srinivas Moramchetty
- Project HeadPraveen Kumar G
- Other registrations20 more →
- Declared earlier projects16 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on11 Dec 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings4 building records
- Documents filed139 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower - 1 (LUMA) | - | - | - | 29 | 0 | 29 |
| Tower - 6 (MIRA) | - | - | - | 150 | 0 | 150 |
| Tower - 7 (OLEA) | - | - | - | 150 | 0 | 150 |
| VILLA | - | - | - | 2 | 0 | 2 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 2%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 2% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| NARASA REDDY.N | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 364.56 cr | Rs 15.25 cr |
| On-site expenditure-Site Overhead | Rs 45.63 cr | Rs 1.44 cr |
| Payment of taxes | Rs 31.05 cr | - |
| On-site expenditure-Consultants Fees | Rs 4.30 cr | Rs 11.17 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Narasimha Ragavan |
| Engineer | N.N. Nagendra Kumar |
| Chartered Accountant | CH PRANAY KUMAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed139
As listed on the registration, under the names the promoter filed them with; the newest 80 of 139 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/111225/008333 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 Solace-II.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate Solace-II 300926.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-Solace-II.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 300626-Solace-II_0001.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate Solace-II_300626.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-Solace-II.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326 Solace-II_0001.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate Solace-II 310326.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 Solace-II - converted.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 31122025 Solace-II.pdf | 16 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-31122025 Solace-II.pdf | 16 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate-Solace-II -31122025.pdf | 16 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 16 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 16 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 16 Jan 2026 |
| Q3 2025-26 Fire and Safety | 16 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 16 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 16 Jan 2026 |
| of 1 Areas Bifurcation Details SOLACE-I&IIFile: 1 of 1 Areas Bifurcation Details SOLACE-II.pdf | 5 Dec 2025 |
| of 2 Inventory Dev Area Bifurcation Details SOLACE-IIFile: 1 of 2 Inventory Dev Area Bifurcation Details SOLACE-II.pdf | 5 Dec 2025 |
| of 4 Agreement Of Sale Solace-Phase - IIFile: 1 of 4 Agreement Of Sale Solace-Phase - II.pdf | 5 Dec 2025 |
| of 5 Allotment Letter Solace- Phase - IIFile: 1 of 5 Allotment Letter Solace- Phase - II.pdf | 5 Dec 2025 |
| of 6 Estimated cost of construction certified by the Engineer-Solace-IIFile: 1 of 6 Estimated cost of construction certified by the Engineer-Solace-II.pdf | 5 Dec 2025 |
| of 7 STP Drawing As Per Kspcb Norms Certified by Engineer SOLACE Phase-IIFile: 1 of 7 STP Drawing As Per Kspcb Norms Certified by Engineer SOLACE Phase-II.pdf | 5 Dec 2025 |
| DP Approved Plan SolaceFile: 1 DP Approved Plan Solace.pdf | 28 Nov 2025 |
| NOC Work Order DP SolaceFile: 2 NOC Work Order DP Solace.pdf | 28 Nov 2025 |
| Building License-SolaceFile: 3 Building License-Solace.pdf | 28 Nov 2025 |
| ADLR Sketch-SolaceFile: 4 ADLR Sketch-Solace.pdf | 28 Nov 2025 |
| Commencement cirtificateFile: 6 Commencement Certificate.pdf | 28 Nov 2025 |
| Demarcation of Land area in approved plan-SaolaceFile: 7 Demarcation of Land area in approved plan-Saolace.pdf | 28 Nov 2025 |
| Demarked Site Location in Village MapFile: 8 Demarked Site Location in Village Map.pdf | 28 Nov 2025 |
| NOC KSPCB - SolaceFile: 9 NOC KSPCB - Solace.pdf | 28 Nov 2025 |
| Apprioval from KTCP Under sec 14File: 10 Apprioval from KTCP Under sec 14.pdf | 28 Nov 2025 |
| I 7 Form 3 Engineer Certificate-Solace-IFile: I 7 CE License.pdf | 28 Nov 2025 |
| I 8 Structural safety for bulding Solace-IIFile: I 8 Structural safety for bulding Solace-II.pdf | 28 Nov 2025 |
| I 9 Project Specification Solace Phase-IIFile: I 9 Project Specification Solace Phase-II (2).pdf | 28 Nov 2025 |
| I 10 Proforma of agreement (AFS) Solace-IIFile: I 10 Proforma of agreement (AFS) for sale.pdf | 28 Nov 2025 |
| I 11 Proforma of Allotment Solace-IIFile: I 11 Allotment Letter - Solace- Phaas - II.pdf | 28 Nov 2025 |
| I 12 NOC BESCOM with Receipt SolaceFile: I 12 NOC BESCOM with Receipt Solace.pdf | 28 Nov 2025 |
| I 13 NOC HAL SolaceFile: I 13 NOC HAL Solace.pdf | 28 Nov 2025 |
| I 14 Estimated Project Budget-SOLACE-IIFile: I 14 Estimated Project Budget-SOLACE_0001.pdf | 28 Nov 2025 |
| I 15 Land Cost Calculation sheet as per guidance value_0001File: I 15 Land Cost Calculation sheet as per guidance value_0001.pdf | 28 Nov 2025 |
| I 16 STP drawing as per kspcb certified by EngineerFile: I 16 STP drawing as per kspcb certified by Engineer.pdf | 28 Nov 2025 |
| II 1 Affidavit Bank with NotryFile: II 1 Affidavit Bank with Notry.pdf | 28 Nov 2025 |
| II 2 profit and loss account and balance sheetFile: II 2 profit and loss account and balance sheet.pdf | 28 Nov 2025 |
| II 3 Notarized Affidavit for 3(1) Voliation with NotaryFile: II 3 Notarized Affidavit for 3(1) Voliation with Notary_0001.pdf | 28 Nov 2025 |
| II 5 RTC ALL SY NO SFile: II 5 RTC ALL SY NO S.pdf | 28 Nov 2025 |
| II 6 MR No all SY NOFile: II 6 MR No all SY NO.pdf | 28 Nov 2025 |
| II 8 Conversion All Sy noFile: II 8 Conversion All Sy no.pdf | 28 Nov 2025 |
| II 9 EC 1-4-2004 to 28-3-2025 All SY NO'SFile: II 9 EC 1-4-2004 to 28-3-2025 All SY NO'S.pdf | 28 Nov 2025 |
| II 10 JDA 9482-2023-24(Chamundi)File: II 10 JDA 9482-2023-24(Chamundi).pdf | 28 Nov 2025 |
| II 11 Affidivat_Non-Litigation with NotaryFile: II 11 Affidivat_Non-Litigation with Notry_0001.pdf | 28 Nov 2025 |
| II 12 Affidavit cum Declaration Form-B with NotaryFile: II 12 Affidavit cum Declaration Form-B with Notry_0001.pdf | 28 Nov 2025 |
| II 13 advocate search reportFile: II 13 advocate search report.pdf | 28 Nov 2025 |
| II 4b Sale Deed 2167-1997-98(1A-25G) Sy 32-3File: II 4b Sale Deed 2167-1997-98(1A-25G) Sy 32-3.pdf | 28 Nov 2025 |
| II 4c Sale deed 29181994-95(15G) Sy 48-2File: II 4c Sale deed 29181994-95(15G) Sy 48-2.pdf | 28 Nov 2025 |
| II 4a Sale Deed-48-1 (2Gunta)File: II 4a Sale Deed-4182-96-97(Sy No 48-1).pdf | 28 Nov 2025 |
| II 4 Sale Deed No 5120-2011-12 (Sy No old 31-2 new 31-3)File: II 4 Sale Deed No 5120-2011-12 (Sy No old 31-2 new 31-3).pdf | 28 Nov 2025 |
| II d Sale Deed-48-1 (2Gunta)File: II d Sale Deed-48-1 (2Gunta).pdf | 28 Nov 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SUMADHURA SOLACE PHASE-II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
SBR ONE RESIDENCE
SBR STRUCTURES
Cloud Forest
Shreno Limited
MAHINDRA BLOSSOM
MAHINDRA LIFESPACE DEVELOPERS LIMITED
SUMADHURA SOLACE PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
FOLIUM BY SUMADHURA PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA EDITION PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SUMADHURA SOLACE PHASE-II is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SUMADHURA SOLACE PHASE-II?
The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SUMADHURA SOLACE PHASE-II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SUMADHURA SOLACE PHASE-II?
The professionals named in the filing: Architect: Narasimha Ragavan; Engineer: N.N. Nagendra Kumar; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUMADHURA SOLACE PHASE-II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback