MAHINDRA BLOSSOM
By MAHINDRA LIFESPACE DEVELOPERS LIMITED
RG-KA-50252 · RERA PRM/KA/RERA/1251/446/PR/171225/008348 · Last updated on RERA Karnataka portal: 9 Apr 2026
Source: official RERA Karnataka filing
Red flags
- Registration transferred
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
MAHINDRA BLOSSOM is a Mixed Development project by MAHINDRA LIFESPACE DEVELOPERS LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/171225/008348 on 17 Dec 2025. Possession is promised by 31 Oct 2030. 484 of the 735 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMAHINDRA BLOSSOM
- TypeMixed Development
- Location
- Bengaluru East
- Bengaluru Urban
- 560066
- Pincode560066
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/171225/008348
- ReraGenie IDRG-KA-50252
Builder
- NameMAHINDRA LIFESPACE DEVELOPERS LIMITED
- Entity typeCompany
- CINL45200MH1999PLC118949
- GSTIN29AAACG8904C1ZR
- Authorized SignatoryNandan V Mallya
- MdAMIT KUMAR SINHA
- DirectorsMr. AMEET PRATAPSINH HARIANI, Dr. ANISH DILIP SHAH, Mr. ANUJ PURI, Ms. AMRITA VERMA CHOWDHURY, Ms. ASHA KHARGA, Ms. RUCHA NANVATI, Mr. Milind Kulkarni, Mr. AMIT KUMAR SINHA
- Project HeadR. Aswath Prasad
- Other registrations4 more →
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistration transferred
- Registered on17 Dec 2025
- Promised completion31 Oct 2030
- Revised completionNone
- Buildings7 building records
- Documents filed118 files
Current status
Figures as on 9 Apr 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | - | - | - | 112 | 0 | 112 |
| Wing B | - | - | - | 163 | 0 | 163 |
| Wing C | - | - | - | 110 | 0 | 110 |
| Wing D | - | - | - | 108 | 0 | 108 |
| Wing E | - | - | - | 133 | 0 | 133 |
| Wing F | - | - | - | 107 | 0 | 107 |
| RETAIL | - | - | - | 0 | 2 | 2 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 9 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 15%.
Building: 1% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 15% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 9 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mahindra Lifespace Developers Limited | - | - |
| Mahindra Lifespace Developers Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 606.49 cr | Rs 2.00 cr |
| On-site expenditure-Salaries of workers | Rs 100.82 cr | Rs 15.11 cr |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 59.29 cr | Rs 44.57 cr |
| Payment of taxes | - | Rs 31.48 cr |
Certifying professionals and partners5
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Siddhartha M Rao |
| Architect | Srimathi J Adiga |
| Engineer | Vishnu Kumar |
| Engineer | B E Pruthviraja |
| Chartered Accountant | Venu and Vinay Associates |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00653/2026 | - | MAHINDRA LIFESPACE DEVELOPERS LIMITED | 04/06/2026 |
Documents filed118
As listed on the registration, under the names the promoter filed them with; the newest 80 of 118 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/171225/008348 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Mahindra Blossom - Mar-26 signed.pdf | 9 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Qu Architect Certificate_Mar 2026 - Blossom.pdf | 9 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM-6 MAHINDRA BLOSSOM 31-03-2026.pdf | 9 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q3 25-26 Mahindra Blossom.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q3 25-26 Mahindra Blossom.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q3 25-26 Mahindra Blossom.pdf | 13 Jan 2026 |
| Agreement for Sale Mahindra Blossom - RERAFile: Agreement for Sale Mahindra Blossom - RERA.pdf | 17 Dec 2025 |
| Approved Plan Page 1-18File: Approved Plan Page 1-18.pdf | 16 Dec 2025 |
| Approved Plan Page 2-18File: Approved Plan Page 2-18.pdf | 16 Dec 2025 |
| Approved Plan Page 3-18File: Approved Plan Page 3-18.pdf | 16 Dec 2025 |
| Approved Plan Page 4-18File: Approved Plan Page 4-18.pdf | 16 Dec 2025 |
| Approved Plan Page 5-18File: Approved Plan Page 5-18.pdf | 16 Dec 2025 |
| Approved Plan Page 6-18File: Approved Plan Page 6-18.pdf | 16 Dec 2025 |
| Approved Plan Page 7-18File: Approved Plan Page 7-18.pdf | 16 Dec 2025 |
| Approved Plan Page 8-18File: Approved Plan Page 8-18.pdf | 16 Dec 2025 |
| Approved Plan Page 9-18File: Approved Plan Page 9-18.pdf | 16 Dec 2025 |
| Approved Plan Page 10-18File: Approved Plan Page 10-18.pdf | 16 Dec 2025 |
| Approved Plan Page 11-18File: Approved Plan Page 11-18.pdf | 16 Dec 2025 |
| Approved Plan Page 12-18File: Approved Plan Page 12-18.pdf | 16 Dec 2025 |
| Approved Plan Page 13-18File: Approved Plan Page 13-18.pdf | 16 Dec 2025 |
| Approved Plan Page 14-18File: Approved Plan Page 14-18.pdf | 16 Dec 2025 |
| Approved Plan Page 15-18File: Approved Plan Page 15-18.pdf | 16 Dec 2025 |
| Approved Plan Page 16-18File: Approved Plan Page 16-18.pdf | 16 Dec 2025 |
| Approved Plan Page 17-18File: Approved Plan Page 17-18.pdf | 16 Dec 2025 |
| Approved Plan Page 18-18File: Approved Plan Page 18-18.pdf | 16 Dec 2025 |
| Building LicenseFile: Building License.pdf | 16 Dec 2025 |
| Mahindra Blossom Cost Estimate BreakupFile: 1 Mahindra Blossom Cost Estimate Breakup.pdf | 16 Dec 2025 |
| Land Calculation - Mahindra BlossomFile: 3 Land Calculation - Mahindra Blossom.pdf | 16 Dec 2025 |
| SEIAA NOC Clear copyFile: 4 SEIAA NOC Clear copy.pdf | 16 Dec 2025 |
| Carpet Area_Mahindra BlossomFile: 5 Carpet Area_Mahindra Blossom.pdf | 16 Dec 2025 |
| Unit Wise Area - Mahindra BlossomFile: 6 Unit Wise Area - Mahindra Blossom.pdf | 16 Dec 2025 |
| Clarification on Sales Mahindra Blossom V1File: 7 Clarification on Sales Mahindra Blossom V1.pdf | 16 Dec 2025 |
| FORM-3 MAHINDRA BLOSSOMFile: 8 FORM-3 MAHINDRA BLOSSOM.pdf | 16 Dec 2025 |
| RTC, survey 149 | - |
| Mutation, survey 149 | - |
| Encumbrance Certificate, survey 149 | - |
| Conversion/Alienation Order, survey 149 | - |
| Sale/Title/Gift Deed, survey 149 | - |
| Khatha, survey 149 | - |
| RTC, survey 150 | - |
| Mutation, survey 150 | - |
| Encumbrance Certificate, survey 150 | - |
| Conversion/Alienation Order, survey 150 | - |
| Sale/Title/Gift Deed, survey 150 | - |
| Khatha, survey 150 | - |
| Registration CertificateFile: Company Registration Certificate.PDF | - |
| Memorandum of AssociationFile: Company MOA.pdf | - |
| Article of AssociationFile: Company AOA.pdf | - |
| GST CertificateFile: MLDL-KA GST certificate.pdf | - |
| Organization StructureFile: Org Design _ Blossom.pdf | - |
| Certificate issued by CA Form 1File: Form-1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Mahindra Blossom.pdf | - |
| Certificate issued by Engineer Form 3File: 8 FORM-3 MAHINDRA BLOSSOM.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Engineer | - |
| Project Architect | - |
| Project Architect | - |
| AffidavitFile: Affidavit - Non litigation.pdf | - |
| Balance Sheet 2024 - 2025File: Balance Sheet FY 24 25.pdf | - |
| Balance Sheet 2023 - 2024File: Balance Sheet FY 23 24.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet FY 22 23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: Profit and Loss FY 24 25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss FY 23 24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss FY 22 23.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: MLDL ITR Ack AY 23 24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: MLDL ITR Ack AY 22 23.pdf | - |
| Director's Report 2024 - 2025File: Directors Report FY 24 25.pdf | - |
| Director's Report 2023 - 2024File: Directors Report FY 23 24.pdf | - |
| Director's Report 2022 - 2023File: Directors Report FY 22 23.pdf | - |
| Cash Flow Statement 2024 - 2025File: Cash flow FY 24 25.pdf | - |
| Cash Flow Statement 2023 - 2024File: Cash flow FY 23 24.pdf | - |
| Auditor's Report 2024 - 2025File: Auditors Report FY 24 25.pdf | - |
| Auditor's Report 2023 - 2024File: Auditors Report FY 23 24.pdf | - |
| Auditor's Report 2022 - 2023File: Auditors Report FY 22 23.pdf | - |
| BDA Work Order | - |
| Development Plan | - |
| Stability certificate | - |
| Project Specification V1 | - |
| Mahindra Blossom - Brochure Letter | - |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Mahindra NewHaven | "MAHINDRA NEWHAVEN SY NO 62, BASAPURA VILLAGE BEGUR HOBLI, | Ongoing | Dec 2029 | Not due yet |
| Mahindra Zen | "MAHINDRA ZEN SY NO 65 & 116/2, SINGASANDRA VILLAGE BEGUR HOBLI, | Ongoing | Dec 2028 | Not due yet |
| Mahindra Eden Phase-2 | Mahindra Eden Sy. No. 49 & 50/2, Holiday Village Road, Vajarahalli Village, | Ongoing | Jul 2027 | Not due yet |
| Mahindra Eden Phase-1 | Mahindra Eden Sy. No. 49 & 50/2, Holiday Village Road, Vajarahalli Village, | Ongoing | Mar 2027 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MAHINDRA BLOSSOM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
SBR ONE RESIDENCE
SBR STRUCTURES
Cloud Forest
Shreno Limited
SUMADHURA SOLACE PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
FOLIUM BY SUMADHURA PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA EDITION PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
DSR EVOQ
DSR GREEN HOMES
See every Bengaluru Urban project, with the district possession charts
Builder: MAHINDRA LIFESPACE DEVELOPERS LIMITED
MAHINDRA LIFESPACE DEVELOPERS LIMITED has 5 registrations on RERA Karnataka, including MAHINDRA EDEN PHASE-2 and MAHINDRA NEWHAVEN. Its filings declare 6 earlier projects, none of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MAHINDRA BLOSSOM is delayed beyond 31 Oct 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MAHINDRA BLOSSOM?
The registered promoter entity is MAHINDRA LIFESPACE DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1999PLC118949 and GSTIN 29AAACG8904C1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MAHINDRA BLOSSOM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MAHINDRA BLOSSOM?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at MAHINDRA BLOSSOM?
The professionals named in the filing: Architect: Siddhartha M Rao; Architect: Srimathi J Adiga; Engineer: Vishnu Kumar; Engineer: B E Pruthviraja; Chartered Accountant: Venu and Vinay Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHINDRA BLOSSOM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.