Home / Browse projects / Bengaluru Urban, Karnataka / FOLIUM BY SUMADHURA PHASE-I

Registration approved No litigation declared Residential/Group Housing project

FOLIUM BY SUMADHURA PHASE-I

By SUMADHURA INFRACON PRIVATE LIMITED

RG-KA-93568 · RERA PRM/KA/RERA/1251/446/PR/280222/004738 · Last updated on RERA Karnataka portal: 24 Feb 2022

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Jun 2025Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 115 documents Report an error

FOLIUM BY SUMADHURA PHASE-I is a Residential/Group Housing project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/280222/004738 on 28 Feb 2022. Possession is promised by 30 Jun 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameFOLIUM BY SUMADHURA PHASE-I
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560066
  • Pincode560066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/280222/004738
  • ReraGenie IDRG-KA-93568

Builder

  • NameSUMADHURA INFRACON PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200KA2012PTC062071
  • GSTIN29AAQCS9641A1ZZ
  • Authorized SignatoryBHARAT KUMAR KANDUKURI
  • Chairman and Managing DirectorG MADHUSUDHAN
  • DirectorsRAHUL KANDUKURI, BHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, G NAVEEN KUMAR, G SWAPNA, G MADHUSUDHAN
  • Project HeadRAMA RAO MALARAJ
  • Other registrations20 more →
  • Declared earlier projects16 →

Key dates

this monthRegisteredFeb 2022PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Feb 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed115 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WILLOW (WING-A )---2400240
ORCHID (WING-B)---2400240

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities29

As on 24 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,862 sq m
Named landowners6
LandownerVillageDistrict
H A SOMASHEKAR--
H A SRINIVAS--
H A KAVITHA--
H A SATHISH KUMAR--
H A NARENDRA KUMAR--
NAVED M HASSAN--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 283.73 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 192.48 cr-
On-site expenditure-Site OverheadRs 42.71 cr-
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 30.00 cr-
Payment of taxesRs 18.53 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV Narasimhan
EngineerD SRINIVAS
Chartered AccountantCH PRANAY KUMAR

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00102/2023-SUMADHURA INFRACON PRIVATE LIMITED19/01/2023

Documents filed115

As listed on the registration, under the names the promoter filed them with; the newest 80 of 115 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/280222/004738 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
47-3 JDA NaveedFile: 47-3 JDA Naveed.pdf24 Feb 2022
Sale Deed Doc for 47-2A (47-3)File: Sale Deed Doc for 47-2A (47-3).pdf24 Feb 2022
Sale Deed Naved Hassan for 47-2A (47-3)File: Sale Deed Naved Hassan for 47-2A (47-3).pdf24 Feb 2022
Deed of Sale 4067-2005-06 - 47-1 (9 files merged)File: Deed of Sale 4067-2005-06 - 47-1 (9 files merged).pdf24 Feb 2022
Sale Deed-5795 2018-19 Sy No 47-1File: Sale Deed-5795 2018-19 Sy No 47-1.pdf24 Feb 2022
Sale Deed Naved Hassan 2585 -2007-08 -47-2AFile: Sale Deed Naved Hassan 2585 -2007-08 -47-2A.pdf24 Feb 2022
Sale Deed Naved Hassan 261-1960-61- 47-2AFile: Sale Deed Naved Hassan 261-1960-61- 47-2A.pdf24 Feb 2022
Sale Deed Naved Hassan 2586-2007-08 - 47-2AFile: Sale Deed Naved Hassan 2586-2007-08 - 47-2A.pdf24 Feb 2022
Sale Deed Naved Hassan 2587-07-08 - 47-2AFile: Sale Deed Naved Hassan 2587-07-08 - 47-2A.pdf24 Feb 2022
BBMP Approved Site Plan in name of the CompanyFile: BBMP Approved Site Plans ABCD.pdf24 Feb 2022
RTC for Sy No 47-3File: RTC 47-3 (2 files merged).pdf21 Feb 2022
Hissa and TippaniFile: Hissa Tippani 47-2A & 3.pdf21 Feb 2022
Sale Deed of Naveed HassanFile: Sale Deed 47-1 (9 files merged).pdf21 Feb 2022
Affiavit of Non Litigation landFile: Affidavit Non Litigation of Land.pdf21 Feb 2022
Declaration Form-BFile: Declaration Form-B.pdf21 Feb 2022
BBMP Approved Site PlanFile: 01 BBMP Approved Site Plans ABCD.pdf21 Feb 2022
BBMP Approved Lower Basement Plans ABCDEFile: 02 BBMP Approved Lower Basement Plans ABCDE.pdf21 Feb 2022
BBMP Approved Upper Basement Plans ABCDEFile: 03 BBMP Approved Upper Basement Plans ABCDE.pdf21 Feb 2022
BBMP Approved Ground Plans ABCDFile: 04 BBMP Approved Ground Plans ABCD.pdf21 Feb 2022
BBMP Approved Groung Typical Plans AFile: 05 BBMP Approved Groung Typical Plans A.pdf21 Feb 2022
BBMP Approved Typical & Terrace Plans AFile: 06 BBMP Approved Typical & Terrace Plans A.pdf21 Feb 2022
BBMP Approved Groung to Typical Plans BFile: 07 BBMP Approved Groung to Typical Plans B.pdf21 Feb 2022
BBMP Approved Typical & Terrace Plans BFile: 08 BBMP Approved Typical & Terrace Plans B.pdf21 Feb 2022
BBMP Approved Section & Elevation Plans ABDFile: 13 BBMP Approved Section & Elevation Plans ABD.pdf21 Feb 2022
Phase-I Demarked Drawing(Willow&Orchid)File: Phase-I Demarked Drawing(Willow&Orchid).pdf21 Feb 2022
Development DetailsFile: Development Details.pdf21 Feb 2022
Affidavit with ACK NoFile: Affidavit with ACK No.pdf21 Feb 2022
AOSFile: AOS.pdf21 Feb 2022
STP Demarcated Drawing Lower Basement PlansFile: STP Demarcated Drawing Lower Basement Plans.pdf21 Feb 2022
BWSSB NOC Fee ReceiptFile: BWSSB NOC Fee Receipt.pdf21 Feb 2022
RTC, survey 47/1 47/2A 47/2B 47/3 48/3 48/4-
Mutation, survey 47/1 47/2A 47/2B 47/3 48/3 48/4-
Encumbrance Certificate, survey 47/1 47/2A 47/2B 47/3 48/3 48/4-
Conversion/Alienation Order, survey 47/1 47/2A 47/2B 47/3 48/3 48/4-
Sale/Title/Gift Deed, survey 47/1 47/2A 47/2B 47/3 48/3 48/4-
JDA, survey 47/1 47/2A 47/2B 47/3 48/3 48/4-
Khatha, survey 47/1 47/2A 47/2B 47/3 48/3 48/4-
Registration CertificateFile: Incorporation Certificate.pdf-
Organization StructureFile: Organaisation Chart.pdf-
Certificate issued by CA Form 1File: Form-1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form-2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit.pdf-
Certificate from Chartered AccountFile: Form-1 CA Certificate.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit & Loss.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit & Loss.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Audit P&L.pdf-
Director's Report 2020 - 2021File: Directors Report.pdf-
Director's Report 2019 - 2020File: Directors Report.pdf-
Director's Report 2018 - 2019File: Directors Report.pdf-
Cash Flow Statement 2020 - 2021File: Cashflow Statement.pdf-
Cash Flow Statement 2019 - 2020File: Cashflow.pdf-
Auditor's Report 2020 - 2021File: Audit Report.pdf-
Auditor's Report 2019 - 2020File: Audit Report.pdf-
Auditor's Report 2018 - 2019File: Auditor Report.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: IT Acknowledgement.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: IT Ack.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: IT Acknowledgement.pdf-
NOC BBMP License-
Electrical Permission-
NOC BWSSB-
BMP Approved Sanction Plans-
01 BBMP Approved Site Plans ABCD-
13 BBMP Approved Section & Elevation Plans ABD-
13 BBMP Approved Section & Elevation Plans ABD-
Project Secifications-
13 BBMP Approved Section & Elevation Plans ABD-
01 BBMP Approved Site Plans ABCD-
Structual Engineer Cer-
Guideline Value Whitefiled Village-
Urban Land Ceiling-
JDA Merged-
Change of Land Usage-
District Magistrate-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SUMADHURA NANDANAMBBMP Katha No 1087 Sy No 10/2 Hoodi Village KR Puram hobli, Bangalore East TalukCompleted-No date filed
SUMADHURA EDEN GARDENSy No 8/2 8/3 8/5 9/1 9/2 9/3 10 113/2 Doddabanahalli Village Bidarahalli Hobli Bangalore East BangaloreCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep FOLIUM BY SUMADHURA PHASE-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmFOLIUM BY SUMADHURA PHASOther 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: SUMADHURA INFRACON PRIVATE LIMITED

SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if FOLIUM BY SUMADHURA PHASE-I is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of FOLIUM BY SUMADHURA PHASE-I?

The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in FOLIUM BY SUMADHURA PHASE-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against FOLIUM BY SUMADHURA PHASE-I?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at FOLIUM BY SUMADHURA PHASE-I?

The professionals named in the filing: Architect: V Narasimhan; Engineer: D SRINIVAS; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FOLIUM BY SUMADHURA PHASE-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FOLIUM BY SUMADHURA PHASE-I. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FOLIUM BY SUMADHURA PHASE-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.