Home / Browse projects / Surat, Gujarat / SUDA LIG1-2

Valid until 30 Jun 2021 Mixed Development project

SUDA LIG1-2

By SURAT URBAN DEVELOPMENT AUTHORITY

RG-GJ-17138 · RERA PR/GJ/SURAT/CHORASI/SUDA/MAA05485/210519 · Last updated on GujRERA portal: 14 May 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jun 2021Possession promisedno revision filed
18 of 18Construction stages doneacross 2 buildings; every applicable stage filed complete
292 of 380Units unsoldnot recorded sold or booked
Jump to the 42 documents Report an error

SUDA LIG1-2 is a Mixed Development project by SURAT URBAN DEVELOPMENT AUTHORITY in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/CHORASI/SUDA/MAA05485/210519 on 21 May 2019. Possession is promised by 30 Jun 2021. 88 of the 380 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete.

At a glance

Project

  • NameSUDA LIG1-2
  • TypeMixed Development
  • Location
    • SACHIN SUDA SECTOR 2
    • PLOT NO 17 TO 26
    • Sachin
    • Chorasi
    • Surat
    • 394230
  • Pincode394230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/CHORASI/SUDA/MAA05485/210519
  • ReraGenie IDRG-GJ-17138

Builder

  • NameSURAT URBAN DEVELOPMENT AUTHORITY
  • Entity typeCOMPETENT AUTHORITY/ GOVERNMENT
  • Other registrations9 more →

Key dates

this monthRegisteredMay 2019PromisedJun 2021

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2021
  • Registered on21 May 2019
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings2 building records
  • Documents filed42 files

Current status

23%88 of 380 units booked
100.0%Of the estimated cost spent so far

Figures as on 14 May 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1+A2---17644220
B1+B2---1600160

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building2

As on 14 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 18 construction stages are filed complete across 2 buildings.

A1+A2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B1+B2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 14 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,623 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 17.39 cr
Cost incurredRs 17.39 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
A1+A2NARs 8.69 crRs 8.69 cr
B1+B2NARs 8.69 crRs 8.69 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHIMANSHU PANCHAL
EngineerJAYESH DALAL

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/CHORASI/SUDA/MAA05485/210519 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)14 May 2024
Engineer's certificate (Form 2)14 May 2024
Engineer's certificate annexure14 May 2024
Accountant's certificate (Form 3)14 May 2024
Site photograph, A1+A214 May 2024
Site photograph, B1+B214 May 2024
RERA registration certificate21 May 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

23%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep SUDA LIG1-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Sachin2,600+ in Surat

2 kmSUDA LIG1-2Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: SURAT URBAN DEVELOPMENT AUTHORITY

SURAT URBAN DEVELOPMENT AUTHORITY has 10 registrations on GujRERA, including SUDA LIG 1-5 EWS 4(GOTHAN)315 and SUDALIG2-2(KUMBHARIA)112. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if SUDA LIG1-2 is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SUDA LIG1-2?

The registered promoter entity is SURAT URBAN DEVELOPMENT AUTHORITY, a competent authority/ government as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SUDA LIG1-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SUDA LIG1-2?

The professionals named in the filing: Architect: HIMANSHU PANCHAL; Engineer: JAYESH DALAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUDA LIG1-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUDA LIG1-2. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUDA LIG1-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.