ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / SHIV DRASHTI RESIDENCY

Valid until 22 Oct 2023 Mixed Development project

SHIV DRASHTI RESIDENCY

By SHIVAM DEVELOPERS

RG-GJ-49037 · RERA PR/GJ/SURAT/CHORASI/SUDA/MAA01681/A1M/EX1/170423 · Last updated on GujRERA portal: 6 Oct 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Oct 2023Possession promisedmoved 12 months from the original
74 of 80Construction stages doneacross 12 buildings; furthest along: Slabs of Super Structure, 95%
251 of 646Units unsoldnot recorded sold or booked
Jump to the 49 documents Report an error

SHIV DRASHTI RESIDENCY is a Mixed Development project by SHIVAM DEVELOPERS in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/CHORASI/SUDA/MAA01681/A1M/EX1/170423 on 17 Feb 2018. Possession is promised by 22 Oct 2023. The completion date has moved by 12 months from the original filing. 395 of the 646 units on this registration are recorded sold or booked, and 74 of 80 construction stages are filed complete.

At a glance

Project

  • NameSHIV DRASHTI RESIDENCY
  • TypeMixed Development
  • Location
    • F.P. NO 64-65
    • O.P. NO. 64-65
    • BLOCK NO. - 67-68
    • SACHIN
    • Pardi Kande
    • Chorasi
    • Surat
    • 394230
  • Pincode394230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/CHORASI/SUDA/MAA01681/A1M/EX1/170423
  • ReraGenie IDRG-GJ-49037

Builder

  • NameSHIVAM DEVELOPERS
  • Entity typePARTNERSHIP FIRM
  • Other registrations45 more →

Key dates

this monthRegisteredFeb 2018First promiseOct 2022Revised toOct 2023

Key facts

Registration and timeline

  • StatusValid until 22 Oct 2023
  • Registered on17 Feb 2018
  • Promised completion22 Oct 2023
  • Revised completionRevised to 22 Oct 2023 (originally 23 Oct 2022)
  • Buildings12 building records
  • Documents filed49 files

Current status

61%395 of 646 units booked
66.5%Of the estimated cost spent so far

Figures as on 6 Oct 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
I---80080
J---80080
K---60060
L---60060
A---38442
B---38341
C---38442
D---60161
E---60060
F---40040
G---40040
H---40040

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building12

As on 6 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

74 of 80 construction stages are filed complete across 12 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

I61%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, internal plaster, floorings, doors and windows within flats20%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
J0%
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
K0%
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
L100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
E100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
F100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
H100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 6 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes60%
Water supplyYes60%
Sewerage (chamber, lines, septic tank, STP)Yes60%
Storm water drainsYes60%
Landscaping and tree plantingNoNot applicable
Street lightingYes60%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes60%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes60%
Fire fightingYes60%
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,595 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 22.20 cr
Cost incurredRs 14.77 cr
Spent of the estimate66.53%
BuildingWingEstimatedIncurred
ANARs 1.85 crRs 1.23 cr
BNARs 1.85 crRs 1.23 cr
CNARs 1.85 crRs 1.23 cr
DNARs 1.85 crRs 1.23 cr
ENARs 1.85 crRs 1.23 cr
FNARs 1.85 crRs 1.23 cr
GNARs 1.85 crRs 1.23 cr
HNARs 1.85 crRs 1.23 cr
INARs 1.85 crRs 1.23 cr
JNARs 1.85 crRs 1.23 cr
KNARs 1.85 crRs 1.23 cr
LNARs 1.85 crRs 1.23 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/SURAT/CHORASI/SUDA/MAA01681/A1M/EX1/170423Applied Nov 2022; approved Apr 2023

Documents filed49

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/CHORASI/SUDA/MAA01681/A1M/EX1/170423 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)6 Oct 2023
Engineer's certificate (Form 2)6 Oct 2023
Engineer's certificate annexure6 Oct 2023
Accountant's certificate (Form 3)6 Oct 2023
Site photograph, I6 Oct 2023
Site photograph, J6 Oct 2023
Site photograph, K6 Oct 2023
Site photograph, L6 Oct 2023
Site photograph, A6 Oct 2023
Site photograph, B6 Oct 2023
Site photograph, C6 Oct 2023
Site photograph, D6 Oct 2023
Site photograph, E6 Oct 2023
Site photograph, F6 Oct 2023
Site photograph, G6 Oct 2023
Site photograph, H6 Oct 2023
RERA registration certificate17 Feb 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

61%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one moved by 12 months

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep SHIV DRASHTI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Pardi Kande2,600+ in Surat

2 kmSHIV DRASHTI RESIDENCYOther 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: SHIVAM DEVELOPERS

SHIVAM DEVELOPERS has 46 registrations on GujRERA, including AARYA ENCLAVE and PUSHPAK EXOTICA. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if SHIV DRASHTI RESIDENCY is delayed beyond 22 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHIV DRASHTI RESIDENCY?

The registered promoter entity is SHIVAM DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHIV DRASHTI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SHIV DRASHTI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV DRASHTI RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV DRASHTI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.