ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B

Valid until 23 Nov 2018 Residential/Group Housing project

320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B

By GUJARAT HOUSING BOARD

RG-GJ-79948 · RERA PR/GJ/SURAT/CHORASI/SUDA/RAA03477/240918 · Last updated on GujRERA portal: 9 Nov 2018

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Nov 2018Possession promisedno revision filed
42 of 42Construction stages doneacross 6 buildings; every applicable stage filed complete
Jump to the 41 documents Report an error

320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B is a Residential/Group Housing project by GUJARAT HOUSING BOARD in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/CHORASI/SUDA/RAA03477/240918 on 24 Sep 2018. Possession is promised by 23 Nov 2018.

At a glance

Project

  • Name320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B
  • TypeResidential/Group Housing
  • Location
    • Behind Kanakpur Kansad Nagar Palika
    • Near Swaminarayan Mandir
    • Kanakpur Kansad
    • Kansad
    • Chorasi
    • Surat
    • 394230
  • Pincode394230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/CHORASI/SUDA/RAA03477/240918
  • ReraGenie IDRG-GJ-79948

Builder

  • NameGUJARAT HOUSING BOARD
  • Entity typeCOMPETENT AUTHORITY/ GOVERNMENT
  • Other registrations36 more →

Key dates

this monthRegisteredSep 2018PromisedNov 2018

Key facts

Registration and timeline

  • StatusValid until 23 Nov 2018
  • Registered on24 Sep 2018
  • Promised completion23 Nov 2018
  • Revised completionNone
  • Buildings6 building records
  • Documents filed41 files

Current status

100.0%Of the estimated cost spent so far

Figures as on 9 Nov 2018, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1-----56
2-----77
3-----51
4-----80
5-----112
6-----104

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 9 Nov 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

42 of 42 construction stages are filed complete across 6 buildings.

1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
4100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
5100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
6100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 9 Nov 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,665 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 26.74 cr
Cost incurredRs 26.74 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
1NARs 4.46 crRs 4.46 cr
2NARs 4.46 crRs 4.46 cr
3NARs 4.46 crRs 4.46 cr
4NARs 4.46 crRs 4.46 cr
5NARs 4.46 crRs 4.46 cr
6NARs 4.46 crRs 4.46 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectI-CON CONSULTANT ARCHITECTURE AND PLANNERS
EngineerDelf Consulting Engineers India Pvt. Ltd

Documents filed41

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/CHORASI/SUDA/RAA03477/240918 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)9 Nov 2018
Engineer's certificate (Form 2)9 Nov 2018
Site photograph, 19 Nov 2018
Site photograph, 29 Nov 2018
Site photograph, 39 Nov 2018
Site photograph, 49 Nov 2018
Site photograph, 59 Nov 2018
Site photograph, 69 Nov 2018
RERA registration certificate24 Sep 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kansad2,600+ in Surat

2 km320 LIG 1 + 480 LIG 2 ATOther 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: GUJARAT HOUSING BOARD

GUJARAT HOUSING BOARD has 37 registrations on GujRERA, including 12 SHOPS + 364 MIG I at Plot C & D Gota and 48 SHOPS 896 LIG II 672 MIG I 336 MIG II. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B is delayed beyond 23 Nov 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B?

The registered promoter entity is GUJARAT HOUSING BOARD, a competent authority/ government as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B?

The professionals named in the filing: Architect: I-CON CONSULTANT ARCHITECTURE AND PLANNERS; Engineer: Delf Consulting Engineers India Pvt. Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 320 LIG 1 + 480 LIG 2 AT SACHIN IN PLOT B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.