SRINIS URBANE
RG-KA-98440 · RERA PRM/KA/RERA/1251/308/PR/080922/005223 · Last updated on RERA Karnataka portal: 5 Sep 2022
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SRINIS URBANE is a Residential/Group Housing project by Srinivasa Constructions in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/080922/005223 on 8 Sep 2022. Possession is promised by 31 Dec 2025.
At a glance
Project
- NameSRINIS URBANE
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 562125
- Pincode562125
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/080922/005223
- ReraGenie IDRG-KA-98440
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on8 Sep 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed142 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK A | - | - | - | 56 | 0 | 56 |
| TOWER B | - | - | - | 56 | 0 | 56 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 5 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities38
As on 5 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SRINIVASA CONSTRUCTIONS Represented by its Authroised Signatory Mr. G Dhanjaya Naidu | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 34.19 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mythili. S |
| Engineer | SRINIVASA RAO BOLLIMUNTA INDIGO CONSULTANTS |
| Chartered Accountant | Sambasiva Naidu R |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed142
As listed on the registration, under the names the promoter filed them with; the newest 80 of 142 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/080922/005223 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Partnership DeedFile: Partnership Deed.pdf | 5 Sep 2022 |
| affidavit section 3File: AFFIDAVIT 3(1) NON VIOLATION.pdf | 19 Aug 2022 |
| FORM-BFile: AFFIDAVIT FORM-B.pdf | 19 Aug 2022 |
| NO LITIGATIONFile: AFFIDAVIT NON-LITIGATION.pdf | 19 Aug 2022 |
| FORM1 CA CERRTIFICATEFile: Form 1 CA Certificate.pdf | 19 Aug 2022 |
| FORM-3 ENGINEER CERTIFICATEFile: Form 3 Engineer Certificate.pdf | 19 Aug 2022 |
| FORM-2 ARCHITECT CERTIFICATEFile: Form-2 Architect certificate.pdf | 19 Aug 2022 |
| FINANCIALS 2019-2020File: Financials 2019-2020.pdf | 19 Aug 2022 |
| FINANCIALS 2020-2021File: Financials 2020-2021.pdf | 19 Aug 2022 |
| AOSFile: Agreement of Sale Proforma srinis urbane.pdf | 19 Aug 2022 |
| ESTIMATED COSTFile: ESTIMATED COST FINAL 16-08-2022.pdf | 19 Aug 2022 |
| ALLOTMENT LETTERFile: FLAT ALLOTMENT LETTER.pdf | 19 Aug 2022 |
| SINGLE PLOT LAYOUTFile: SINGLE PLAN LAYOUT COPY.pdf | 19 Aug 2022 |
| BOQFile: Srinivasa Constructions-BOQ.pdf | 19 Aug 2022 |
| chartered accountant certificateFile: srinis CA Certificat.pdf | 28 Jul 2022 |
| Bank account name should be as per bank account direction circularFile: srinis urbane cheqjpeg.pdf | 28 Jul 2022 |
| MRFile: MUTATION copy.pdf | 28 Jul 2022 |
| ec from 01 05 2005File: EC from 01-04-2004 to 03-07-2022.pdf | 28 Jul 2022 |
| form bFile: AFFIDAVIT FORM-B AUTHORIZATION G DHANANJAYA NAIDU.pdf | 28 Jul 2022 |
| advocate search reportFile: advocate search report.pdf | 28 Jul 2022 |
| 3(1)affidavitFile: AFFIDAVIT CUMDECLARATION-NON-VIOLATION.pdf | 28 Jul 2022 |
| hissa phodyFile: HISSA PODI.pdf | 28 Jul 2022 |
| khataFile: KHATHA 1.pdf | 28 Jul 2022 |
| partnership deedFile: PARTNERSHIP DEED Srinivasa const.pdf | 28 Jul 2022 |
| SR VALUEFile: CERTIFIED SR VALUE.pdf | 28 Jul 2022 |
| Non- litigation affidavitFile: AFFIDAVIT CUMDECLARATION NON-litigation.pdf | 28 Jul 2022 |
| Single Plot OrderFile: SINGLE PLAN LAYOUT COPY.pdf | 28 Jul 2022 |
| Building LicenseFile: Building License.pdf | 28 Jul 2022 |
| Architect Details with Valid COA numberFile: Architect Certificate yuktivs.pdf | 28 Jul 2022 |
| CDP planFile: MASTER PLAN CDP.pdf | 28 Jul 2022 |
| Village Map DemarcationFile: Village Map demarkation.pdf | 28 Jul 2022 |
| Engineer certificateFile: Srinis Engineers certificate.pdf | 28 Jul 2022 |
| AOSFile: Agreement of Sale Proforma aos.pdf | 28 Jul 2022 |
| BESCOM NOC N FEE COPYFile: BESCOM noc n fee receipt.pdf | 28 Jul 2022 |
| section 3(1) notarized affidavitFile: AFFIDAVIT 3(1) VIOLATION.pdf | 28 Jul 2022 |
| Project specificationFile: SRINIS URBANE SPECIFICATIONS.pdf | 28 Jul 2022 |
| STP location site planFile: STP DETAILS.pdf | 28 Jul 2022 |
| survey kaetchFile: survey kaetch.pdf | 28 Jul 2022 |
| RTC, survey 116/2 , 116/3 , 116/4 , 116/5 | - |
| Mutation, survey 116/2 , 116/3 , 116/4 , 116/5 | - |
| Encumbrance Certificate, survey 116/2 , 116/3 , 116/4 , 116/5 | - |
| Conversion/Alienation Order, survey 116/2 , 116/3 , 116/4 , 116/5 | - |
| Sale/Title/Gift Deed, survey 116/2 , 116/3 , 116/4 , 116/5 | - |
| Khatha, survey 116/2 , 116/3 , 116/4 , 116/5 | - |
| Registration CertificateFile: FIRM REGISTRATION CERTIFICATE.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Architect certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: AFFIDAVIT NON-LITIGATION.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA Certificate.pdf | - |
| Balance Sheet 2020 - 2021File: FY22.pdf | - |
| Balance Sheet 2019 - 2020File: Srinivasa constructions projected financials and CF.xlsx | - |
| Audited Profit and Loss Statement 2020 - 2021File: FY22.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Srinivasa constructions financial-2021.pdf | - |
| Cash Flow Statement 2020 - 2021File: FY22.pdf | - |
| Cash Flow Statement 2019 - 2020File: Srinivasa constructions projected financials and CF.xlsx | - |
| Income Tax Return Acknowledgement 2020 - 2021File: We will upload later.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: We will upload later.pdf | - |
| CC - SRINIVASA CONSTRUCTIONS | - |
| NOC WATER-SRINIVASA CONSTRUCTIONS | - |
| TYPICAL FLOOR PLAN | - |
| TYPICAL FLOOR PLAN_compressed | - |
| eLEVATION plan - Copy | - |
| TYPICAL FLOOR PLAN | - |
| scan0561 | - |
| SRINIS URBANE SPECIFICATIONS | - |
| TYPICAL FLOOR PLAN_compressed | - |
| TYPICAL FLOOR PLAN_compressed | - |
| Engineer Certificate srinivasaraobolimunta_10119 | - |
| We will upload later | - |
| CONVERSION ORDER 111-2012-13_compressed | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SRINIS URBANE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
Nambiar District 25 Phase 3
Nambiar EnsembleResidential Projects LLP
Meridian Park Phase II @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase I @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase III @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Nambiar District 25 Phase 2
Nambiar EnsembleResidential Projects LLP
SEVEN SARJAPUR
FORTUNE PRIMERO LLP
See every Bengaluru Urban project, with the district possession charts
Builder: Srinivasa Constructions
SRINIVASA CONSTRUCTIONS has 2 registrations on RERA Karnataka, including SRINIS PRISTINE and SRINIS URBANE. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SRINIS URBANE is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SRINIS URBANE?
The registered promoter entity is Srinivasa Constructions, a partnership firm as per the filing. Its GSTIN 29ADXFS2877H1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SRINIS URBANE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SRINIS URBANE?
The professionals named in the filing: Architect: Mythili. S; Engineer: SRINIVASA RAO BOLLIMUNTA INDIGO CONSULTANTS; Chartered Accountant: Sambasiva Naidu R. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SRINIS URBANE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.