Home / Browse projects / Bengaluru Urban, Karnataka / Sri Sri Sattva
Sri Sri Sattva
By SRI SUMERU REALTY PRIVATE LIMITED
RG-KA-27901 · RERA PRM/KA/RERA/1251/310/PR/300625/007883 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Sri Sri Sattva is a Residential/Group Housing project by SRI SUMERU REALTY PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/300625/007883 on 30 Jun 2025. Possession is promised by 31 Mar 2033. 199 of the 418 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.
At a glance
Project
- NameSri Sri Sattva
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560082
- Pincode560082
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/300625/007883
- ReraGenie IDRG-KA-27901
Builder
- NameSRI SUMERU REALTY PRIVATE LIMITED
- Entity typeCompany
- CINU07010KA2005PTC035470
- GSTIN29AAICS7169R1Z5
- Authorized SignatorySunit Suryakant Kaluskar
- Managing DirectorNarendra Singh Lamba
- DirectorsNarendra Singh Lamba, Sukanto Nitya Bhowal, Sandip Nowlakha
- Project HeadSunit Suryakant Kaluskar
- Other registrations3 more →
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on30 Jun 2025
- Promised completion31 Mar 2033
- Revised completionNone
- Buildings5 building records
- Documents filed194 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 76 | 0 | 76 |
| Tower B | - | - | - | 78 | 0 | 78 |
| Tower C | - | - | - | 84 | 0 | 84 |
| Tower D | - | - | - | 88 | 0 | 88 |
| Tower E | - | - | - | 92 | 0 | 92 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 80%.
Building: 18% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 80% |
| Upto Plinth Level | 80% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 58% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 15% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Precast Construction | Not applicable |
| Grouting for precast panels | Not applicable |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities42
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
| Clubhouse Terrace | Yes | 0% |
| Commercial Terrace | Yes | 0% |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SRI SUMERU REALTY PRIVATE LIMITED | - | - |
| SRI SUMERU REALTY PRIVATE LIMITED | - | - |
| SRI SUMERU REALTY PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 352.21 cr | Rs 83.52 cr |
| Payment of taxes | Rs 63.40 cr | Rs 8.66 cr |
| Interest on borrowings | Rs 12.00 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gayathri Shetty |
| Engineer | Sahana G |
| Chartered Accountant | V N Yadunath |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed194
As listed on the registration, under the names the promoter filed them with; the newest 80 of 194 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/300625/007883 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Signed CA Certificate.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: 2026-27 Q2-Form-5 Archi.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q2 26-27 Engineer certificate.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Sri Sri Sattva Form 4.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: 2026-27 Q1-Form-5_SRI SRI SATTVA.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Sri Sri Sattva Q1 .pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Sri Sri Sattva - Q4(Signed)_.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: 2025-26 Q4-Form-5_ .pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2025-26 Q4-Form-6 SSS_Signed.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q4 2025-26 Fire and Safety | 14 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 14 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 2025-26 Q3-Form-4- Signed.pdf | 30 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 2024-25 Q3-Form-5.pdf | 30 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2025-26_Q3_Form-6_.pdf | 30 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 30 Mar 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 30 Mar 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 30 Mar 2026 |
| Q3 2025-26 KPTCL- BESCOM | 30 Mar 2026 |
| Q3 2025-26 Fire and Safety | 30 Mar 2026 |
| Q3 2025-26 Airport Authority of India | 30 Mar 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 30 Mar 2026 |
| Development PlanFile: 2 Development Plan.pdf | 25 Jun 2025 |
| SITE PLANFile: 2 SITE PLAN.PDF | 25 Jun 2025 |
| Building LicenseFile: 4 Building License.pdf | 25 Jun 2025 |
| Project Location and DemarcationFile: 5 Project Location and Demarcation.pdf | 25 Jun 2025 |
| TOWER - A Building PlanFile: 6 TOWER - A Building Plan.pdf | 25 Jun 2025 |
| TOWER - B Building PlanFile: 6 TOWER - B Building Plan.pdf | 25 Jun 2025 |
| TOWER - C Building Plan 1File: 6 TOWER - C Building Plan 1.pdf | 25 Jun 2025 |
| TOWER - C Building Plan 2File: 6 TOWER - C Building Plan 2.pdf | 25 Jun 2025 |
| TOWER - D Building Plan 1File: 6 TOWER - D Building Plan 1.pdf | 25 Jun 2025 |
| TOWER - D building Plan 2File: 6 TOWER - D building Plan 2.pdf | 25 Jun 2025 |
| TOWER - E Building Plan 1File: 6 TOWER - E Building Plan 1.pdf | 25 Jun 2025 |
| TOWER - E Building Plan 2File: 6 TOWER - E Building Plan 2.pdf | 25 Jun 2025 |
| TOWER - F Building, Section and Elevation PlanFile: 6 TOWER - F Building, Section and Elevation Plan.pdf | 25 Jun 2025 |
| Commercial block Building, section and Elevation PlansFile: 6 Commercial block Building, section and Elevation Plans.pdf | 25 Jun 2025 |
| TOWER - A Section and elevation planFile: 7 TOWER - A Section and elevation plan.pdf | 25 Jun 2025 |
| TOWER - B Section and elevation planFile: 7 TOWER - B Section and elevation plan.pdf | 25 Jun 2025 |
| TOWER - C Section PlanFile: 7 TOWER - C Section Plan.pdf | 25 Jun 2025 |
| TOWER - C Elevation PlanFile: 7 TOWER - C Elevation Plan.pdf | 25 Jun 2025 |
| TOWER - D Section PlanFile: 7 TOWER - D Section Plan.pdf | 25 Jun 2025 |
| TOWER - D ElevationFile: 7 TOWER - D Elevation.pdf | 25 Jun 2025 |
| TOWER - E Section PlanFile: 7 TOWER - E Section Plan.pdf | 25 Jun 2025 |
| TOWER - E Elevation PlanFile: 7 TOWER - E Elevation Plan.pdf | 25 Jun 2025 |
| Commencement CertificateFile: 8 Commencement Certificate.pdf | 25 Jun 2025 |
| Master PlanFile: 9 Master Plan.pdf | 25 Jun 2025 |
| KSPCB - Payment ChallanFile: 10 KSPCB - Payment Challan.pdf | 25 Jun 2025 |
| Sy No 109File: 11 Sy No 109.pdf | 25 Jun 2025 |
| Sy No 112File: 11 Sy No 112.pdf | 25 Jun 2025 |
| Sy No 113File: 11 Sy No 113.pdf | 25 Jun 2025 |
| Engineer LicenseFile: 12 Engineer License.pdf | 25 Jun 2025 |
| Declaration for type of ProjectFile: 14 Declaration for type of Project.pdf | 25 Jun 2025 |
| Proforma of Agreement for SaleFile: 15 Proforma of Agreement for Sale.pdf | 25 Jun 2025 |
| Proforma of Allotment LetterFile: 15 Proforma of Allotment Letter.pdf | 25 Jun 2025 |
| Proforma of Sale DeedFile: 15 Proforma of Sale Deed.pdf | 25 Jun 2025 |
| Commercial Block DetailsFile: 13 Commercial Block Details.pdf | 25 Jun 2025 |
| Area StatementFile: Area Statement.pdf | 25 Jun 2025 |
| Query Answer DocumentFile: Query Answer Document.pdf | 25 Jun 2025 |
| RTC, survey 109 | - |
| Mutation, survey 109 | - |
| Encumbrance Certificate, survey 109 | - |
| Conversion/Alienation Order, survey 109 | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| HARIVISHRAM | SY NO. 113 of Kaggalipura Villge, Uttarahalli Hobli, , Bangalore South Taluk | Ongoing | Mar 2027 | Not due yet |
| SRI SRI NAGAR | Sy.No.410, 411, 412 & 432 , Uttarahalli Hobli, Bangalore Souh Taluk | Ongoing | Mar 2026 | Not delivered |
| SURATARU | SY NO. 165/1, 165/6, 165/15, 165/20 & 165/21 OF KAGGALIPURA VILLAGE, UTTARAHALLI HOBLI, BANGALORE SOUTH TALUK, | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sri Sri Sattva on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
AAROHANA ALTERRA
AAROHANA PROJECTS
BREN AVAANA
BREN CORPORATION PRIVATE LIMITED
BREN ANANTA
BREN CORPORATION PRIVATE LIMITED
Primus Darpan
Ameliorate Realtors Private Limited
HASIRU VISTHARA
Hasiru Realty LLP
AXIS AMARISSA
AXIS CONCEPT CONSTRUCTION PVT LTD
See every Bengaluru Urban project, with the district possession charts
Builder: SRI SUMERU REALTY PRIVATE LIMITED
Sri Sumeru Realty Private Limited has 4 registrations on RERA Karnataka, including SRI SRI NAGAR and HARIVISHRAM. Its filings declare 3 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sri Sri Sattva is delayed beyond 31 Mar 2033?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sri Sri Sattva?
The registered promoter entity is SRI SUMERU REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U07010KA2005PTC035470 and GSTIN 29AAICS7169R1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sri Sri Sattva?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Sri Sri Sattva?
The professionals named in the filing: Architect: Gayathri Shetty; Engineer: Sahana G; Chartered Accountant: V N Yadunath. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sri Sri Sattva?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback