Home / Browse projects / Bengaluru Urban, Karnataka / AXIS AMARISSA
AXIS AMARISSA
By AXIS CONCEPT CONSTRUCTION PVT LTD
RG-KA-07132 · RERA PRM/KA/RERA/1251/310/PR/141125/008255 · Last updated on RERA Karnataka portal: 31 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
AXIS AMARISSA is a Residential/Group Housing project by AXIS CONCEPT CONSTRUCTION PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/141125/008255 on 14 Nov 2025. Possession is promised by 31 Dec 2029. 24 of the 81 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.
At a glance
Project
- NameAXIS AMARISSA
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560082
- Pincode560082
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/141125/008255
- ReraGenie IDRG-KA-07132
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on14 Nov 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed121 files
Current status
Figures as on 31 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower | - | - | - | 81 | 0 | 81 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 31 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 95%.
Building: 21% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 95% |
| Foundation footing work | 90% |
| Upto Plinth Level | 85% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 90% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 31 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | No | Not applicable |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SRI. GAUTHAM KAMMAJE | - | - |
| Axis Concept Construction Pvt Ltd | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 52.28 cr | Rs 6.83 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 14.60 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.06 cr | Rs 75.27 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Girisha S |
| Engineer | D GURAPPA |
| Chartered Accountant | G. Pattabhi Reddy |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed121
As listed on the registration, under the names the promoter filed them with; the newest 80 of 121 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/141125/008255 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Form - 4 Axis Amarissa.pdf | 31 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Amarissa Q2 26-27.pdf | 31 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Amarissa Q2 26-27.pdf | 31 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 31 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 31 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 31 Oct 2026 |
| Q2 2026-27 Horticulture department | 31 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Axis Amarissa Q1 26-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Axis Amarissa Q1 26-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Axis Amarissa Q1 26-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 20260414_Amarissa_Q4_FY_2025-26_Form-4_CA_Certificate.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: 20260405_Amarissa_Q4_FY_2025-26_Form-5_Architect_Certificate.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 20260410_Amarissa_Q4_FY_2025-26_Form-6_Engineer_Certificate.pdf | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 20260112_Amarissa_Q3_FY_2025-26_Form-4_CA_Certificate.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 20260105_Amarissa_Q3_FY_2025-26_Form-5_Architect_Certificate.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 20260110_Amarissa_Q3_FY_2025-26_Form-6_Engineer_Certificate.pdf | 13 Jan 2026 |
| Engineer Valid LicenseFile: 1 Engineer Valid License.pdf | 13 Nov 2025 |
| Form-3 Engineer Certificate_NewFile: 3 Form-3 Engineer Certificate_New.pdf | 13 Nov 2025 |
| Stability Certificate_NewFile: 4 Stability Certificate_New.pdf | 13 Nov 2025 |
| Project Cost_NewFile: 5 Project Cost_New.pdf | 13 Nov 2025 |
| No Sale declaration - Axis AmarissaFile: 1 No Sale declaration - Axis Amarissa.pdf | 13 Nov 2025 |
| ANTARA OCFile: 3 ANTARA OC.pdf | 13 Nov 2025 |
| Form-4 CA Q4 2020-21 Axis AntaraFile: 4 Form-4 CA Q4 2020-21 Axis Antara.pdf | 13 Nov 2025 |
| Form-5 Architect Q4 2020-21 Axis AntaraFile: 5 Form-5 Architect Q4 2020-21 Axis Antara.pdf | 13 Nov 2025 |
| Form-6 Engineer Q4 2020-21 Axis AntaraFile: 6 Form-6 Engineer Q4 2020-21 Axis Antara.pdf | 13 Nov 2025 |
| FORM 7 FY 2018-19 Axis AntaraFile: 7 FORM 7 FY 2018-19 Axis Antara.pdf | 13 Nov 2025 |
| FORM 7 FY 2019-20 Axis AntaraFile: 8 FORM 7 FY 2019-20 Axis Antara.pdf | 13 Nov 2025 |
| FORM 7 FY 2020-21 Axis AntaraFile: 9 FORM 7 FY 2020-21 Axis Antara.pdf | 13 Nov 2025 |
| ANTARA CLARIFICATIONFile: 2 ANTARA CLARIFICATION.pdf | 13 Nov 2025 |
| STP Drawing signed by engineerFile: 6 STP Drawing signed by engineer.pdf | 13 Nov 2025 |
| RTC, survey 288/1 | - |
| Mutation, survey 288/1 | - |
| Encumbrance Certificate, survey 288/1 | - |
| Conversion/Alienation Order, survey 288/1 | - |
| Sale/Title/Gift Deed, survey 288/1 | - |
| JDA, survey 288/1 | - |
| Khatha, survey 288/1 | - |
| RTC, survey 288/1 | - |
| Mutation, survey 288/1 | - |
| Encumbrance Certificate, survey 288/1 | - |
| Conversion/Alienation Order, survey 288/1 | - |
| Sale/Title/Gift Deed, survey 288/1 | - |
| Khatha, survey 288/1 | - |
| Registration CertificateFile: Certificate of Incorporation.pdf | - |
| Memorandum of AssociationFile: MOA.pdf | - |
| Article of AssociationFile: AOA.pdf | - |
| GST CertificateFile: GST CERTIFICATE - Axis concept.pdf | - |
| Organization StructureFile: Organizational Chart Axis.pdf | - |
| Certificate issued by CA Form 1File: Form 1- CA Certificate -Axis Amarissa.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Architect certificate Axis Amarissa.pdf | - |
| Certificate issued by Engineer Form 3File: 3 Form-3 Engineer Certificate_New.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation Affidavit - Axis Amarissa.pdf | - |
| Balance Sheet 2024 - 2025File: BL and PL FY 2024-25.pdf | - |
| Balance Sheet 2023 - 2024File: Balance Sheet 23-24.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet 22-23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: BL and PL FY 2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss 23-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss 22-23.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: ITR FY 2024-25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR 23-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR 22-23.pdf | - |
| Director's Report 2024 - 2025File: BL and PL FY 2024-25.pdf | - |
| Director's Report 2023 - 2024File: Boards Report Axis Concept - 2024.pdf | - |
| Director's Report 2022 - 2023File: Board Report_2023.pdf | - |
| Cash Flow Statement 2024 - 2025File: BL and PL FY 2024-25.pdf | - |
| Cash Flow Statement 2023 - 2024File: Cashflow Statement 23-24.pdf | - |
| Auditor's Report 2024 - 2025File: Audit report FY 2024-25.pdf | - |
| Auditor's Report 2023 - 2024File: Audit report 23-24.pdf | - |
| Auditor's Report 2022 - 2023File: Audit report 22-23.pdf | - |
| Commencement Certificate | - |
| Approved plan Color | - |
| Sectional Basement and Terrace Plan | - |
| STR_ER_STRUCTURAL STABILITY CERTIFICATE | - |
| Project specification with seal and signature | - |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| AXIS OAKLYN | Sy No 46(P) in Sonnappanahalli Village, Jala Hobli , Yelahanka Taluk , Yelahanka , Bengaluru Urban | Ongoing | Mar 2027 | Not due yet |
| BOCHS Akshaya | Sy No.24,Begur Village, Begur Hobli, , Bangalore South , Bengaluru South , Bengaluru Urban | Completed | - | No date filed |
| Axis Vanam | Sy No 127/A,Katha No - 111/127/A, Kothanur Village, Uttarahalli Hobli | Completed | - | No date filed |
| Axis Antara | Katha No 106, Sy 27/1 and 27/2, yelenahalli village | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep AXIS AMARISSA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
AAROHANA ALTERRA
AAROHANA PROJECTS
Sri Sri Sattva
SRI SUMERU REALTY PRIVATE LIMITED
BREN AVAANA
BREN CORPORATION PRIVATE LIMITED
BREN ANANTA
BREN CORPORATION PRIVATE LIMITED
Primus Darpan
Ameliorate Realtors Private Limited
HASIRU VISTHARA
Hasiru Realty LLP
See every Bengaluru Urban project, with the district possession charts
Builder: AXIS CONCEPT CONSTRUCTION PVT LTD
Axis Concept Construction Pvt Ltd has 5 registrations on RERA Karnataka, including Axis Niran and Axis Vanam. Its filings declare 7 earlier projects, 5 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if AXIS AMARISSA is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of AXIS AMARISSA?
The registered promoter entity is AXIS CONCEPT CONSTRUCTION PVT LTD, a company as per the filing. Its CIN U45201KA2007PTC043841 and GSTIN 29AAHCA0685P1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in AXIS AMARISSA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at AXIS AMARISSA?
The professionals named in the filing: Architect: Girisha S; Engineer: D GURAPPA; Chartered Accountant: G. Pattabhi Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AXIS AMARISSA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback