ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / HASIRU VISTHARA

Registration approved No litigation declared Residential/Group Housing project

HASIRU VISTHARA

By Hasiru Realty LLP

RG-KA-68933 · RERA PRM/KA/RERA/1251/310/PR/311026/009069 · Last updated on RERA Karnataka portal: 30 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 81 documents Report an error

HASIRU VISTHARA is a Residential/Group Housing project by Hasiru Realty LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/311026/009069 on 31 Oct 2026. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameHASIRU VISTHARA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560082
  • Pincode560082
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/311026/009069
  • ReraGenie IDRG-KA-68933

Builder

  • NameHasiru Realty LLP
  • Entity typePartnership Firm
  • LLPINACF-5289
  • GSTIN29AAQFH7990C1ZS
  • Authorized SignatorySURESH BALAKRISHNAN

Key dates

this monthRegisteredOct 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on31 Oct 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HASIRU VISTHARA---1240124

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 30 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 30 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,420 sq m
Named landowners1
LandownerVillageDistrict
A N NAGESH--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 77.07 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 75.17 cr-
On-site expenditure-Consultants FeesRs 1.00 cr-
On-site expenditure-Site OverheadRs 90.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHAITANYA B K
EngineerRaghuveer N
Chartered AccountantBasavaraj M Katti

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed81

As listed on the registration, under the names the promoter filed them with; the newest 80 of 81 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/311026/009069 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
KHATHAFile: Form11A.pdf30 Oct 2026
STRUCTURAL STABILITY CERTIFICATEFile: Structural Stabality Certificate Updated.pdf30 Oct 2026
STP DRAWINGFile: STP Drawing.pdf30 Oct 2026
ENGINEER LICENCEFile: STRUCTURAL ENGINEER LICENCE.pdf30 Oct 2026
RTC, survey 288/4 (P)-
Mutation, survey 288/4 (P)-
Encumbrance Certificate, survey 288/4 (P)-
Conversion/Alienation Order, survey 288/4 (P)-
Sale/Title/Gift Deed, survey 288/4 (P)-
JDA, survey 288/4 (P)-
Khatha, survey 288/4 (P)-
Registration CertificateFile: Incorporation Certificate.pdf-
GST CertificateFile: GST Certificate Hasiru Realty LLP.pdf-
Partnership DeedFile: Partnership Agreement.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: FORM-1 CA CERTIFICATE UPDATED.pdf-
Certificate issued by Architect Form 2File: Hasiru Form 2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: FORM-3 ENGINEER CERTIFICATE UPDATED.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-
Balance Sheet 2025 - 2026File: Hasiru LLP BS 25-26.pdf-
Balance Sheet 2024 - 2025File: NO FINANCIALS DECLARATION.pdf-
Balance Sheet 2023 - 2024File: NO FINANCIALS DECLARATION.pdf-
Audited Profit and Loss Statement 2025 - 2026File: Hasiru LLP PL 25-26.pdf-
Audited Profit and Loss Statement 2024 - 2025File: NO FINANCIALS DECLARATION.pdf-
Audited Profit and Loss Statement 2023 - 2024File: NO FINANCIALS DECLARATION.pdf-
Income Tax Return Acknowledgement 2025 - 2026File: Hasiru LLP ITR 25-26.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: NO FINANCIALS DECLARATION.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: NO FINANCIALS DECLARATION.pdf-
COMMENCEMENT CERTIFICATE-
SANCTIONED PLAN-
SECTION AND ELEVATION DRAWING_11zon-
Stability Certificate - Hasiru Visthara-
RERA Project Specification-
Hasiru Visthara BROCHURE-
AGREEMENT FOR SALE HASIRU UPDATED-
ALLOTMENT LETTER HASIRU-
Form - B-
SECTION 3 AFFIDAVIT-
RERA Joint Affidavit Declartion-
Legal opinion Sy No 288-4-
Hasiru BESCOM-
NOC- Water Board-
Hasiru Realty KSPCB CFE-
Hasiru Realty LLP EC copy-
HASIRU-FIRE NOC-
Hasiru AAI NOC-
Hasiru BSNL-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
STP -Approved drawing-
Change of Land Use-
BM_Kaval_V_map_Sat-
GPA of Hasiru R LLP-
PODI SKETCH 27-Apr-2022-
SURVEY SKETCH-
Certified Partition Deed-
PODI MR-
ADLR SURVEY SKETCH-
Borewell Point GPS-
BASEMENT 1 DRAWING_11zon-
BASEMENT 2 DRAWING_11zon-
GROUND FLOOR PLAN_11zon-
FLOOR PLANS_11zon-
FLOOR AND TERRACE PLANS_11zon-
SECTION AND ELEVATION DRAWING_11zon-
Amenities Declaration SIGNED-
COST ESTIMATION UPDATED-
SINGLE LAYOUT PLAN AND ORDER-
STRUCTURAL ENGINEER LICENCE-
LAND COST CALCULATION WITH GV-
S R Value-
Building Plan Application Copy-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep HASIRU VISTHARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmHASIRU VISTHARAOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Hasiru Realty LLP

Hasiru Realty LLP has 1 registration on RERA Karnataka, including HASIRU VISTHARA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if HASIRU VISTHARA is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of HASIRU VISTHARA?

The registered promoter entity is Hasiru Realty LLP, a partnership firm as per the filing. Its LLPIN ACF-5289 and GSTIN 29AAQFH7990C1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in HASIRU VISTHARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at HASIRU VISTHARA?

The professionals named in the filing: Architect: CHAITANYA B K; Engineer: Raghuveer N; Chartered Accountant: Basavaraj M Katti. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HASIRU VISTHARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HASIRU VISTHARA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HASIRU VISTHARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.