ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / BREN ANANTA

Registration approved No litigation declared Residential/Group Housing project

BREN ANANTA

By BREN CORPORATION PRIVATE LIMITED

RG-KA-57602 · RERA PRM/KA/RERA/1251/310/PR/060324/006694 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2027Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 98%
199 of 217Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 175 documents Report an error

BREN ANANTA is a Residential/Group Housing project by BREN CORPORATION PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/060324/006694 on 6 Mar 2024. Possession is promised by 31 Aug 2027. 18 of the 217 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameBREN ANANTA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560082
  • Pincode560082
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/060324/006694
  • ReraGenie IDRG-KA-57602

Builder

  • NameBREN CORPORATION PRIVATE LIMITED
  • Entity typeCompany
  • CINU45203KA2012PTC064294
  • GSTIN29AAFCB6608K1ZD
  • Authorized SignatoryAmit P Vernekar
  • DirectorJ Boopesh Reddy
  • DirectorsJ Boopesh Reddy, Deepa Boopesh Reddy, Arjun Boopesh Reddy
  • Project HeadRam Devrani
  • Other registrations6 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2024PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Mar 2024
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed175 files

Current status

8%18 of 217 units booked
1.8%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER1---1220122
TOWER2---95095

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 98%.

Building: 27% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work98%
Foundation footing work98%
Upto Plinth Level98%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)98%
Retaining wall (All types)98%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership7

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,253 sq m
Named landowners7
LandownerVillageDistrict
R Ashok Kumar--
R Ashok Kumar--
R Ashok Kumar--
R Ashok Kumar--
R Ashok Kumar--
R Ashok Kumar--
R Ashok Kumar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 158.25 cr
Cost incurredRs 2.82 cr
Spent of the estimate1.78%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 122.02 crRs 2.57 cr
Payment of taxesRs 12.10 crRs 22,372
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 9.00 cr-
On-site expenditure-Salaries of workersRs 8.52 crRs 24.65 lakh
On-site expenditure-Consultants FeesRs 3.84 cr-
On-site expenditure-Site OverheadRs 2.13 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 63.92 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLAKSHMI CR
EngineerAmarnath R Boraiah
Chartered AccountantAmit Someshwar Padaki

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed175

As listed on the registration, under the names the promoter filed them with; the newest 80 of 175 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/060324/006694 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form4 - Bren Ananta.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (2026 - 27 Q2 SEP'2026) BREN ANANTA.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (2026 - 27 Q2) - BREN ANANTHA.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate FY 2026-27 QTR 1 BRIN ANANTA.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Certificate FY 2026-27 QTR 1 Form-5 Architect _2026 - 27 Q1_ BREN ANANTA.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate FY 2026-27 QTR 1 BREN ANANTHA.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Cirtificate Bren Ananta QTR 4 2025-26.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (2025 - 26 Q4) BREN ANANTA.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: BREN ANANTH.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Form-4 Qtr-3 FY-2025-26 Bren Ananata_0001.pdf9 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 3 Form-5 Architect (2025 - 26 Q3) BREN ANANTA.pdf9 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Form-6 BREN ANANTHA.pdf9 Feb 2026
Q3 2025-26 Water supply and sewage board9 Feb 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)9 Feb 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)9 Feb 2026
Q3 2025-26 KPTCL- BESCOM9 Feb 2026
Q3 2025-26 Fire and Safety9 Feb 2026
Q3 2025-26 Airport Authority of India9 Feb 2026
Q3 2025-26 BSNL/Telecommunication Department9 Feb 2026
Bank Letter for RERA Account -AnantaFile: 1 Bank Letter for RERA Account -Ananta.pdf5 Mar 2024
Development PlanFile: 1 Development Plan.pdf5 Mar 2024
DP WORK ORDERFile: 2 DP WORK ORDER.pdf5 Mar 2024
Building License - Sanction Order CopyFile: 3 Building Licence - Sanction Order Copy.pdf5 Mar 2024
Relinquishment DeedFile: 4 Relinquishment Deed.pdf5 Mar 2024
CDP mapFile: 5 CDP map.pdf5 Mar 2024
Village MapFile: 6 Village Map.pdf5 Mar 2024
Area Statement Bren AnantaFile: 7 Area Statement Bren Ananta.pdf5 Mar 2024
KSPCB ClarificationFile: 8 KSPCB Clarification.pdf5 Mar 2024
ZR for nala bufferFile: 8 Nala Buffer Kanankapura Authority Zoning.pdf5 Mar 2024
Clarification on Kaludari PortionFile: 9 Clarification on Kaludari.pdf5 Mar 2024
Commencement CertificateFile: 10 Bren Ananta Commencement Certificate.pdf5 Mar 2024
NALA in DP plan and Village mapFile: 10 NALA in DP plan and Village map.pdf5 Mar 2024
All sanctioned drawings Floor plans, sectional drawings and elevationsFile: 11 Plan Sanction Part 1.pdf5 Mar 2024
All sanctioned drawings Floor plans, sectional drawings and elevationsFile: 11 Plan Sanction Part 2.pdf5 Mar 2024
Form 03 RERA Engineer CertificateFile: 11 Form 03 RERA Engineer Certificate BREN ANANTA.pdf5 Mar 2024
Proforma of agreement for saleFile: 12 Draft Proforma of Agreement for Sale - ANANTA.pdf5 Mar 2024
Cost Estimate copyFile: 13 Estimated Costing.pdf5 Mar 2024
EC Sy No 174-3 and 174-4File: EC Sy No 174-3 and 174-4.pdf5 Mar 2024
EC Sy No 174-5 and 174-7File: EC Sy No 174-5 and 174-7.pdf5 Mar 2024
EC Sy No 174-6 and 174-8File: EC Sy No 174-6 and 174-8.pdf5 Mar 2024
EC Sy No 175File: EC Sy No 175.pdf5 Mar 2024
Title deeds of the land owner of all sno involved in the projectFile: 15 Gift deed.pdf5 Mar 2024
Sale deed Sy No 170 and 175File: Sale deed Sy No 170 and 175.pdf5 Mar 2024
Sale deed SY No 174 3 and 174 4File: Sale deed SY No 174 3 and 174 4.pdf5 Mar 2024
Sale deed Sy No 174File: Sale deed Sy No 174.pdf5 Mar 2024
Sale deed Sy No 174 5 and 174 7File: Sale deed Sy No 174 5 and 174 7.pdf5 Mar 2024
Clarification on katha extract issued by GP/RDPR for the sites developed in sno 173/3File: 19 Sy 174-3 Clarification.pdf5 Mar 2024
Khatha -BREN AnantaFile: 16 Khatha -BREN Ananta.pdf5 Mar 2024
MR in favour of agricultural land ownerFile: 17 MR all Sy No Before conversion.pdf5 Mar 2024
MR in favour of agricultural land owner - Sy No 174-6 and 174-8File: 20 MR 174-6 and 174-8.pdf5 Mar 2024
Atlas Sy no 174File: 21 Atlas Sy no 174.pdf5 Mar 2024
Resurvey Pakka dated 28012013 Sy No 174File: 22 Resurvey Pakka dated 28012013 Sy No 174.pdf5 Mar 2024
Survey Sketch dated 24012013File: 23 Survey Sketch dated 24012013.pdf5 Mar 2024
Ananta Joint SketchFile: 18 Ananta Joint Sketch.pdf5 Mar 2024
Village map showing proposed siteFile: Kaggaleepura village Map.pdf5 Mar 2024
Akarband 174-6 and 174-8File: 24 Akarband 174-6 and 174-8.pdf5 Mar 2024
RTC, survey 174/3-
Mutation, survey 174/3-
Encumbrance Certificate, survey 174/3-

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 not delivered by the promised date1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
BREN COSMOSy No. 60/2A, 60/2B, 60/2C, Nimbekaipura Village, , Bidarahalli Hobli, Bengaluru East Taluk , Nimbekaipura Village , Bengaluru East ,OngoingJan 2026Not delivered
SOHO BY BREN"KHATA NO. 814/49/52, THALAGHATTAPURA, NEAR SILK INSTITUTE METRO STATION, KANAKAPURA MAIN ROAD, BENGALURU SOUTH, BENGALURU URBAN"OngoingNov 2025Not delivered
BREN ASPERA"SY NO. 23/1A, 24/1A, 24/1B, 24/2A, BANDAPURA VILLAGE BIDARAHALLI HOBLI, BANGALORE EAST TALUK, OLD MADRAS ROAD , BENGALURU SOUTH, BENGALURU URBAN"OngoingNov 2025Not delivered
BREN ZAHARASY NO. 36/1 AND 39 HARALUR VILLAGE, VARTHUR HOBLI BANGALORE EAST TALUK BANGALORE, BENGALURU EAST, BENGALURU URBANOngoingMar 2024Not delivered
BREN NORTHERN LIGHTSSY.NO. 8,GASTIKEMPANAHALLI, YALAHANKA HOBLI, BENGALURU NORTH, BENGALURU URBANCompleted-No date filed

How this compares with Bengaluru Urban

8%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep BREN ANANTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmBREN ANANTAOther 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: BREN CORPORATION PRIVATE LIMITED

BREN CORPORATION PRIVATE LIMITED has 7 registrations on RERA Karnataka, including BREN PARK CITY and BREN NORTHERN LIGHTS. Its filings declare 5 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if BREN ANANTA is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BREN ANANTA?

The registered promoter entity is BREN CORPORATION PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2012PTC064294 and GSTIN 29AAFCB6608K1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BREN ANANTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BREN ANANTA?

The professionals named in the filing: Architect: LAKSHMI CR; Engineer: Amarnath R Boraiah; Chartered Accountant: Amit Someshwar Padaki. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BREN ANANTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BREN ANANTA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BREN ANANTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.