Home / Browse projects / Bengaluru Urban, Karnataka / BREN ANANTA
BREN ANANTA
By BREN CORPORATION PRIVATE LIMITED
RG-KA-57602 · RERA PRM/KA/RERA/1251/310/PR/060324/006694 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
BREN ANANTA is a Residential/Group Housing project by BREN CORPORATION PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/060324/006694 on 6 Mar 2024. Possession is promised by 31 Aug 2027. 18 of the 217 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameBREN ANANTA
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560082
- Pincode560082
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/060324/006694
- ReraGenie IDRG-KA-57602
Builder
- NameBREN CORPORATION PRIVATE LIMITED
- Entity typeCompany
- CINU45203KA2012PTC064294
- GSTIN29AAFCB6608K1ZD
- Authorized SignatoryAmit P Vernekar
- DirectorJ Boopesh Reddy
- DirectorsJ Boopesh Reddy, Deepa Boopesh Reddy, Arjun Boopesh Reddy
- Project HeadRam Devrani
- Other registrations6 more →
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Mar 2024
- Promised completion31 Aug 2027
- Revised completionNone
- Buildings2 building records
- Documents filed175 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER1 | - | - | - | 122 | 0 | 122 |
| TOWER2 | - | - | - | 95 | 0 | 95 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 98%.
Building: 27% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 98% |
| Foundation footing work | 98% |
| Upto Plinth Level | 98% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 98% |
| Retaining wall (All types) | 98% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership7
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| R Ashok Kumar | - | - |
| R Ashok Kumar | - | - |
| R Ashok Kumar | - | - |
| R Ashok Kumar | - | - |
| R Ashok Kumar | - | - |
| R Ashok Kumar | - | - |
| R Ashok Kumar | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 122.02 cr | Rs 2.57 cr |
| Payment of taxes | Rs 12.10 cr | Rs 22,372 |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 9.00 cr | - |
| On-site expenditure-Salaries of workers | Rs 8.52 cr | Rs 24.65 lakh |
| On-site expenditure-Consultants Fees | Rs 3.84 cr | - |
| On-site expenditure-Site Overhead | Rs 2.13 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 63.92 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LAKSHMI CR |
| Engineer | Amarnath R Boraiah |
| Chartered Accountant | Amit Someshwar Padaki |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed175
As listed on the registration, under the names the promoter filed them with; the newest 80 of 175 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/060324/006694 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form4 - Bren Ananta.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (2026 - 27 Q2 SEP'2026) BREN ANANTA.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (2026 - 27 Q2) - BREN ANANTHA.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate FY 2026-27 QTR 1 BRIN ANANTA.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Certificate FY 2026-27 QTR 1 Form-5 Architect _2026 - 27 Q1_ BREN ANANTA.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate FY 2026-27 QTR 1 BREN ANANTHA.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Cirtificate Bren Ananta QTR 4 2025-26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (2025 - 26 Q4) BREN ANANTA.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: BREN ANANTH.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Form-4 Qtr-3 FY-2025-26 Bren Ananata_0001.pdf | 9 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 3 Form-5 Architect (2025 - 26 Q3) BREN ANANTA.pdf | 9 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Form-6 BREN ANANTHA.pdf | 9 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 9 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 9 Feb 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 9 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 9 Feb 2026 |
| Q3 2025-26 Fire and Safety | 9 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 9 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 9 Feb 2026 |
| Bank Letter for RERA Account -AnantaFile: 1 Bank Letter for RERA Account -Ananta.pdf | 5 Mar 2024 |
| Development PlanFile: 1 Development Plan.pdf | 5 Mar 2024 |
| DP WORK ORDERFile: 2 DP WORK ORDER.pdf | 5 Mar 2024 |
| Building License - Sanction Order CopyFile: 3 Building Licence - Sanction Order Copy.pdf | 5 Mar 2024 |
| Relinquishment DeedFile: 4 Relinquishment Deed.pdf | 5 Mar 2024 |
| CDP mapFile: 5 CDP map.pdf | 5 Mar 2024 |
| Village MapFile: 6 Village Map.pdf | 5 Mar 2024 |
| Area Statement Bren AnantaFile: 7 Area Statement Bren Ananta.pdf | 5 Mar 2024 |
| KSPCB ClarificationFile: 8 KSPCB Clarification.pdf | 5 Mar 2024 |
| ZR for nala bufferFile: 8 Nala Buffer Kanankapura Authority Zoning.pdf | 5 Mar 2024 |
| Clarification on Kaludari PortionFile: 9 Clarification on Kaludari.pdf | 5 Mar 2024 |
| Commencement CertificateFile: 10 Bren Ananta Commencement Certificate.pdf | 5 Mar 2024 |
| NALA in DP plan and Village mapFile: 10 NALA in DP plan and Village map.pdf | 5 Mar 2024 |
| All sanctioned drawings Floor plans, sectional drawings and elevationsFile: 11 Plan Sanction Part 1.pdf | 5 Mar 2024 |
| All sanctioned drawings Floor plans, sectional drawings and elevationsFile: 11 Plan Sanction Part 2.pdf | 5 Mar 2024 |
| Form 03 RERA Engineer CertificateFile: 11 Form 03 RERA Engineer Certificate BREN ANANTA.pdf | 5 Mar 2024 |
| Proforma of agreement for saleFile: 12 Draft Proforma of Agreement for Sale - ANANTA.pdf | 5 Mar 2024 |
| Cost Estimate copyFile: 13 Estimated Costing.pdf | 5 Mar 2024 |
| EC Sy No 174-3 and 174-4File: EC Sy No 174-3 and 174-4.pdf | 5 Mar 2024 |
| EC Sy No 174-5 and 174-7File: EC Sy No 174-5 and 174-7.pdf | 5 Mar 2024 |
| EC Sy No 174-6 and 174-8File: EC Sy No 174-6 and 174-8.pdf | 5 Mar 2024 |
| EC Sy No 175File: EC Sy No 175.pdf | 5 Mar 2024 |
| Title deeds of the land owner of all sno involved in the projectFile: 15 Gift deed.pdf | 5 Mar 2024 |
| Sale deed Sy No 170 and 175File: Sale deed Sy No 170 and 175.pdf | 5 Mar 2024 |
| Sale deed SY No 174 3 and 174 4File: Sale deed SY No 174 3 and 174 4.pdf | 5 Mar 2024 |
| Sale deed Sy No 174File: Sale deed Sy No 174.pdf | 5 Mar 2024 |
| Sale deed Sy No 174 5 and 174 7File: Sale deed Sy No 174 5 and 174 7.pdf | 5 Mar 2024 |
| Clarification on katha extract issued by GP/RDPR for the sites developed in sno 173/3File: 19 Sy 174-3 Clarification.pdf | 5 Mar 2024 |
| Khatha -BREN AnantaFile: 16 Khatha -BREN Ananta.pdf | 5 Mar 2024 |
| MR in favour of agricultural land ownerFile: 17 MR all Sy No Before conversion.pdf | 5 Mar 2024 |
| MR in favour of agricultural land owner - Sy No 174-6 and 174-8File: 20 MR 174-6 and 174-8.pdf | 5 Mar 2024 |
| Atlas Sy no 174File: 21 Atlas Sy no 174.pdf | 5 Mar 2024 |
| Resurvey Pakka dated 28012013 Sy No 174File: 22 Resurvey Pakka dated 28012013 Sy No 174.pdf | 5 Mar 2024 |
| Survey Sketch dated 24012013File: 23 Survey Sketch dated 24012013.pdf | 5 Mar 2024 |
| Ananta Joint SketchFile: 18 Ananta Joint Sketch.pdf | 5 Mar 2024 |
| Village map showing proposed siteFile: Kaggaleepura village Map.pdf | 5 Mar 2024 |
| Akarband 174-6 and 174-8File: 24 Akarband 174-6 and 174-8.pdf | 5 Mar 2024 |
| RTC, survey 174/3 | - |
| Mutation, survey 174/3 | - |
| Encumbrance Certificate, survey 174/3 | - |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| BREN COSMO | Sy No. 60/2A, 60/2B, 60/2C, Nimbekaipura Village, , Bidarahalli Hobli, Bengaluru East Taluk , Nimbekaipura Village , Bengaluru East , | Ongoing | Jan 2026 | Not delivered |
| SOHO BY BREN | "KHATA NO. 814/49/52, THALAGHATTAPURA, NEAR SILK INSTITUTE METRO STATION, KANAKAPURA MAIN ROAD, BENGALURU SOUTH, BENGALURU URBAN" | Ongoing | Nov 2025 | Not delivered |
| BREN ASPERA | "SY NO. 23/1A, 24/1A, 24/1B, 24/2A, BANDAPURA VILLAGE BIDARAHALLI HOBLI, BANGALORE EAST TALUK, OLD MADRAS ROAD , BENGALURU SOUTH, BENGALURU URBAN" | Ongoing | Nov 2025 | Not delivered |
| BREN ZAHARA | SY NO. 36/1 AND 39 HARALUR VILLAGE, VARTHUR HOBLI BANGALORE EAST TALUK BANGALORE, BENGALURU EAST, BENGALURU URBAN | Ongoing | Mar 2024 | Not delivered |
| BREN NORTHERN LIGHTS | SY.NO. 8,GASTIKEMPANAHALLI, YALAHANKA HOBLI, BENGALURU NORTH, BENGALURU URBAN | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep BREN ANANTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
AAROHANA ALTERRA
AAROHANA PROJECTS
Sri Sri Sattva
SRI SUMERU REALTY PRIVATE LIMITED
BREN AVAANA
BREN CORPORATION PRIVATE LIMITED
Primus Darpan
Ameliorate Realtors Private Limited
HASIRU VISTHARA
Hasiru Realty LLP
AXIS AMARISSA
AXIS CONCEPT CONSTRUCTION PVT LTD
See every Bengaluru Urban project, with the district possession charts
Builder: BREN CORPORATION PRIVATE LIMITED
BREN CORPORATION PRIVATE LIMITED has 7 registrations on RERA Karnataka, including BREN PARK CITY and BREN NORTHERN LIGHTS. Its filings declare 5 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if BREN ANANTA is delayed beyond 31 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of BREN ANANTA?
The registered promoter entity is BREN CORPORATION PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2012PTC064294 and GSTIN 29AAFCB6608K1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in BREN ANANTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at BREN ANANTA?
The professionals named in the filing: Architect: LAKSHMI CR; Engineer: Amarnath R Boraiah; Chartered Accountant: Amit Someshwar Padaki. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BREN ANANTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback