Home / Browse projects / Bengaluru Urban, Karnataka / Spectra Parijatha
Spectra Parijatha
By Spectra Constructions Private Limited
RG-KA-76927 · RERA PRM/KA/RERA/1251/446/PR/251023/006346 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Spectra Parijatha is a Residential/Group Housing project by Spectra Constructions Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/251023/006346 on 25 Oct 2023. Possession is promised by 31 Aug 2028. 81 of the 140 units on this registration are recorded sold or booked, and 6 of 18 construction stages are filed complete.
At a glance
Project
- NameSpectra Parijatha
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560066
- Pincode560066
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/251023/006346
- ReraGenie IDRG-KA-76927
Builder
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on25 Oct 2023
- Promised completion31 Aug 2028
- Revised completionNone
- Buildings3 building records
- Documents filed176 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 36 | 0 | 36 |
| Tower B | - | - | - | 52 | 0 | 52 |
| Tower C | - | - | - | 52 | 0 | 52 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 18 construction stages are filed complete. The stage furthest along is Weather Proof work(tile, at 95%.
Building: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 25% |
| Basic work of Water supply, Sanitary and Electrification | 85% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 75% |
| Railing and Grill fixing | 90% |
| Electrification, Water supply and Sanitary Finishing | 20% |
| Painting | 45% |
| Fire prevention and fire fighting fitting and fixture with network | 5% |
| Weather Proof work(tile,concrete) | 95% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 45% |
| Internal and External work including landscapes as per sanctioned drawings | 20% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 80% |
| Sewage and Drainage System | Yes | 70% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 10% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 5% |
| Solid waste management and disposal | Yes | 5% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 5% |
| Electricity supply transformer and substation | Yes | 5% |
| Storm water drains | Yes | 5% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 15% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 5% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 55% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 60% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 60% |
| Lifts | Yes | 25% |
| Corridor/Lobbies | Yes | 60% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 60% |
| Terrace | Yes | 75% |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 10% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership13
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| P. K. Raghothama Rao | - | - |
| R. Ramesh Rao | - | - |
| R. Rekha Rao | - | - |
| Ramya. S. | - | - |
| Biju Thoppil John | - | - |
| R. Mahalakshmi Rao | - | - |
| Pavan Shiralagi | - | - |
| Shilpa Shiralagi | - | - |
| Jyothi Rao | - | - |
| T. S. Amarnath | - | - |
| Gagan Shiralagi | - | - |
| Sneha Shiralagi | - | - |
| Gita R Rao | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 73.14 cr | Rs 4.26 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 10.00 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anup Naik |
| Engineer | Dhruvaraj Iyengar |
| Chartered Accountant | Saurabh Srivastava |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed176
As listed on the registration, under the names the promoter filed them with; the newest 80 of 176 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/251023/006346 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Q2 26-27 Parijatha.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 A Q2 26-27 Parijatha.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 E Q2 26-27 Parijatha.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: From 4 CA Q1 26 - 27 Parijatha.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 A Q1 26-27 Parijatha.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 E Q1 26-27 Parijatha.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 13 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Q4 25-26 Parijatha Comp.pdf | 11 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 A Q4 25-26 Parijatha.pdf | 11 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 E Q4 25-26 Parijatha.pdf | 11 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 11 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 11 Apr 2026 |
| Q4 2025-26 Fire and Safety | 11 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 11 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 11 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Q3 25-26 Parijatha.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 A Q3 25-26 Parijatha.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 E Q3 25-26 Parijatha.pdf | 13 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Jan 2026 |
| Q3 2025-26 Fire and Safety | 13 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 13 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 13 Jan 2026 |
| P&L - FY 2019-20File: E - PL - FY 2019-20.pdf | 17 Oct 2023 |
| P&L - FY 2020-21File: E - PL - FY 2020-21.pdf | 17 Oct 2023 |
| P&L - FY 2021-22File: E - PL - FY 2021-22.pdf | 17 Oct 2023 |
| Balance Sheet - FY 2019-20File: E - BS - FY 2019-20.pdf | 17 Oct 2023 |
| Balance Sheet - FY 2020-21File: E - BS - FY 2020-21.pdf | 17 Oct 2023 |
| Balance Sheet - FY 2021-22File: E - BS - FY 2021-22.pdf | 17 Oct 2023 |
| Source of FundsFile: E - Source of Funds.pdf | 17 Oct 2023 |
| Project DetailsFile: E - Project Details.pdf | 17 Oct 2023 |
| BBMP Plan Sanction - Site PlanFile: E - BBMP Plan Sanction - Site Plan.pdf | 17 Oct 2023 |
| BBMP Plan Sanction - Basement Floor PlanFile: E - BBMP Plan Sanction - Basement Floor Plan.pdf | 17 Oct 2023 |
| BBMP Plan Sanction - Ground Floor PlanFile: E - BBMP Plan Sanction - Ground Floor Plan.pdf | 17 Oct 2023 |
| BBMP Plan Sanction - First & Second Floor PlanFile: E - BBMP Plan Sanction - First & Second Floor Plan.pdf | 17 Oct 2023 |
| BBMP Plan Sanction - Typical & Terrace Floor PlanFile: E - BBMP Plan Sanction - Typical & Terrace Floor Plan.pdf | 17 Oct 2023 |
| BBMP Plan Sanction - Section & ElevationFile: E - BBMP Plan Sanction - Section & Elevation.pdf | 17 Oct 2023 |
| BBMP Plan Sanction - CompleteFile: E - BBMP Plan Sanction - Complete.pdf | 17 Oct 2023 |
| Carpet Area DetailsFile: E - Carpet Area Details.pdf | 17 Oct 2023 |
| Commencement CertificateFile: E - Commencement Certificate.pdf | 17 Oct 2023 |
| Engineer's CertificateFile: E - Certificate Engineer.pdf | 17 Oct 2023 |
| BWSSB NOC Cum Fee PaymentFile: E - BWSSB NOC Fee Payment.pdf | 17 Oct 2023 |
| BESCOM NOC Cum Fee PaymentFile: E - BESCOM NOC Fee Payment.pdf | 17 Oct 2023 |
| Stability CertificateFile: E - Structural Safety.pdf | 17 Oct 2023 |
| Proforma Agreement to SellFile: E - Proforma Agreement to Sell.pdf | 17 Oct 2023 |
| BorewellFile: E - Borewell Details.JPG | 17 Oct 2023 |
| FY 19-20 ConsolidatedFile: 1 E - FY 19-20 Consolidated.pdf | 12 Oct 2023 |
| FY 20-21 ConsolidatedFile: 2 E - FY 20-21 Consolidated.pdf | 12 Oct 2023 |
| FY 21-22 ConsolidatedFile: 3 E - FY 21-22 Consolidated.pdf | 12 Oct 2023 |
| RERA Bank Account DetailsFile: 4 E - RERA Bank Account Details.pdf | 12 Oct 2023 |
| BBMP Plan SanctionFile: 5 E - BBMP Plan Sanction.pdf | 12 Oct 2023 |
| Source of FundsFile: 6 E - Source of Funds.pdf | 12 Oct 2023 |
| CA CertificateFile: 7 E - CA Certificate.pdf | 12 Oct 2023 |
| Non-Litigation AffidavitFile: 8 E - Non-Litigation Affidavit.pdf | 12 Oct 2023 |
| Landowner DetailsFile: 9 E - Landowner Details.pdf | 12 Oct 2023 |
| Development AgreementFile: 10 E - Development Agreement.pdf | 12 Oct 2023 |
| Sy No 80-2 DeedsFile: 11 E - Sy No 80-2 Deeds.pdf | 12 Oct 2023 |
| Sy No 80-3 DeedsFile: 12 E - Sy No 80-3 Deeds.pdf | 12 Oct 2023 |
| Sy No 80-4 DeedsFile: 13 E - Sy No 80-4 Deeds.pdf | 12 Oct 2023 |
| Sy No 80-2 RTCFile: 14 E - Sy No 80-2 RTC.pdf | 12 Oct 2023 |
| Sy No 80-3 RTCFile: 15 E - Sy No 80-3 RTC.pdf | 12 Oct 2023 |
| Sy No 80-4 RTCFile: 16 E - Sy No 80-4 RTC.pdf | 12 Oct 2023 |
| Sy No 80-2 KhataFile: 17 E - Sy No 80-2 Khata.pdf | 12 Oct 2023 |
| Sy No 80-3 KhataFile: 18 E - Sy No 80-3 Khata.pdf | 12 Oct 2023 |
| Sy No 80-4 KhataFile: 19 E - Sy No 80-4 Khata.pdf | 12 Oct 2023 |
| Combined Property KhataFile: 20 E - Combined Property Khata.pdf | 12 Oct 2023 |
| Encumberance CertificateFile: 21 E - Encumberance Certificate.pdf | 12 Oct 2023 |
| Joint Affidavit Cum DeclarationFile: 22 E - Joint Affidavit Cum Declaration.pdf | 12 Oct 2023 |
| Guideline Value CertificateFile: 23 E - Guideline Value Certificate.pdf | 12 Oct 2023 |
| Project Details & BBMP Plan SanctionFile: 24 E - Project Details & BBMP Plan Sanction.pdf | 12 Oct 2023 |
| Carpet Area DetailsFile: 25 E - Carpet Area Details.pdf | 12 Oct 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Spectra Raywoods | No. 60 & 61, Millers Road, | Completed | - | No date filed |
| Spectra Raaya | No. 577/443, Siddapura, Varthur Hobli, | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Spectra Parijatha on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
SBR ONE RESIDENCE
SBR STRUCTURES
Cloud Forest
Shreno Limited
MAHINDRA BLOSSOM
MAHINDRA LIFESPACE DEVELOPERS LIMITED
SUMADHURA SOLACE PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
FOLIUM BY SUMADHURA PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA EDITION PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: Spectra Constructions Private Limited
Spectra Constructions Private Limited has 5 registrations on RERA Karnataka, including Spectra Mira and Spectra Reserve. Its filings declare 4 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Spectra Parijatha is delayed beyond 31 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Spectra Parijatha?
The registered promoter entity is Spectra Constructions Private Limited, a company as per the filing. Its CIN U45209KA1999PTC025826 and GSTIN 29AAFCS8564H1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Spectra Parijatha?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Spectra Parijatha?
The professionals named in the filing: Architect: Anup Naik; Engineer: Dhruvaraj Iyengar; Chartered Accountant: Saurabh Srivastava. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Spectra Parijatha?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback