Home / Browse projects / Bengaluru Rural, Karnataka / Sowparnika The Native

Registration approved No litigation declared Residential/Group Housing project

Sowparnika The Native

By SOWPARNIKA HOMES PRIVATE LIMITED

RG-KA-28570 · RERA PRM/KA/RERA/1250/304/PR/011026/008990 · Last updated on RERA Karnataka portal: 25 Sep 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2033Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 155 documents Report an error

Sowparnika The Native is a Residential/Group Housing project by SOWPARNIKA HOMES PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/011026/008990 on 1 Oct 2026. Possession is promised by 31 Aug 2033.

At a glance

Project

  • NameSowparnika The Native
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 562114
  • Pincode562114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/011026/008990
  • ReraGenie IDRG-KA-28570

Builder

  • NameSOWPARNIKA HOMES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45400KA2014PTC074654
  • GSTIN29AAUCS5844F1ZO
  • Authorized SignatoryMEENAKSHI RAMJI
  • DirectorMEENAKSHI RAMJI
  • DirectorsMEENAKSHI RAMJI, S SREENIVASAN
  • Project HeadN EASWARAN
  • Other registrations4 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredOct 2026PromisedAug 2033

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on1 Oct 2026
  • Promised completion31 Aug 2033
  • Revised completionNone
  • Buildings1 building record
  • Documents filed155 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1---111701117

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 25 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 25 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership11

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area35,737 sq m
Named landowners11
LandownerVillageDistrict
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--
SOWPARNIKA HOMES PRIVATE LIMITED--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 806.38 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 421.64 cr-
On-site expenditure-Site OverheadRs 296.98 cr-
Payment of taxesRs 51.53 cr-
Interest Payable to financial institutionsRs 36.23 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHYAMALA H. R.
EngineerVAIBHAV KUMAR J G
Chartered AccountantCHITTEPU YESHWANT REDDY

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed155

As listed on the registration, under the names the promoter filed them with; the newest 80 of 155 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/011026/008990 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
LOAN CLARIFICATIONFile: LOAN CLARIFICATION.pdf25 Sep 2026
NO SALES CLARIFICATIONFile: NO SALES DECLARATION.pdf25 Sep 2026
SECTION 3 AFFIDAVITFile: SECTION 3 AFFIDAVIT.pdf25 Sep 2026
FORM-3 ENGINEER CERTIFICATEFile: Form 3 - Engineer Certificate - Revised.pdf25 Sep 2026
COST ESTIMATIONFile: Sowparnika The Native - Construction Cost Break-up - Revised.pdf25 Sep 2026
STRUCTURAL STABILITY CERTIFICATEFile: Structural Stability Certificate.pdf25 Sep 2026
STRUCTURAL ENGINEER LICENCEFile: STRUCTURAL ENGINEER LICENCE.pdf25 Sep 2026
WATER NOC DECLARATION AFFIDAVITFile: WATER NOC DECLARATION AFFIDAVIT.pdf25 Sep 2026
WATER NOCFile: WATER NOC.pdf25 Sep 2026
BOREWELL DECLARATIONFile: SOURCE OF WATER BOREWELL DECLARATION.pdf25 Sep 2026
AMENITIES DECLARATIONFile: AMENITIES DECLARATION.pdf25 Sep 2026
STP DRAWINGFile: STP DRAWING.pdf25 Sep 2026
RTC, survey 143/1-
Mutation, survey 143/1-
Encumbrance Certificate, survey 143/1-
Conversion/Alienation Order, survey 143/1-
Sale/Title/Gift Deed, survey 143/1-
Khatha, survey 143/1-
RTC, survey 143/2-
Mutation, survey 143/2-
Encumbrance Certificate, survey 143/2-
Conversion/Alienation Order, survey 143/2-
Sale/Title/Gift Deed, survey 143/2-
Khatha, survey 143/2-
RTC, survey 143/3-
Mutation, survey 143/3-
Encumbrance Certificate, survey 143/3-
Conversion/Alienation Order, survey 143/3-
Sale/Title/Gift Deed, survey 143/3-
Khatha, survey 143/3-
RTC, survey 144/1-
Mutation, survey 144/1-
Encumbrance Certificate, survey 144/1-
Conversion/Alienation Order, survey 144/1-
Sale/Title/Gift Deed, survey 144/1-
Khatha, survey 144/1-
RTC, survey 144/2-
Mutation, survey 144/2-
Encumbrance Certificate, survey 144/2-
Conversion/Alienation Order, survey 144/2-
Sale/Title/Gift Deed, survey 144/2-
Khatha, survey 144/2-
RTC, survey 145/1-
Mutation, survey 145/1-
Encumbrance Certificate, survey 145/1-
Conversion/Alienation Order, survey 145/1-
Sale/Title/Gift Deed, survey 145/1-
Khatha, survey 145/1-
RTC, survey 145/2-
Mutation, survey 145/2-
Encumbrance Certificate, survey 145/2-
Conversion/Alienation Order, survey 145/2-
Sale/Title/Gift Deed, survey 145/2-
Khatha, survey 145/2-
RTC, survey 145/4-
Mutation, survey 145/4-
Encumbrance Certificate, survey 145/4-
Conversion/Alienation Order, survey 145/4-
Sale/Title/Gift Deed, survey 145/4-
Khatha, survey 145/4-
RTC, survey 145/5-
Mutation, survey 145/5-
Encumbrance Certificate, survey 145/5-
Conversion/Alienation Order, survey 145/5-
Sale/Title/Gift Deed, survey 145/5-
Khatha, survey 145/5-
RTC, survey 161/1-
Mutation, survey 161/1-
Encumbrance Certificate, survey 161/1-
Conversion/Alienation Order, survey 161/1-
Sale/Title/Gift Deed, survey 161/1-
Khatha, survey 161/1-
RTC, survey 161/2-
Mutation, survey 161/2-
Encumbrance Certificate, survey 161/2-
Conversion/Alienation Order, survey 161/2-
Sale/Title/Gift Deed, survey 161/2-
Khatha, survey 161/2-
Registration CertificateFile: SHPL - ROC Registration Certificate.pdf-
Memorandum of AssociationFile: SHPL - MOA.pdf-

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationStatusPromisedDelivered
SOWPARNIKA RHYTHM OF RAINSy. No. 10/4, Sy. No. 10/5, Sy. No. 10/6, Sy. No. 10/7, Sy. No. 11/17, Sy. No. 12/1, Sy. No. 34/3 and Sy. No. 34/4 at Samethanahalli Village, Anugondanahalli Hobli, Hosakote TalukOngoingJan 2032Not due yet
SOWPARNIKA EUPHORIA IN THE EASTSy. No. 86/1, Sy. No. 86/3, Sy. No. 86/4 of Doddagattiganabbe Village and Sy. No. 60/2 & Sy. No. 61/4 of Pujena Agrahara Village, Kasaba Hobli, Hosakote TalukOngoingMay 2031Not due yet
SOWPARNIKA INDRADHANUSH PHASE IINew Sy. No. 9/1 & 9/2 (Old Sy. No. 9) of Yelachanayakanapura Village and New Sy. No. 129/3 (Old Sy. No. 129/1) of Doddahullur Village, Kasaba Hobli, Hosakote TalukOngoingNov 2027Not due yet
SOWPARNIKA INDRADHANUSH PHASE INew Sy. No. 9/1 & 9/2 (Old Sy. No. 9) of Yelachanayakanapura Village and New Sy. No. 129/3 (Old Sy. No. 129/1) of Doddahullur Village, Kasaba Hobli, Hosakote TalukOngoingMay 2027Not due yet

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Sowparnika The Native on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmSowparnika The NativeOther 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: SOWPARNIKA HOMES PRIVATE LIMITED

SOWPARNIKA HOMES PRIVATE LIMITED has 5 registrations on RERA Karnataka, including Sowparnika The Native and SOWPARNIKA EUPHORIA IN THE EAST. Its filings declare 5 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Sowparnika The Native is delayed beyond 31 Aug 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sowparnika The Native?

The registered promoter entity is SOWPARNIKA HOMES PRIVATE LIMITED, a company as per the filing. Its CIN U45400KA2014PTC074654 and GSTIN 29AAUCS5844F1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sowparnika The Native?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Sowparnika The Native?

The professionals named in the filing: Architect: SHYAMALA H. R.; Engineer: VAIBHAV KUMAR J G; Chartered Accountant: CHITTEPU YESHWANT REDDY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sowparnika The Native?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sowparnika The Native. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sowparnika The Native to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.