Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Feb 2033Possession promisedno revision filed
0 of 17Construction stages donefurthest along: Earth work and other leveling..., 0%
272 of 721Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 386 documents Report an error

ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/080526/008638 on 8 May 2026. Possession is promised by 28 Feb 2033. 449 of the 721 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.

At a glance

Project

  • NameONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 562114
  • Pincode562114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/080526/008638
  • ReraGenie IDRG-KA-73830

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryPAVITHRA G KALMAT
  • Managing DirectorMr Jagadish Nangineni
  • DirectorMr JagadishNangineni
  • Project HeadMr Praveen N K
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredMay 2026PromisedFeb 2033

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 May 2026
  • Promised completion28 Feb 2033
  • Revised completionNone
  • Buildings3 building records
  • Documents filed386 files

Current status

62%449 of 721 units booked
1.7%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 09---1790179
Wing 10---2710271
Wing 11---2710271

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work0%
Foundation footing work0%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)Not applicable
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymNoNot applicable
ParksYes0%
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership29

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area33,122 sq m
Named landowners29
LandownerVillageDistrict
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 687.79 cr
Cost incurredRs 11.51 cr
Spent of the estimate1.67%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 542.93 crRs 5.29 cr
Payment of taxesRs 68.42 crRs 2.60 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 47.14 cr-
On-site expenditure-Consultants FeesRs 29.30 cr-
Principal sum and interest payable to financial institutions-Scheduled Banks-Rs 3.62 cr

Certifying professionals and partners4

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetha K Nair
EngineerMr. Ouseppachan C. Ambooken
EngineerBalakrishnan G
Chartered AccountantBalaji D

Litigation declared2

CaseCourtStatus
34/2022/2022OS No34/2022 filed by Lakshmamma against Chandramma & Others before the Senior Civil Judge and JMFC Hoskote for declaration of title over portion of property bearing SyNo174/1 to 174/5 of Ammanidoddakere Village-
283/2024/2024O.S No 283/2024 filed by Varalakshmi and Others against Ramesh and another before the Senior Civil Judge and JMFC Hoskote for Partition and declaration in respect of property bearing SyNo55/2 of Ammanidoddakere Village-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed386

As listed on the registration, under the names the promoter filed them with; the newest 80 of 386 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/080526/008638 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: One World Ph5.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: One Resident Ph5.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: One Resident Phase 5.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: One World Ph5.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: One World PH5.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: One Resident Phase 5.pdf13 Jul 2026
Q1 2026-27 Water supply and sewage board13 Jul 2026
Q1 2026-27 KPTCL- BESCOM13 Jul 2026
Sy No-54 MR NO-T30-2020-2021File: Sy No-54 MR NO-T30-2020-2021.pdf8 May 2026
Sobha-Syno174-2 4 6 & 8 OpinionFile: 1 Sobha-Syno174-2 4 6 & 8 Opinion.pdf8 May 2026
Sobha-Syno65-1 2 3 4 OpinionFile: 2 Sobha-Syno65-1 2 3 4 Opinion.pdf8 May 2026
Sobha-Syno62-1 2 3 4 & 5 OpinionFile: 3 Sobha-Syno62-1 2 3 4 & 5 Opinion.pdf8 May 2026
Sobha-Syno60-1 2 3 4 & 5 OpinionFile: 4 Sobha-Syno60-1 2 3 4 & 5 Opinion.pdf8 May 2026
Sobha-Syno59-1 2 3 OpinionFile: 5 Sobha-Syno59-1 2 3 Opinion.pdf8 May 2026
Sobha-Syno56-3 4 5 and 6 OpinionFile: 6 Sobha-Syno56-3 4 5 and 6 Opinion.pdf8 May 2026
Sobha-Syno35-1 2 3 OpinionFile: 7 Sobha-Syno35-1 2 3 Opinion.pdf8 May 2026
Sobha-Syno31-1 2 3 & 4 OpinionFile: 8 Sobha-Syno31-1 2 3 & 4 Opinion.pdf8 May 2026
Sobha-Syno21-1A 1B 2 3 and 4 OpinionFile: 9 Sobha-Syno21-1A 1B 2 3 and 4 Opinion.pdf8 May 2026
Sobha-Syno22-2 OpinionFile: 10 Sobha-Syno22-2 Opinion.pdf8 May 2026
Sobha-Syno26 OpinionFile: 11 Sobha-Syno26 Opinion.pdf8 May 2026
Sobha-Syno27 OpinionFile: 12 Sobha-Syno27 Opinion.pdf8 May 2026
Sobha-Syno32 OpinionFile: 13 Sobha-Syno32 Opinion.pdf8 May 2026
Sobha-Syno33-1-2 & 3 OpinionFile: 14 Sobha-Syno33-1-2 & 3 Opinion.pdf8 May 2026
Sobha-Syno36-1 & 2 OpinionFile: 15 Sobha-Syno36-1 & 2 Opinion.pdf8 May 2026
Sobha-Syno50 OpinionFile: 16 Sobha-Syno50 Opinion.pdf8 May 2026
Sobha-Syno52-1 OpinionFile: 17 Sobha-Syno52-1 Opinion.pdf8 May 2026
Sobha-Syno54-1-2 & 3 OpinionFile: 18 Sobha-Syno54-1-2 & 3 Opinion.pdf8 May 2026
Sobha-Syno57-3A-3B & 3C OpinionFile: 19 Sobha-Syno57-3A-3B & 3C Opinion.pdf8 May 2026
Sobha-Syno58 OpinionFile: 20 Sobha-Syno58 Opinion.pdf8 May 2026
Sobha-Syno61-1 & 3 OpinionFile: 21 Sobha-Syno61-1 & 3 Opinion.pdf8 May 2026
Sobha-Syno173-1 OpinionFile: 22 Sobha-Syno173-1 Opinion.pdf8 May 2026
Title Report Sobha-Syno66-1File: 1 Title Report Sobha-Syno66-1.pdf8 May 2026
Title Report Sobha-Syno66-2File: 2 Title Report Sobha-Syno66-2.pdf8 May 2026
Title Report Sobha-Syno66-3File: 3 Title Report Sobha-Syno66-3.pdf8 May 2026
Title Report Sobha-Syno66-4File: 4 Title Report Sobha-Syno66-4.pdf8 May 2026
Title Report Sobha-Syno67File: 5 Title Report Sobha-Syno67.pdf8 May 2026
Title Report Sobha-Syno68-1File: 6 Title Report Sobha-Syno68-1.pdf8 May 2026
Title Report Sobha-Syno69-1File: 7 Title Report Sobha-Syno69-1.pdf8 May 2026
Title Report Sobha-Syno61-2File: 8 Title Report Sobha-Syno61-2.pdf8 May 2026
Title Report Sobha-Syno63-1 & 2File: 9 Title Report Sobha-Syno63-1 & 2.pdf8 May 2026
Title Report Sobha-Syno64-1File: 10 Title Report Sobha-Syno64-1.pdf8 May 2026
Title Report Sobha-Syno55-2File: 11 Title Report Sobha-Syno55-2.pdf8 May 2026
Title Report Sobha-Syno55-3File: 12 Title Report Sobha-Syno55-3.pdf8 May 2026
Title Report Sobha-Syno55-4 & 10File: 13 Title Report Sobha-Syno55-4 & 10.pdf8 May 2026
Title Report Sobha-Syno55-5File: 14 Title Report Sobha-Syno55-5.pdf8 May 2026
Title Report Sobha-Syno55-6File: 15 Title Report Sobha-Syno55-6.pdf8 May 2026
Title Report Sobha-Syno55-7 & 11File: 16 Title Report Sobha-Syno55-7 & 11.pdf8 May 2026
Title Report Sobha-Syno55-9File: 17 Title Report Sobha-Syno55-9.pdf8 May 2026
Title Report Sobha-Syno56-2File: 18 Title Report Sobha-Syno56-2.pdf8 May 2026
Title Report Sobha-Syno57-1File: 19 Title Report Sobha-Syno57-1.pdf8 May 2026
Title Report Sobha-Syno57-2-4-5-6File: 20 Title Report Sobha-Syno57-2-4-5-6.pdf8 May 2026
Title Report Sobha-Syno34File: 21 Title Report Sobha-Syno34.pdf8 May 2026
Title Report Sobha-Syno51-1-2File: 22 Title Report Sobha-Syno51-1-2.pdf8 May 2026
Title Report Sobha-Syno20File: 23 Title Report Sobha-Syno20.pdf8 May 2026
Title Report Sobha-Syno175-1File: 24 Title Report Sobha-Syno175-1.pdf8 May 2026
Title Report Sobha-Syno177-1File: 25 Title Report Sobha-Syno177-1.pdf8 May 2026
Title Report Sobha-Syno177-2File: 26 Title Report Sobha-Syno177-2.pdf8 May 2026
Title Report Sobha-Syno177-3File: 27 Title Report Sobha-Syno177-3.pdf8 May 2026
Title Report Sobha-Syno187-1File: 28 Title Report Sobha-Syno187-1.pdf8 May 2026
Title Report Sobha-Syno171-1AFile: 29 Title Report Sobha-Syno171-1A.pdf8 May 2026
Title Report Sobha-Syno173-2File: 30 Title Report Sobha-Syno173-2.pdf8 May 2026
Title Report Sobha-Syno174-1File: 31 Title Report Sobha-Syno174-1.pdf8 May 2026
Clarification on Quarterly and Annual AuditsFile: 2 Clarification on Quarterly and Annual Audits.pdf8 May 2026
Title Report Sobha-Syno60-6 & 7File: 32 Title Report Sobha-Syno60-6 & 7.pdf8 May 2026
Title Report Sobha-Syno56-7File: 33 Title Report Sobha-Syno56-7.pdf8 May 2026
Area Demarcation Phase 5 Signed by ArchitectFile: 3 Area Demarcation Phase 5 Signed by Architect.pdf8 May 2026
Clarification on KSPCB NOCFile: 5 Clarification on KSPCB NOC.pdf8 May 2026
Wing 1 to 6_STP and SuTP layout and ReportFile: 6 Wing 1 to 6_STP and SuTP layout and Report.pdf8 May 2026
Wing 7 to 14_STP and SuTP layout and ReportFile: 7 Wing 7 to 14_STP and SuTP layout and Report.pdf8 May 2026
ATS ONE RESIDENCES AT SOBHA ONE WORLD PHASE 5 - WING 9, 10 and 11 UpdatedFile: 8 ATS ONE RESIDENCES AT SOBHA ONE WORLD PHASE 5 - WING 9, 10 and 11 Updated.pdf8 May 2026
Clarification on building license & Commencement certificateFile: 4 Clarification on building license & Commencement certificate.pdf8 May 2026
AREA BIFURCATION DETAILSFile: 9 AREA BIFURCATION DETAILS.pdf8 May 2026
Clarification on FARFile: 10 Clarification on FAR.pdf8 May 2026
Building Plan Sanction letterFile: 11 Building Plan Sanction letter.pdf8 May 2026
SITE PLANFile: 1 SITE PLAN.pdf8 May 2026
1A AREA STATEMENT WING 1-14File: 1A AREA STATEMENT WING 1-14.pdf8 May 2026

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 not delivered by the promised date41 under way, not due yet
ProjectLocationStatusPromisedDelivered
SOBHA Crystal Meadows Phase 5 Wing 16 to 22 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2035Not due yet
SOBHA Crystal Meadows Phase 4 Wing 23 to 28 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2033Not due yet
Sobha Hamptons -Townpark Phase 2 W1 to 3 LitigationPROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingJun 2033Not due yet
Sobha Madison Heights-Townpark Phase 2 W1 to 4 LitigationPROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingDec 2032Not due yet
SOBHA Crystal Meadows Phase 3 Wing 9 to 15 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2032Not due yet
Sobha Neopolis Phase 5 - W 5, 6 & 7 Litigation"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2031Not due yet
Sobha Neopolis Phase 4 - 3, 4, 8 & 9 Litigation"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2031Not due yet
SOBHA Ayana at Dream Acres Wing 60 to 71 LitigationSy No 50/2, 50/4, 50/5, 50/6, 51/1,51/2B1, 51/2B2, 51/3,51/4, 51/2C1,51/2C2, 53/1 and 53/2 of BalagereVillage , Ward No 149 , Varthur Hobli ,Bengaluru East , Bengaluru Urban,Karnataka - 560087OngoingDec 2031Not due yet
Sobha Hamptons -Townpark Phase 1 W4 to 6 LitigationPROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingJun 2031Not due yet
SOBHA Crystal Meadows Phase 2 Wing 7 and 8 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingJun 2031Not due yet
Sobha Magnus Litigation"E-KATHA NO.7863600645, SY.NO. 87/2, 87/3 SITUATED AT KOTHANUR VILLAGE , UTTARAHALLI HOBLI , Bengaluru South , Bengaluru Urban, Karnataka "OngoingMay 2031Not due yet
Sobha Altair"SOBHA ALTAIR, SY NO 56, HADOSIDDAPURA VILLAGE, CHIKKANNELLI VILLAGE VARTHUR HOBLI, BENGALURU EAST TALUK, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560035"OngoingMay 2031Not due yet
Sobha Neopolis Phase 2 - W 12 & 13 Litigation"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2030Not due yet
Sobha Madison Heights-Townpark Phase 1 W5 to 7 LitigationPROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingDec 2030Not due yet
Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 LitigationSurvey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034OngoingDec 2030Not due yet
Sobha Infinia Phase 2A Block 5 Wing 5 LitigationSurvey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034OngoingJun 2030Not due yet
Sobha Neopolis Phase 3 - W 1, 2, 10 & 11 Litigation"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2029Not due yet
SOBHA Crystal Meadows Phase 1 Wing 1 to 6 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2029Not due yet
Sobha Brooklyn Towers - Town Park Phase 4, W4 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Brooklyn Towers - Town Park Phase 3, W5 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Royal crest Litigation"PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE"OngoingDec 2028Not due yet
Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18&19 Litigation"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2028Not due yet
Sobha Dream Gardens Phase 5 - Wing 10 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Dream Gardens Phase 4 - Wing 1 and 2 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingSep 2028Not due yet
Sobha Brooklyn Towers - Town Park Phase 5, W3 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Victoria park phase 2 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Victoria park phase 1 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Sentosa Phase 4 Wing 1 and 2 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2027Not due yet
Sobha Oakshire Phase 3 Wing 5,6,11 and 12 LitigationProposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingDec 2027Not due yet
Sobha Dream Gardens Phase 3 - Wing 3 and 4 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 2, W2 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 1, W1 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingSep 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Sentosa Phase 3 Wing 3 and 4 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingJun 2027Not due yet
Sobha Oakshire Phase 2 Wing 3,4,9 and 10 LitigationProposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingJun 2027Not due yet
Sobha Oakshire Phase 1 Wing 1,2,7 and 8Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingDec 2026Not due yet
Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingDec 2026Not due yet

How this compares with Bengaluru Rural

62%of this project is bookeddistrict median 45%
20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10, on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmONE RESIDENCES AT SOBHA Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11 is delayed beyond 28 Feb 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11?

The professionals named in the filing: Architect: Geetha K Nair; Engineer: Mr. Ouseppachan C. Ambooken; Engineer: Balakrishnan G; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10, to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.