ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Rural, Karnataka / SOWPARNIKA EUPHORIA IN THE EAST

Registration approved No litigation declared Residential/Group Housing project

SOWPARNIKA EUPHORIA IN THE EAST

By SOWPARNIKA HOMES PRIVATE LIMITED

RG-KA-71901 · RERA PRM/KA/RERA/1250/304/PR/180724/006943 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
May 2031Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 97%
16 of 1,102Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 144 documents Report an error

SOWPARNIKA EUPHORIA IN THE EAST is a Residential/Group Housing project by SOWPARNIKA HOMES PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/180724/006943 on 18 Jul 2024. Possession is promised by 31 May 2031. 1,086 of the 1,102 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameSOWPARNIKA EUPHORIA IN THE EAST
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 562114
  • Pincode562114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/180724/006943
  • ReraGenie IDRG-KA-71901

Builder

  • NameSOWPARNIKA HOMES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45400KA2014PTC074654
  • GSTIN29AAUCS5844F1ZO
  • Authorized SignatoryMEENAKSHI RAMJI
  • DirectorMEENAKSHI RAMJI
  • DirectorsMEENAKSHI RAMJI, S SREENIVASAN
  • Project HeadSreenath R K
  • Other registrations4 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredJul 2024PromisedMay 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Jul 2024
  • Promised completion31 May 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed144 files

Current status

99%1086 of 1,102 units booked
63.3%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SOWPARNIKA EUPHORIA IN THE EAST---110201102

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 97%.

Building: 34% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work97%
Foundation footing work96%
Upto Plinth Level95%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)40%
Retaining wall (All types)40%
RCC or MS Framed structure68%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc20%
Basic work of Water supply, Sanitary and Electrification5%
Dadoing, Skirting, Flooring, Tiles work (All types)40%
Railing and Grill fixing38%
Electrification, Water supply and Sanitary Finishing5%
Painting25%
Fire prevention and fire fighting fitting and fixture with network5%
Weather Proof work(tile,concrete)2%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work30%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes10%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes5%
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes20%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes48%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes50%
LiftsYes50%
Corridor/LobbiesYes50%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes15%
BasementYes75%
TerraceYes35%
Outer WallYes10%
Open parking areasYes10%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area32,241 sq m
Named landowners1
LandownerVillageDistrict
SOWPARNIKA HOMES PRIVATE LIMITED--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 693.67 cr
Cost incurredRs 438.86 cr
Spent of the estimate63.27%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 373.25 crRs 253.82 cr
Sales Scheme CostRs 120.40 cr-
Sales and Marketing CostRs 81.27 cr-
Project Administration ChargesRs 74.65 crRs 158.37 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 44.10 crRs 26.67 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANIRAJ D
EngineerH P Yogesh
Chartered AccountantCA. Susanta Senapaty

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed144

As listed on the registration, under the names the promoter filed them with; the newest 80 of 144 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/180724/006943 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4, CA (QU) Euphoria in the East-FY 26-27 Q2_signed.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate EITIE Q2 2627.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Euphoria In the East II-Eng Certificate -Q2 2627.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Euphoria Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate EITIE Q1 2627.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Euphoria In the East II-Eng Certificate -Q1 2627.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4A CA Euphoria Merged.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate (QU) Euphoria In the East Q4.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Euphoria In the East -Q4.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: EUP.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Euphoria In the East Q3 compressed.pdf13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Euphoria In the East II Eng Certificate QU Q3.pdf13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Jan 2026
Q3 2025-26 KPTCL- BESCOM13 Jan 2026
Q3 2025-26 Fire and Safety13 Jan 2026
Q3 2025-26 Airport Authority of India13 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department13 Jan 2026
FORM 1File: Sowparnika EITE Form 1 CA Certificate.pdf25 Jun 2024
FORM-1File: Sowparnika EITE - Form 1 - CA Certificate Revised.pdf21 Jun 2024
CA CERTIFICATEFile: Sowparnika EITE - RERA CA Certificate - Revised.pdf21 Jun 2024
AUDITORS REPORT 20-21File: SHPL - Auditors Report - 20-21.pdf21 Jun 2024
AUDITORS REPORT 21-22File: SHPL - FY 21-22 - Audit Report.pdf21 Jun 2024
AUDITORS REPORT 22-23File: SHPL - FY 22-23 - Audit Report.pdf21 Jun 2024
BALANCE SHEET 20-21File: SHPL - BS - 20-21 R.pdf21 Jun 2024
BALANCE SHEET 21-22File: SHPL FY 21-22 - BS.pdf21 Jun 2024
BALANCE SHEET 22-23File: SHPL - FY 22-23 - BS R.pdf21 Jun 2024
CASH FLOW 20-21File: SHPL - Cash Flow - 20-21 R.pdf21 Jun 2024
CASHFLOW 21-22File: SHPL - FY 21-22 - Cash Flow.pdf21 Jun 2024
CASH FLOW 22-23File: SHPL - FY 22-23 - CFS R.pdf21 Jun 2024
DIRECTOR REPORT 20-21File: SHPL - Directors Report - 20-21.pdf21 Jun 2024
DIRECTOR REPORT 21-22File: SHPL - FY 21-22 - Directors Report.pdf21 Jun 2024
DIRECTOR REPORT 22-23File: SHPL - FY 22-23 - Directors Report.pdf21 Jun 2024
INCOME TAX RETURN 20-21File: SHPL - ITRV - 20-21.pdf21 Jun 2024
INCOME TAX RETURN 21-22File: SHPL - FY 21-22 - ITR.pdf21 Jun 2024
INCOME TAX RETURN 22-23File: SHPL - FY 22-23 - ITR V.pdf21 Jun 2024
PROFIT and LOSS 20-21File: SHPL - PL - 20-21 R.pdf21 Jun 2024
PROFIT and LOSS 21-22File: SHPL - FY 21-22 - PL.pdf21 Jun 2024
PROFIT and LOSS 22-23File: SHPL - FY 22-23 - PL R.pdf21 Jun 2024
ENCUMBERANCE CERTIFICATEFile: Sowparnika EITE - EC Combined 01-04-2008 to 07-06-2024.pdf21 Jun 2024
NON-LITIGATION AFFIDAVITFile: Sowparnika EITE - RERA Affidavit - No Litigations.pdf21 Jun 2024
APPROVED PLANFile: Sowparnika EITE - Plan Sanctions - Approved DP.pdf21 Jun 2024
PLAN SANCTION 1 OF 7 SITE PLANFile: Sowparnika EITE - Plan Sanctions - 1 of 7 - Site Plan.pdf21 Jun 2024
PLAN SANCTION 2 OF 7 SITE PLAN BASEMENT FLOORFile: Sowparnika EITE - Plan Sanctions - 2 of 7 - Basement Floor Drawing.pdf21 Jun 2024
PLAN SANCTION 3 OF 7 SITE PLAN GROUND FLOORFile: Sowparnika EITE - Plan Sanctions - 3 of 7 - Ground Floor Drawing.pdf21 Jun 2024
PLAN SANCTION 4 OF 7 SITE PLAN FIRST FLOORFile: Sowparnika EITE - Plan Sanctions - 4 of 7 - First Floor Drawing.pdf21 Jun 2024
PLAN SANCTION 5 OF 7 SITE PLAN TYPICAL FLOOR DRAWINGFile: Sowparnika EITE - Plan Sanctions - 5 of 7 - Typical Floor Drawing.pdf21 Jun 2024
PLAN SANCTION 6 OF 7 SITE PLAN TERRACE FLOOR DRAWINGFile: Sowparnika EITE - Plan Sanctions - 6 of 7 - Terrace Floor Drawing.pdf21 Jun 2024
PLAN SANCTION 7 OF 7 SITE PLAN ELEVATION & SECTIONFile: Sowparnika EITE - Plan Sanctions - 7 of 7 - Elevation & Section.pdf21 Jun 2024
STP DRAWINGFile: Sowparnika EITE - STP Drawing.pdf21 Jun 2024
COMMENCEMENT CERTIFICATEFile: Sowparnika EITE - Commencement Certificate - DP - STRR.pdf21 Jun 2024
CDP-DEMARCATION 1File: Sowparnika EITE - CDP - Demarcation I.pdf21 Jun 2024
CDP-DEMARCATION 2File: Sowparnika EITE - CDP - Demarcation II.jpg21 Jun 2024
CARPET AREA CALCULATION SHEETFile: Sowparnika EITE - Carpet Area Calculation Sheet.pdf21 Jun 2024
VILLAGE MAP LARGEFile: Sowparnika EITE - Village Map & Joint Survery Sketch - Large.pdf21 Jun 2024
ALLOTMENT LETTERFile: 19 Sowparnika EITE - Draft Allotment Letter.pdf21 Jun 2024
CONSTRUCTION COST BREAK UPFile: Sowparnika EITE - Construction Cost Break-Up.pdf21 Jun 2024
CHANGE OF LAND USEFile: Sowparnika EITE - Change of Land Use.pdf21 Jun 2024
ZR NALA BUFFERFile: Sowparnika EITE - ZR for Nala Buffer.jpg21 Jun 2024
ACKNOWLEDGEMNT PANCHAYATH LICENCEFile: Sowparnika EITE - Pananchayat License Applied - Ack.jpeg21 Jun 2024
ZR REGULATION FULLFile: MPA - Zonal Regulations - 2031 (Page No 163) (PDF Page No 47).pdf21 Jun 2024
Sowparnika EITE - Commencement Certificate - DP - STRRFile: 6 Sowparnika EITE - Commencement Certificate - DP - STRR.pdf21 Jun 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationStatusPromisedDelivered
SOWPARNIKA INDRADHANUSH PHASE IINew Sy. No. 9/1 & 9/2 (Old Sy. No. 9) of Yelachanayakanapura Village , New Sy. No. 129/3 (Old Sy. No. 129/1) of Doddahullur Village , Kasaba Hobli, Hosakote Taluk, Bangalore Rural District , HOSKOTE , Bengaluru Rural, Karnataka - 562114OngoingNov 2027Not due yet
SOWPARNIKA INDRADHANUSH PHASE INew Sy. No. 9/1 & 9/2 (Old Sy. No. 9) of Yelachanayakanapura Village , New Sy. No. 129/3 (Old Sy. No. 129/1) of Doddahullur Village , Kasaba Hobli, Hosakote Taluk, Bangalore Rural District , HOSKOTE , Bengaluru Rural, Karnataka - 562114OngoingMay 2027Not due yet

How this compares with Bengaluru Rural

99%of this project is bookeddistrict median 45%
20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep SOWPARNIKA EUPHORIA IN THE EAST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmSOWPARNIKA EUPHORIA IN TOther 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: SOWPARNIKA HOMES PRIVATE LIMITED

SOWPARNIKA HOMES PRIVATE LIMITED has 5 registrations on RERA Karnataka, including Sowparnika The Native and SOWPARNIKA EUPHORIA IN THE EAST. Its filings declare 5 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if SOWPARNIKA EUPHORIA IN THE EAST is delayed beyond 31 May 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SOWPARNIKA EUPHORIA IN THE EAST?

The registered promoter entity is SOWPARNIKA HOMES PRIVATE LIMITED, a company as per the filing. Its CIN U45400KA2014PTC074654 and GSTIN 29AAUCS5844F1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SOWPARNIKA EUPHORIA IN THE EAST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SOWPARNIKA EUPHORIA IN THE EAST?

The professionals named in the filing: Architect: MANIRAJ D; Engineer: H P Yogesh; Chartered Accountant: CA. Susanta Senapaty. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOWPARNIKA EUPHORIA IN THE EAST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOWPARNIKA EUPHORIA IN THE EAST. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOWPARNIKA EUPHORIA IN THE EAST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.