SOWPARNIKA EUPHORIA IN THE EAST
By SOWPARNIKA HOMES PRIVATE LIMITED
RG-KA-71901 · RERA PRM/KA/RERA/1250/304/PR/180724/006943 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SOWPARNIKA EUPHORIA IN THE EAST is a Residential/Group Housing project by SOWPARNIKA HOMES PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/180724/006943 on 18 Jul 2024. Possession is promised by 31 May 2031. 1,086 of the 1,102 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameSOWPARNIKA EUPHORIA IN THE EAST
- TypeResidential/Group Housing
- Location
- Hosakote
- Bengaluru Rural
- 562114
- Pincode562114
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1250/304/PR/180724/006943
- ReraGenie IDRG-KA-71901
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Jul 2024
- Promised completion31 May 2031
- Revised completionNone
- Buildings1 building record
- Documents filed144 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SOWPARNIKA EUPHORIA IN THE EAST | - | - | - | 1102 | 0 | 1102 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 97%.
Building: 34% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 97% |
| Foundation footing work | 96% |
| Upto Plinth Level | 95% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 40% |
| Retaining wall (All types) | 40% |
| RCC or MS Framed structure | 68% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 20% |
| Basic work of Water supply, Sanitary and Electrification | 5% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 40% |
| Railing and Grill fixing | 38% |
| Electrification, Water supply and Sanitary Finishing | 5% |
| Painting | 25% |
| Fire prevention and fire fighting fitting and fixture with network | 5% |
| Weather Proof work(tile,concrete) | 2% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 30% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 10% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 5% |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 20% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 48% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 50% |
| Lifts | Yes | 50% |
| Corridor/Lobbies | Yes | 50% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 15% |
| Basement | Yes | 75% |
| Terrace | Yes | 35% |
| Outer Wall | Yes | 10% |
| Open parking areas | Yes | 10% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SOWPARNIKA HOMES PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 373.25 cr | Rs 253.82 cr |
| Sales Scheme Cost | Rs 120.40 cr | - |
| Sales and Marketing Cost | Rs 81.27 cr | - |
| Project Administration Charges | Rs 74.65 cr | Rs 158.37 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 44.10 cr | Rs 26.67 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANIRAJ D |
| Engineer | H P Yogesh |
| Chartered Accountant | CA. Susanta Senapaty |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed144
As listed on the registration, under the names the promoter filed them with; the newest 80 of 144 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/180724/006943 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4, CA (QU) Euphoria in the East-FY 26-27 Q2_signed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate EITIE Q2 2627.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Euphoria In the East II-Eng Certificate -Q2 2627.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Euphoria Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate EITIE Q1 2627.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Euphoria In the East II-Eng Certificate -Q1 2627.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4A CA Euphoria Merged.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate (QU) Euphoria In the East Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Euphoria In the East -Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: EUP.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Euphoria In the East Q3 compressed.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Euphoria In the East II Eng Certificate QU Q3.pdf | 13 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Jan 2026 |
| Q3 2025-26 Fire and Safety | 13 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 13 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 13 Jan 2026 |
| FORM 1File: Sowparnika EITE Form 1 CA Certificate.pdf | 25 Jun 2024 |
| FORM-1File: Sowparnika EITE - Form 1 - CA Certificate Revised.pdf | 21 Jun 2024 |
| CA CERTIFICATEFile: Sowparnika EITE - RERA CA Certificate - Revised.pdf | 21 Jun 2024 |
| AUDITORS REPORT 20-21File: SHPL - Auditors Report - 20-21.pdf | 21 Jun 2024 |
| AUDITORS REPORT 21-22File: SHPL - FY 21-22 - Audit Report.pdf | 21 Jun 2024 |
| AUDITORS REPORT 22-23File: SHPL - FY 22-23 - Audit Report.pdf | 21 Jun 2024 |
| BALANCE SHEET 20-21File: SHPL - BS - 20-21 R.pdf | 21 Jun 2024 |
| BALANCE SHEET 21-22File: SHPL FY 21-22 - BS.pdf | 21 Jun 2024 |
| BALANCE SHEET 22-23File: SHPL - FY 22-23 - BS R.pdf | 21 Jun 2024 |
| CASH FLOW 20-21File: SHPL - Cash Flow - 20-21 R.pdf | 21 Jun 2024 |
| CASHFLOW 21-22File: SHPL - FY 21-22 - Cash Flow.pdf | 21 Jun 2024 |
| CASH FLOW 22-23File: SHPL - FY 22-23 - CFS R.pdf | 21 Jun 2024 |
| DIRECTOR REPORT 20-21File: SHPL - Directors Report - 20-21.pdf | 21 Jun 2024 |
| DIRECTOR REPORT 21-22File: SHPL - FY 21-22 - Directors Report.pdf | 21 Jun 2024 |
| DIRECTOR REPORT 22-23File: SHPL - FY 22-23 - Directors Report.pdf | 21 Jun 2024 |
| INCOME TAX RETURN 20-21File: SHPL - ITRV - 20-21.pdf | 21 Jun 2024 |
| INCOME TAX RETURN 21-22File: SHPL - FY 21-22 - ITR.pdf | 21 Jun 2024 |
| INCOME TAX RETURN 22-23File: SHPL - FY 22-23 - ITR V.pdf | 21 Jun 2024 |
| PROFIT and LOSS 20-21File: SHPL - PL - 20-21 R.pdf | 21 Jun 2024 |
| PROFIT and LOSS 21-22File: SHPL - FY 21-22 - PL.pdf | 21 Jun 2024 |
| PROFIT and LOSS 22-23File: SHPL - FY 22-23 - PL R.pdf | 21 Jun 2024 |
| ENCUMBERANCE CERTIFICATEFile: Sowparnika EITE - EC Combined 01-04-2008 to 07-06-2024.pdf | 21 Jun 2024 |
| NON-LITIGATION AFFIDAVITFile: Sowparnika EITE - RERA Affidavit - No Litigations.pdf | 21 Jun 2024 |
| APPROVED PLANFile: Sowparnika EITE - Plan Sanctions - Approved DP.pdf | 21 Jun 2024 |
| PLAN SANCTION 1 OF 7 SITE PLANFile: Sowparnika EITE - Plan Sanctions - 1 of 7 - Site Plan.pdf | 21 Jun 2024 |
| PLAN SANCTION 2 OF 7 SITE PLAN BASEMENT FLOORFile: Sowparnika EITE - Plan Sanctions - 2 of 7 - Basement Floor Drawing.pdf | 21 Jun 2024 |
| PLAN SANCTION 3 OF 7 SITE PLAN GROUND FLOORFile: Sowparnika EITE - Plan Sanctions - 3 of 7 - Ground Floor Drawing.pdf | 21 Jun 2024 |
| PLAN SANCTION 4 OF 7 SITE PLAN FIRST FLOORFile: Sowparnika EITE - Plan Sanctions - 4 of 7 - First Floor Drawing.pdf | 21 Jun 2024 |
| PLAN SANCTION 5 OF 7 SITE PLAN TYPICAL FLOOR DRAWINGFile: Sowparnika EITE - Plan Sanctions - 5 of 7 - Typical Floor Drawing.pdf | 21 Jun 2024 |
| PLAN SANCTION 6 OF 7 SITE PLAN TERRACE FLOOR DRAWINGFile: Sowparnika EITE - Plan Sanctions - 6 of 7 - Terrace Floor Drawing.pdf | 21 Jun 2024 |
| PLAN SANCTION 7 OF 7 SITE PLAN ELEVATION & SECTIONFile: Sowparnika EITE - Plan Sanctions - 7 of 7 - Elevation & Section.pdf | 21 Jun 2024 |
| STP DRAWINGFile: Sowparnika EITE - STP Drawing.pdf | 21 Jun 2024 |
| COMMENCEMENT CERTIFICATEFile: Sowparnika EITE - Commencement Certificate - DP - STRR.pdf | 21 Jun 2024 |
| CDP-DEMARCATION 1File: Sowparnika EITE - CDP - Demarcation I.pdf | 21 Jun 2024 |
| CDP-DEMARCATION 2File: Sowparnika EITE - CDP - Demarcation II.jpg | 21 Jun 2024 |
| CARPET AREA CALCULATION SHEETFile: Sowparnika EITE - Carpet Area Calculation Sheet.pdf | 21 Jun 2024 |
| VILLAGE MAP LARGEFile: Sowparnika EITE - Village Map & Joint Survery Sketch - Large.pdf | 21 Jun 2024 |
| ALLOTMENT LETTERFile: 19 Sowparnika EITE - Draft Allotment Letter.pdf | 21 Jun 2024 |
| CONSTRUCTION COST BREAK UPFile: Sowparnika EITE - Construction Cost Break-Up.pdf | 21 Jun 2024 |
| CHANGE OF LAND USEFile: Sowparnika EITE - Change of Land Use.pdf | 21 Jun 2024 |
| ZR NALA BUFFERFile: Sowparnika EITE - ZR for Nala Buffer.jpg | 21 Jun 2024 |
| ACKNOWLEDGEMNT PANCHAYATH LICENCEFile: Sowparnika EITE - Pananchayat License Applied - Ack.jpeg | 21 Jun 2024 |
| ZR REGULATION FULLFile: MPA - Zonal Regulations - 2031 (Page No 163) (PDF Page No 47).pdf | 21 Jun 2024 |
| Sowparnika EITE - Commencement Certificate - DP - STRRFile: 6 Sowparnika EITE - Commencement Certificate - DP - STRR.pdf | 21 Jun 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SOWPARNIKA INDRADHANUSH PHASE II | New Sy. No. 9/1 & 9/2 (Old Sy. No. 9) of Yelachanayakanapura Village , New Sy. No. 129/3 (Old Sy. No. 129/1) of Doddahullur Village , Kasaba Hobli, Hosakote Taluk, Bangalore Rural District , HOSKOTE , Bengaluru Rural, Karnataka - 562114 | Ongoing | Nov 2027 | Not due yet |
| SOWPARNIKA INDRADHANUSH PHASE I | New Sy. No. 9/1 & 9/2 (Old Sy. No. 9) of Yelachanayakanapura Village , New Sy. No. 129/3 (Old Sy. No. 129/1) of Doddahullur Village , Kasaba Hobli, Hosakote Taluk, Bangalore Rural District , HOSKOTE , Bengaluru Rural, Karnataka - 562114 | Ongoing | May 2027 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.
Keep SOWPARNIKA EUPHORIA IN THE EAST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural650+ in Bengaluru Rural
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
Provident Botanico
Provident Housing Limited
GODREJ PARKSHIRE
Godrej Properties Limited
Sowparnika The Native
SOWPARNIKA HOMES PRIVATE LIMITED
Brillio and Commercial at Brigade Valencia
Brigade Enterprises Ltd
Sowparnika Whispering Petals
SOWPARNIKA GREEN MEADOWS PRIVATE LIMITED
ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11
SOBHA LIMITED
See every Bengaluru Rural project, with the district possession charts
Builder: SOWPARNIKA HOMES PRIVATE LIMITED
SOWPARNIKA HOMES PRIVATE LIMITED has 5 registrations on RERA Karnataka, including Sowparnika The Native and SOWPARNIKA EUPHORIA IN THE EAST. Its filings declare 5 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if SOWPARNIKA EUPHORIA IN THE EAST is delayed beyond 31 May 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SOWPARNIKA EUPHORIA IN THE EAST?
The registered promoter entity is SOWPARNIKA HOMES PRIVATE LIMITED, a company as per the filing. Its CIN U45400KA2014PTC074654 and GSTIN 29AAUCS5844F1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SOWPARNIKA EUPHORIA IN THE EAST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SOWPARNIKA EUPHORIA IN THE EAST?
The professionals named in the filing: Architect: MANIRAJ D; Engineer: H P Yogesh; Chartered Accountant: CA. Susanta Senapaty. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SOWPARNIKA EUPHORIA IN THE EAST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback