Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Madison Heights-Townpark Phase 1 W5 to 7
Sobha Madison Heights-Townpark Phase 1 W5 to 7
RG-KA-80561 · RERA PRM/KA/RERA/1251/308/PR/230125/007420 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 3 complaints at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
Sobha Madison Heights-Townpark Phase 1 W5 to 7 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/230125/007420 on 23 Jan 2025. Possession is promised by 31 Dec 2030. 348 of the 480 units on this registration are recorded sold or booked, and 3 of 17 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameSobha Madison Heights-Townpark Phase 1 W5 to 7
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 562107
- Pincode562107
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/230125/007420
- ReraGenie IDRG-KA-80561
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- GSTIN29AABCS7723E1ZB
- Authorized SignatoryPavithra G Kalmath
- Managing DirectorMr Jagadish Nangineni
- DirectorMr Jagadish Nangineni
- Project HeadMr. Yatheesha
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on23 Jan 2025
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings3 building records
- Documents filed393 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING -5 | - | - | - | 160 | 0 | 160 |
| WING -6 | - | - | - | 160 | 0 | 160 |
| WING -7 | - | - | - | 160 | 0 | 160 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 17 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 12%.
Building: 19% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 12% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 12% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership33
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| A G Hemanth Kumar | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Sheela kulakarni | - | - |
| Nambiar Builders Pvt ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| B Ramaiah | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Home Land Resorts P ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Abhinandan T S | - | - |
| A G Hemanth Kumar | - | - |
| A G Hemanth Kumar | - | - |
| Abhinandan T S | - | - |
| Abhinandan T S | - | - |
| A G Hemanth Kumar | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Amit Ompraksh Poojari | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Urban Spaces Projects P. Ltd | - | - |
| Abhinandan T S | - | - |
| Urban Spaces Projects P. Ltd | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 256.75 cr | Rs 72.92 cr |
| Payment of taxes | Rs 34.21 cr | Rs 7.51 cr |
| On-site expenditure-Consultants Fees | Rs 32.20 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 19.05 cr | - |
| On-site expenditure-Site Overhead | - | Rs 2.72 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | - | Rs 6.95 cr |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arun Kumar |
| Engineer | Balakrishnan G |
| Engineer | OUSEPPACHAN.C.AMBOOKEN |
| Chartered Accountant | Balaji D |
Complaints filed with RERA Karnataka3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00902/2025 | - | SOBHA LIMITED | 03/07/2025 |
| 01346/2025 | - | SOBHA LIMITED | 06/11/2025 |
| 00103/2026 | - | SOBHA LIMITED | 10/02/2026 |
Documents filed393
As listed on the registration, under the names the promoter filed them with; the newest 80 of 393 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/230125/007420 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Madison Heights PH 1 C.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Madison Ph1.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Madison Ph1.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Madison Heights PH 1.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Madison Heights PH1.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Madison Heights Phase 1.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Madison Heights PH 1.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Madison Phase 1.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Madison Phase 1.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q4 2025-26 Fire and Safety | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Madison Heights PH 1 C.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Madision PH1.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Madison PH 1.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Q3 2025-26 Fire and Safety | 12 Jan 2026 |
| Amalgamated Khata-Form9File: 1 Amalgamated Khata-Form9.pdf | 22 Jan 2025 |
| Discharge Deed sy no 74-6 Doc 5632-2015-16File: 2 Discharge Deed sy no 74-6 Doc 5632-2015-16.pdf | 22 Jan 2025 |
| Discharge Deed Sy No 54-1 Doc 1783-2015-16File: 3 Discharge Deed Sy No 54-1 Doc 1783-2015-16.pdf | 22 Jan 2025 |
| Conversion Order 56-6 2-24 GFile: 4 Conversion Order 56-6 2-24 G.pdf | 22 Jan 2025 |
| Conversion Order 56-6 01-7 GFile: 5 Conversion Order 56-6 01-7 G.pdf | 22 Jan 2025 |
| SY NO 54-3 & 54-5 NOC FROM CANARA BANK001File: 6 SY NO 54-3 & 54-5 NOC FROM CANARA BANK001.pdf | 22 Jan 2025 |
| Deed of Discharge - piramal doc no 1541-2021-22File: 7 Deed of Discharge - piramal doc no 1541-2021-22.pdf | 22 Jan 2025 |
| Discharge Deed dt 15-10-2020, Doc 3283-20-21File: 8 Discharge Deed dt 15-10-2020, Doc 3283-20-21.pdf | 22 Jan 2025 |
| Yadavanahalli ADLR SketchFile: 1 Yadavanahalli ADLR Sketch.pdf | 22 Jan 2025 |
| Fire NOC fee paid receipt with declarationFile: 2 Fire NOC fee paid receipt with declaration.pdf | 22 Jan 2025 |
| Engineers License 160125File: 3 Engineers License 160125.pdf | 22 Jan 2025 |
| Madison Phase 1 W5-7 Land cost calculationFile: 4 Madison Phase 1 W5-7 Land cost calculation.pdf | 22 Jan 2025 |
| Madison Phase 1 W5-7 Sec 3(1) AffidavitFile: 5 Madison Phase 1 W5-7 Sec 3(1) Affidavit.pdf | 22 Jan 2025 |
| Madison Phase 1 W5-7 DemarcationFile: 6 Madison Phase 1 W5-7 Demarcation.pdf | 22 Jan 2025 |
| KSPCB NOC fee paid receipt with declaration Madison P1 W5-7File: 8 KSPCB NOC fee paid receipt with declaration Madison P1 W5-7.pdf | 22 Jan 2025 |
| Syno 56-3-CLU dt 19112019File: 1 Syno 56-3-CLU dt 19112019.pdf | 22 Jan 2025 |
| SyNo 74-7 148-2 74-6 74-11-CLU dt 19112019File: 2 SyNo 74-7 148-2 74-6 74-11-CLU dt 19112019.pdf | 22 Jan 2025 |
| SyNo 148-1 74-6 CLU dt 19112019 2File: 3 SyNo 148-1 74-6 CLU dt 19112019 2.pdf | 22 Jan 2025 |
| Syno 52-2-CLU dt 19112019File: 4 Syno 52-2-CLU dt 19112019.pdf | 22 Jan 2025 |
| Syno 54-1-CLU dt 19112019File: 5 Syno 54-1-CLU dt 19112019.pdf | 22 Jan 2025 |
| Syno 54-3-CLU dt 19112019File: 6 Syno 54-3-CLU dt 19112019.pdf | 22 Jan 2025 |
| Syno 54-4-CLU dt 19112019File: 7 Syno 54-4-CLU dt 19112019.pdf | 22 Jan 2025 |
| Syno 54-5-CLU dt 19112019File: 8 Syno 54-5-CLU dt 19112019.pdf | 22 Jan 2025 |
| Syno 56-4 CLU dt 19112019File: 9 Syno 56-4 CLU dt 19112019.pdf | 22 Jan 2025 |
| Hamptons and Madison Commencement LetterFile: Hamptons and Madison Commencement Letter.pdf | 22 Jan 2025 |
| Clarification on Building LicenseFile: Clarification on Building License.pdf | 22 Jan 2025 |
| Development Plan Sanction LetterFile: Development Plan Sanction Letter.pdf | 22 Jan 2025 |
| Development Plan ApprovedFile: Development Plan Approved.pdf | 22 Jan 2025 |
| SITE PLANFile: 1 SITE PLAN.pdf | 22 Jan 2025 |
| BASEMENT 2 FLOOR PLAN BUILDING 1File: 2 BASEMENT 2 FLOOR PLAN BUILDING 1.pdf | 22 Jan 2025 |
| BASEMENT 1 FLOOR PLAN BUILDING 1File: 3 BASEMENT 1 FLOOR PLAN BUILDING 1.pdf | 22 Jan 2025 |
| GROUND FLOOR PLAN BUILDING 1File: 4 GROUND FLOOR PLAN BUILDING 1.pdf | 22 Jan 2025 |
| 4A GROUND FLOOR PLAN 2 BUILDING 1File: 4A GROUND FLOOR PLAN 2 BUILDING 1.pdf | 22 Jan 2025 |
| FIRST FLOOR PLAN BUILDING 1File: 5 FIRST FLOOR PLAN BUILDING 1.pdf | 22 Jan 2025 |
| TYPICAL FLOOR PLAN BUILDING 1File: 6 TYPICAL FLOOR PLAN BUILDING 1.pdf | 22 Jan 2025 |
| 20TH,30TH & 40TH FLOOR PLAN BUILDING 1File: 7 20TH,30TH & 40TH FLOOR PLAN BUILDING 1.pdf | 22 Jan 2025 |
| TERRACE FLOOR PLAN BUILDING 1File: 8 TERRACE FLOOR PLAN BUILDING 1.pdf | 22 Jan 2025 |
| ELEVATION BUIDLING 1File: 9 ELEVATION BUIDLING 1.pdf | 22 Jan 2025 |
| SECTIONAL ELEVATION BUILDING 1File: 10 SECTIONAL ELEVATION BUILDING 1.pdf | 22 Jan 2025 |
| 10A SECTIONAL ELEVATION 2 BUILDING 1File: 10A SECTIONAL ELEVATION 2 BUILDING 1.pdf | 22 Jan 2025 |
| BASEMENT 2 FLOOR PLAN BUILDING 2File: 11 BASEMENT 2 FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| BASEMENT 1 FLOOR PLAN BUILDING 2File: 12 BASEMENT 1 FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| GROUND FLOOR PLAN BUILDING 2File: 13 GROUND FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| FIRST FLOOR PLAN BUILDING 2File: 14 FIRST FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| SECOND FLOOR PLAN BUILDING 2File: 15 SECOND FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| THIRD FLOOR PLAN BUILDING 2File: 16 THIRD FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| FOURTH FLOOR PLAN BUILDING 2File: 17 FOURTH FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| FIFTH FLOOR PLAN BUILDING 2File: 18 FIFTH FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| SIXTH FLOOR PLAN BUILDING 2File: 19 SIXTH FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| TYPICAL FLOOR PLAN BUILDING 2File: 20 TYPICAL FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| 20TH,30TH & 40TH FLOOR PLAN BUILDING 2File: 21 20TH,30TH & 40TH FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
| TERRACE FLOOR PLAN BUILDING 2File: 22 TERRACE FLOOR PLAN BUILDING 2.pdf | 22 Jan 2025 |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SOBHA Crystal Meadows Phase 5 Wing 16 to 22 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Dec 2035 | Not due yet |
| SOBHA Crystal Meadows Phase 4 Wing 23 to 28 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Dec 2033 | Not due yet |
| SOBHA Crystal Meadows Phase 3 Wing 9 to 15 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Dec 2032 | Not due yet |
| Sobha Neopolis Phase 5 - W 5, 6 & 7 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2031 | Not due yet |
| Sobha Neopolis Phase 4 - 3, 4, 8 & 9 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2031 | Not due yet |
| SOBHA Ayana at Dream Acres Wing 60 to 71 | Sy No 50/2, 50/4, 50/5, 50/6, 51/1,51/2B1, 51/2B2, 51/3,51/4, 51/2C1,51/2C2, 53/1 and 53/2 of BalagereVillage , Ward No 149 , Varthur Hobli ,Bengaluru East , Bengaluru Urban,Karnataka - 560087 | Ongoing | Dec 2031 | Not due yet |
| SOBHA Crystal Meadows Phase 2 Wing 7 and 8 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Jun 2031 | Not due yet |
| Sobha Neopolis Phase 2 - W 12 & 13 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2030 | Not due yet |
| Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 | Survey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034 | Ongoing | Dec 2030 | Not due yet |
| Sobha Infinia Phase 2A Block 5 Wing 5 | Survey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034 | Ongoing | Jun 2030 | Not due yet |
| Sobha Neopolis Phase 3 - W 1, 2, 10 & 11 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2029 | Not due yet |
| SOBHA Crystal Meadows Phase 1 Wing 1 to 6 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Dec 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Royal crest | "PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE" | Ongoing | Dec 2028 | Not due yet |
| Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18&19 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 5 - Wing 10 | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 4 - Wing 1 and 2 | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Sep 2028 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2028 | Not due yet |
| Sobha Windsor Phase 4 Wing 9, 10 and 11 | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Mar 2028 | Not due yet |
| Sobha Victoria park phase 2 | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Victoria park phase 1 | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Sentosa Phase 4 Wing 1 and 2 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2027 | Not due yet |
| Sobha Oakshire Phase 3 Wing 5,6,11 and 12 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Dec 2027 | Not due yet |
| Sobha Dream Gardens Phase 3 - Wing 3 and 4 | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 2, W2 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Windsor Phase 3 Wing 6, 7 and 8 | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Sep 2027 | Not due yet |
| Sobha City Athena | Property No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, Bengaluru | Ongoing | Sep 2027 | Not due yet |
| Sobha Sentosa Phase 3 Wing 3 and 4 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2027 | Not due yet |
| Sobha Oakshire Phase 2 Wing 3,4,9 and 10 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Jun 2027 | Not due yet |
| Sobha Sentosa Phase 2 Wing 5 and 6 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2026 | Not due yet |
| Sobha Oakshire Phase 1 Wing 1,2,7 and 8 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Dec 2026 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Dec 2026 | Not due yet |
| Sobha Galera | "SOBHA GALERA, SURVEY NO 45/4 OF HUSKUR VILLAGE, BIDARAHALLI HOBLI, BANGLAORE EAST TALUK SURVEY NO.116 OF AMANIDODDAKERE VILLAGE, KASABA HOBLI, HOSAKOTE TALUK, BANGALORE , BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560049" | Ongoing | Dec 2026 | Not due yet |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 | Balagere, Bangalore | Ongoing | Sep 2026 | Not delivered |
| Sobha Sentosa Phase 1 Wing 7 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 8 - Wing 15 | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sobha Madison Heights-Townpark Phase 1 W5 to on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
SHRIRAM 107SOUTHEAST - PHASE 3
Shriprop Living Space Private Limited
RAJ HIGH GARDENS
SNN Properties LLP
Sobha Madison Heights-Townpark Phase 2 W1 to 4
SOBHA LIMITED
DS MAX SKY SAMPADHA
DS MAX PROPERTIES PRIVATE LIMITED
Sobha Hamptons -Townpark Phase 1 W4 to 6
SOBHA LIMITED
Sobha Hamptons -Townpark Phase 2 W1 to 3
SOBHA LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sobha Madison Heights-Townpark Phase 1 W5 to 7 is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sobha Madison Heights-Townpark Phase 1 W5 to 7?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sobha Madison Heights-Townpark Phase 1 W5 to 7?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sobha Madison Heights-Townpark Phase 1 W5 to 7?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Sobha Madison Heights-Townpark Phase 1 W5 to 7?
The professionals named in the filing: Architect: Arun Kumar; Engineer: Balakrishnan G; Engineer: OUSEPPACHAN.C.AMBOOKEN; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sobha Madison Heights-Townpark Phase 1 W5 to 7?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback