Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Galera
Sobha Galera
RG-KA-50350 · RERA PRM/KA/RERA/1251/446/PR/050123/005601 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
Sobha Galera is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/050123/005601 on 5 Jan 2023. Possession is promised by 31 Dec 2026. 40 of the 40 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSobha Galera
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560049
- Pincode560049
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/050123/005601
- ReraGenie IDRG-KA-50350
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- GSTIN29AABCS7723E1ZB
- Authorized SignatoryMr. Suresh Ganiga
- Managing DirectorMr Jagadish Nangineni
- DirectorsRavi P N C Menon, Mr Jagadish Nangineni
- Project HeadMr. Nandeesh raju
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 Jan 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed120 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing 1 | - | - | - | 19 | 0 | 19 |
| Wing 2 | - | - | - | 21 | 0 | 21 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 18 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 47% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 59.13 cr | Rs 85.28 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 11.50 cr | Rs 11.50 cr |
| Payment of taxes | Rs 8.85 cr | Rs 7.55 cr |
| On-site expenditure-Site Overhead | Rs 4.14 cr | Rs 4.34 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Geetha K Nair |
| Engineer | Mr. Durga Prasad KVR |
| Chartered Accountant | Balaji D |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00882/2024 | - | SOBHA LIMITED | 12/09/2024 |
Documents filed120
As listed on the registration, under the names the promoter filed them with; the newest 80 of 120 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/050123/005601 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Galera C.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Galera.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Galera.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 13 Oct 2026 |
| Q2 2026-27 Registration documentFile: Galera DOD Compressed.pdf | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Galera.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Galera.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Galera.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Galera.pdf | 10 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Galera.pdf | 10 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Galera.pdf | 10 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 10 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 10 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Galera C.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Galera.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Galera.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Bank account passbook attachedFile: 777705230998 RERA acct.pdf | 28 Dec 2022 |
| BESCOM NOC and payment receiptFile: BESCOM NOC and payment receipt.pdf | 28 Dec 2022 |
| Bank account detailsFile: 1 Bank account details.pdf | 3 Dec 2022 |
| Upload previous project annual audit form-07File: 2 Annual audit form 07.pdf | 3 Dec 2022 |
| need khata for syno 116File: 3 Survey no 116 note.pdf | 3 Dec 2022 |
| need layout plan showing syno 116File: 4 CLUBHOUSE SITE SUPERIMPOSED ON SURVEY SKETCH.pdf | 3 Dec 2022 |
| need title deed to conversion land owner for all synoFile: Title deed to conversion land owner for all syno.pdf | 3 Dec 2022 |
| Common Area Allotted To AssociationFile: 7 Common area.pdf | 3 Dec 2022 |
| BESCOM NOCFile: BESCOM NOC NA.pdf | 3 Dec 2022 |
| upload the brief estimated cost of constructionFile: Form 3 Engineer certificate.pdf | 3 Dec 2022 |
| Revised Proforma of Agreement for SaleFile: Proforma of ATS Sobha Galera final.pdf | 3 Dec 2022 |
| Revised brochureFile: 12 Galera RERA brochure final.pdf | 3 Dec 2022 |
| Galera Amanidoddakere site merged VillagemapFile: Galera Amanidoddakere site merged Villagemap.jpg | 3 Dec 2022 |
| Galera CLUBHOUSE site merged CDP MapFile: GALERA phase wise siteplan 291122.pdf | 3 Dec 2022 |
| GALERA phase wise site planFile: Galera phasewise siteplan for club house 291122.pdf | 3 Dec 2022 |
| RTC, survey 45/4 | - |
| Mutation, survey 45/4 | - |
| Encumbrance Certificate, survey 45/4 | - |
| Conversion/Alienation Order, survey 45/4 | - |
| Sale/Title/Gift Deed, survey 45/4 | - |
| Khatha, survey 45/4 | - |
| RTC, survey 116 | - |
| Mutation, survey 116 | - |
| Encumbrance Certificate, survey 116 | - |
| Conversion/Alienation Order, survey 116 | - |
| Sale/Title/Gift Deed, survey 116 | - |
| Khatha, survey 116 | - |
| Registration CertificateFile: Registration Certificate of SL.pdf | - |
| Organization StructureFile: Organisation Structure.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA c.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Arc Cert.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 EC.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidavit cum Declaration.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA c.pdf | - |
| Balance Sheet 2021 - 2022File: Balance sheet Mar 2022.pdf | - |
| Balance Sheet 2020 - 2021File: Balance sheet Mar 2021.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet Mar 2020.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Profit Loss Statement Mar 2022.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Profit Loss Statement Mar 2021.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Profit Loss Statement Mar 2020.pdf | - |
| Director's Report 2021 - 2022File: DR 2021 22.pdf | - |
| Director's Report 2020 - 2021File: DR 2020 21.pdf | - |
| Director's Report 2019 - 2020File: DR 2019 20.pdf | - |
| Cash Flow Statement 2021 - 2022File: Cash Flow Mar 2022.pdf | - |
| Cash Flow Statement 2020 - 2021File: Cash Flow Mar 2021.pdf | - |
| Auditor's Report 2021 - 2022File: Auditors Report Mar 2022.pdf | - |
| Auditor's Report 2020 - 2021File: Auditors Report Mar 2021.pdf | - |
| Auditor's Report 2019 - 2020File: Auditors Report Mar 2020.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR AY 2021 22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR AY 2020 21.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: ITR AY 2019 20.pdf | - |
| Commencement certificate | - |
| Application for issuance of bescom | - |
| Water Noc Mandur Gram Panchayat Huskur | - |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sobha Brooklyn Towers - Town Park Phase 4, W4 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Royal crest Litigation | "PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE" | Ongoing | Dec 2028 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Sep 2028 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2028 | Not due yet |
| Sobha Windsor Phase 4 Wing 9, 10 and 11 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Mar 2028 | Not due yet |
| Sobha Victoria park phase 2 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Victoria park phase 1 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Sentosa Phase 4 Wing 1 and 2 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 2, W2 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Windsor Phase 3 Wing 6, 7 and 8 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Sep 2027 | Not due yet |
| Sobha City Athena | Property No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, Bengaluru | Ongoing | Sep 2027 | Not due yet |
| Sobha Sentosa Phase 3 Wing 3 and 4 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2027 | Not due yet |
| Sobha Sentosa Phase 2 Wing 5 and 6 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2026 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Dec 2026 | Not due yet |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 Litigation | Balagere, Bangalore | Ongoing | Sep 2026 | Not delivered |
| Sobha Sentosa Phase 1 Wing 7 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 8 - Wing 15 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Insignia Litigation | KHATHA NO.1232/128/7, SY NO.128/7, BHOGANAHALLI VILLAGE VARTHUR HOBLI, BENGALURU EAST, BENGALURU URBAN | Ongoing | Mar 2026 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24 Litigation | Balagere, Bangalore | Ongoing | Mar 2026 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22 Litigation | Balagere, Bangalore | Ongoing | Mar 2026 | Not delivered |
| Sobha Windsor Phase 1 Wing 1 and 2 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Nov 2025 | Not delivered |
| Sobha Windsor Phase 2 Wing 3, 4 and 5 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Apr 2025 | Not delivered |
| Sobha Rajvilas Litigation | Sy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation road | Ongoing | Mar 2025 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 25 Wing 32, 33 and 34 Litigation | Balagere, Bangalore | Ongoing | Mar 2025 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30 Litigation | Balagere, Bangalore | Ongoing | Mar 2025 | Not delivered |
| Sobha Lake Gardens Phase 2 | Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram Hobli | Ongoing | Dec 2024 | Not delivered |
| Sobha Dream Gardens Phase 2 - Wing 5, 6 and 7 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Nov 2024 | Not delivered |
| Sobha Dream Gardens Phase 1 - Wing 8 and 9 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Nov 2024 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 Litigation | Balagere, Bangalore | Ongoing | Sep 2024 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28 Litigation | Balagere, Bangalore | Ongoing | Sep 2024 | Not delivered |
| Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 3 - Wing 16 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 2 - Wing 4 and 5 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 1 - Wing 6 and 7 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Lake Gardens Phase 1 | Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram Hobli | Ongoing | Feb 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sobha Galera on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
Floris & Commercial at Brigade Autograph
Ananthay Properties Private Limited
Godrej Woodscapes
Godrej Properties Limited
Sattva Songbird
Sattva Resi Private Limited
Godrej Splendour
Godrej Properties Limited
PAVANI MIRABILIA PHASE I
Sai Sravanthi Infra Projects Pvt Ltd
Godrej Splendour Phase II
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sobha Galera is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sobha Galera?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sobha Galera?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sobha Galera?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Sobha Galera?
The professionals named in the filing: Architect: Geetha K Nair; Engineer: Mr. Durga Prasad KVR; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sobha Galera?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback