Registration approved No litigation declared Residential/Group Housing project

PAVANI MIRABILIA PHASE I

By Sai Sravanthi Infra Projects Pvt Ltd

RG-KA-72250 · RERA PRM/KA/RERA/1251/446/PR/120922/005235 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 3 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
May 2028Possession promisedno revision filed
8 of 18Construction stages donefurthest along: Dadoing, 90%
541 of 1,006Units unsoldnot recorded sold or booked
3Complaints at RERA Karnatakaon this registration
Jump to the 160 documents Report an error

PAVANI MIRABILIA PHASE I is a Residential/Group Housing project by Sai Sravanthi Infra Projects Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/120922/005235 on 12 Sep 2022. Possession is promised by 25 May 2028. 465 of the 1,006 units on this registration are recorded sold or booked, and 8 of 18 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NamePAVANI MIRABILIA PHASE I
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560049
  • Pincode560049
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/120922/005235
  • ReraGenie IDRG-KA-72250

Builder

  • NameSai Sravanthi Infra Projects Pvt Ltd
  • Entity typeCompany
  • CINU45203TG2008PTC060151
  • GSTIN29AAPCS0464C1Z9
  • Authorized SignatoryP V RAGHAVA RAO
  • Managing DirectorP V RAGHAVA RAO
  • DirectorPAVANI
  • Project HeadRAVINDRA KUMAR N
  • Other registrations3 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2022PromisedMay 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on12 Sep 2022
  • Promised completion25 May 2028
  • Revised completionNone
  • Buildings6 building records
  • Documents filed160 files

Current status

46%465 of 1,006 units booked
4.4%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A---1580158
TOWER B---1580158
TOWER C---2380238
TOWER D---2380238
TOWER H---80080
TOWER J---2360236

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 18 construction stages are filed complete. The stage furthest along is Dadoing, at 90%.

Building: 88% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Retaining wall (All types)100%
Plinth level Beam100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
RCC or MS Framed structure100%
Masonry construction: Bricks, Concrete blocks etc100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc80%
Basic work of Water supply, Sanitary and Electrification85%
Dadoing, Skirting, Flooring, Tiles work (All types)90%
Railing and Grill fixing85%
Electrification, Water supply and Sanitary Finishing75%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network75%
Weather Proof work(tile,concrete)75%
Painting80%
Elevation work90%
Internal and External work including landscapes as per santioned drawings40%

Progress on shared amenities41

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes80%
Internal Roads & FootpathsYes70%
Sewage and Drainage SystemYes80%
Parks & Tree plantingYes10%
Street LightingYes5%
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes90%
Solid waste management and disposalNoNot applicable
Water conservationYes60%
Energy managementYes80%
Fire protection and fire safety requirementsYes70%
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes50%
Emergency Evacuation servicesYes50%
Storm water drainsYes75%
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes75%
ElectricityYes30%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes75%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes50%
GymYes70%
ParksYes0%
Power BackupYes50%
GasNoNot applicable
Water and SanitationYes0%
Air Conditioning And incerntionNoNot applicable
StaircasesYes85%
LiftsYes50%
Staircases and Lift lobbies, corridor,lobbies, corridorYes75%
Fire escapesYes80%
Common entrance and exit for the building / common portico/foyer/verandahYes50%
BasementYes85%
TerraceYes80%
Outer WallYes95%
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership5

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area54,278 sq m
Named landowners5
LandownerVillageDistrict
DSR INFRASTRUCTURE PVT LTD--
DSR INFRASTRUCTURE PVT LTD--
M VENKATA KRISHNA REDDY--
DSR INFRASTRUCTURE PVT LTD--
V KRISHNA REDDY--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 490.04 cr
Cost incurredRs 21.54 cr
Spent of the estimate4.39%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 456.77 crRs 18.73 cr
On-site expenditure-Salaries of workersRs 18.27 crRs 80.38 lakh
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 15.00 crRs 2.01 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAKHTAR IMAM
EngineerB V Praveen Kumar
Chartered AccountantRAMAKRISHNA ANIMIREDDI

Complaints filed with RERA Karnataka3

Case no.ComplainantRespondentFiled
00404/2026-Sai Sravanthi Infra Projects Pvt Ltd16/04/2026
00986/2026-Sai Sravanthi Infra Projects Pvt Ltd10/08/2026
01131/2026-Sai Sravanthi Infra Projects Pvt Ltd16/09/2026

Documents filed160

As listed on the registration, under the names the promoter filed them with; the newest 80 of 160 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/120922/005235 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA CERTIFICATE- PAVANI MIRABILIA PHASE I.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE- PAVANI MIRABILIA PHASE I.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE- PAVANI MIRABILIA PHASE I.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q2 2026-27 Airport Authority of India14 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA CERTIFICATE.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHTECT CERTIFICATE.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Clarification for Bank Account and Total InventoryFile: SELF DECLARATION FOR BANK ACCOUNT &.pdf26 Aug 2024
local authority Katha in form 9 and 11File: KATHA.pdf6 Sep 2022
approved drawing with area caluclationsFile: CLARIFICATION FOR AREA STATEMENTS_compressed.pdf6 Sep 2022
Uploaded the copy of fee receipt, Please upload the Fire force NOCFile: CLARIFICATION FOR FIRE FORCE NOC.pdf6 Sep 2022
jn cum decalartions not all land owners signedFile: JOINT AFFIDAVIT CUM DECLARATION.pdf18 Aug 2022
upload khata and khata extractFile: KATHA.pdf18 Aug 2022
jda is exected for syno 22 is 110guntas but sale deed given is 98.08gntas hence need title for remaFile: CLARIFICATION FOR SY NO 22 EXTENT-AFFIDAVIT ALONG WITH SALE DEEDS.pdf18 Aug 2022
chain of title from rtc land owner to conversion land owner for Sy No.22File: SY NO 22.pdf18 Aug 2022
chain of title from rtc land owner to conversion land owner for Sy No.23File: SY NO 23.pdf18 Aug 2022
chain of title from rtc land owner to conversion land owner for SY No.124File: SY NO 124.pdf18 Aug 2022
uploaded plan shows syno 21/1,21/2,21/3,124/1,124/2,125/1,125/2 no documents attached for above synoFile: CLARIFICATION FOR SY NOS DETAILS NOT UPLOADED.pdf18 Aug 2022
project area and plan area is not matching hence need clarifications .File: CLARIFICATION FOR PROJECT AREA AND PLAN AREA.pdf18 Aug 2022
Not uploaded, Please upload the Fire force NOCFile: CLARIFICATION FOR FIRE FORCE NOC.pdf18 Aug 2022
Please upload the copy of fee paid receipt paid towards water supply NOCFile: BWSSB FEES PAID RECEIPT.pdf18 Aug 2022
Please upload the copy of fee paid receipt paid towards Power supply NOCFile: BESCOM FEES PAID RECEIPT.pdf18 Aug 2022
CDP Plan Showing the NALA BufferFile: CDP PLAN WITH NALLA BUFFER.pdf18 Aug 2022
Upload Building LicenseFile: BUILDING LICENSE.pdf18 Aug 2022
2018-19 profit and loss account and balance sheet, Directors report, Audit report and cash flow statFile: FINANCIALS 2018-19.pdf25 Jul 2022
CA UDIN for 2019-20 financial statementFile: FINANCIALS 2019-20 UDIN.pdf25 Jul 2022
CA UDIN for 2020-21 financial statementFile: FINANCIALS 2020-21 UDIN.pdf25 Jul 2022
notrazied joint affidavit cum decalartion in rera prescribed formatFile: JOINT AFFIDAVIT CUM DECLARATION-NOTARIZED.pdf25 Jul 2022
advocate search report SY NO.22File: ADVOCATE SEARCH REPORT SY NO22-2ACRE 30GUNTAS.pdf25 Jul 2022
advocate search report SY NO.23File: ADVOCATE SEARCH REPORT SY NO23-30GUNTAS.pdf25 Jul 2022
advocate search report SY NO.124File: ADVOCATE SEARCH REPORT SY NO124.pdf25 Jul 2022
section 3(1) affidavit with project ack no in rera formatFile: SECTION 3(1) AFFIDAVIT-NOTARIZED.pdf25 Jul 2022
upload the certified copy obtained by the concerned Sub-registrar regarding value of the propertyFile: GUIDELINE VALUE CERTIFIED BY SRO.pdf25 Jul 2022
notarized Non- litigation affidavitFile: NON LITIGATION AFFIDAVIT.pdf25 Jul 2022
RTC for syno 23File: RTC SY No23 (2022-23).pdf25 Jul 2022
upload MR for syno 23File: MUTATION REGISTRATION SY NO 23.pdf25 Jul 2022
RTC of year 2021-2022 SY NO.22File: RTC-SY NO 22 (2021-22).pdf25 Jul 2022
RTC of year 2021-2022 SY NO.23File: RTC-SY NO 23 (2021-22).pdf25 Jul 2022
RTC of year 2021-2022 SY NO.124File: RTC-SY NO 124 (2021-22).pdf25 Jul 2022
MR of year 2021-2022 SY NO.22File: MUTATION REGISTRATION SN 22.pdf25 Jul 2022
MR of year 2021-2022 SY NO.23File: MUTATION REGISTRATION SY NO 23.pdf25 Jul 2022
specify what extent project is happening since uploaded conversion extent and jda extent not matchinFile: CLARIFICATION FOR LAND AREA CONVERSION AND JDA.pdf25 Jul 2022
hissa phody copy SY NO.22File: HISA PODI SN 22.pdf25 Jul 2022
hissa phody copy SY NO.23File: HISSAPODI SR 23.pdf25 Jul 2022
hissa phody copy SY NO.124File: HISA PODI SN 124_compressed.pdf25 Jul 2022
conversion MR SY NO.22File: MUTATION REGISTRATION SN 22.pdf25 Jul 2022
conversion MR SY NO.23File: MUTATION REGISTRATION SY NO 23.pdf25 Jul 2022
absolute sale deed to jda land owner SY NO.22File: SY NO22.pdf25 Jul 2022
absolute sale deed to jda land owner SY NO.23File: 4967-SALE DEED- SY NO23- 32-05 GUNTAAS.pdf25 Jul 2022
absolute sale deed to jda land owner SY NO124File: SY NO124.pdf25 Jul 2022
khata extract and e khataFile: KATHA.pdf25 Jul 2022
chain of title from rtc land owners to jda land owners FOR SY NO22File: SY NO22.pdf25 Jul 2022
chain of title from rtc land owners to jda land owners FOR SY NO23File: 4967-SALE DEED- SY NO23- 32-05 GUNTAAS.pdf25 Jul 2022
chain of title from rtc land owners to jda land owners FOR SY NO 124File: SY NO124.pdf25 Jul 2022
development Plan.File: DEVELOPMENT PLAN.pdf25 Jul 2022
development OrderFile: DEVELOPMENT ORDER.pdf25 Jul 2022
CDP Plan Showing the NALA BufferFile: CDP SKETCH SHOWING NALLA BUFFER.pdf25 Jul 2022
Building LicenseFile: BUILDING LICENSE.pdf25 Jul 2022
update the Exclusive Common Area Allottee and Common Area Allotted To AssociationFile: CLARIFICATION FOR EXCLUSIVE AREA ALLOTED TO ALLOTEE AND ASSOCIA.pdf25 Jul 2022
Provision of STP in the project is to be clarified by the promoter along with the supporting STP desFile: WATER SUMP AND STP DRAWINGS.pdf25 Jul 2022
Please mention the project name and address/Ack number and upload the section 3(1) notarized affidavFile: SECTION 3(1) AFFIDAVIT-NOTARIZED.pdf25 Jul 2022
proforma of Agreement for saleFile: PROFORMA AGREEMENT OF SALE PAVANI MIRABILIA PHASE I.pdf25 Jul 2022
RTC, survey 22-
Mutation, survey 22-
Encumbrance Certificate, survey 22-
Conversion/Alienation Order, survey 22-
JDA, survey 22-
Khatha, survey 22-
RTC, survey 23-

How this compares with Bengaluru Urban

46%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep PAVANI MIRABILIA PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmPAVANI MIRABILIA PHASE IOther 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: Sai Sravanthi Infra Projects Pvt Ltd

Sai Sravanthi Infra Projects Pvt Ltd has 4 registrations on RERA Karnataka, including PAVANI MIRABILIA PHASE I and Pavani Divine. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if PAVANI MIRABILIA PHASE I is delayed beyond 25 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PAVANI MIRABILIA PHASE I?

The registered promoter entity is Sai Sravanthi Infra Projects Pvt Ltd, a company as per the filing. Its CIN U45203TG2008PTC060151 and GSTIN 29AAPCS0464C1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PAVANI MIRABILIA PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PAVANI MIRABILIA PHASE I?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at PAVANI MIRABILIA PHASE I?

The professionals named in the filing: Architect: AKHTAR IMAM; Engineer: B V Praveen Kumar; Chartered Accountant: RAMAKRISHNA ANIMIREDDI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PAVANI MIRABILIA PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PAVANI MIRABILIA PHASE I. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PAVANI MIRABILIA PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.