Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Brooklyn Towers - Town Park Phase 5, W3

Registration approved Litigation declared Residential/Group Housing project

Sobha Brooklyn Towers - Town Park Phase 5, W3

By SOBHA LIMITED

RG-KA-53455 · RERA PRM/KA/RERA/1251/308/PR/210122/004649 · Last updated on RERA Karnataka portal: 13 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2028Possession promisedno revision filed
18 of 18Construction stages doneevery applicable stage filed complete
0 of 261Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 174 documents Report an error

Sobha Brooklyn Towers - Town Park Phase 5, W3 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/210122/004649 on 21 Jan 2022. Possession is promised by 30 Jun 2028. 261 of the 261 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete.

At a glance

Project

  • NameSobha Brooklyn Towers - Town Park Phase 5, W3
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 562107
  • Pincode562107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/210122/004649
  • ReraGenie IDRG-KA-53455

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryMr. Suresh Ganiga
  • Managing DirectorMr Jagadish Nangineni
  • DirectorsRavi P N C Menon, Mr Jagadish Nangineni
  • Project HeadMr.Yatheesha
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredJan 2022PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on21 Jan 2022
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed174 files

Current status

100%261 of 261 units booked
104.7%Of the estimated cost spent so far

Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 3---2610261

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 18 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Retaining wall (All types)100%
Plinth level Beam100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
RCC or MS Framed structure100%
Masonry construction: Bricks, Concrete blocks etc100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Painting100%
Elevation work100%
Internal and External work including landscapes as per santioned drawings100%

Progress on shared amenities41

As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes85%
Internal Roads & FootpathsYes50%
Sewage and Drainage SystemYes41%
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes1%
Water conservationYes13%
Energy managementYes80%
Fire protection and fire safety requirementsYes71%
Education/Health/Other public amenitiesYes0%
Electricity supply transformer and substationYes0%
Emergency Evacuation servicesYes0%
Storm water drainsYes28%
Use of renewable energyYes0%
Water conservation/rain water harvesting/recharge of ground waterYes13%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes30%
GymYes0%
ParksYes0%
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes100%
LiftsYes100%
Staircases and Lift lobbies, corridor,lobbies, corridorYes100%
Fire escapesYes100%
Common entrance and exit for the building / common portico/foyer/verandahYes100%
BasementNoNot applicable
TerraceYes100%
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,762 sq m
Named landowners6
LandownerVillageDistrict
M/s. Urban Space Projects Private Limited--
M/s. Urban Space Projects Private Limited--
M/s. Urban Space Projects Private Limited--
A.G.Hemanth Kumar--
T.Shivaraj--
A.G.Hemanth Kumar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 102.43 cr
Cost incurredRs 107.19 cr
Spent of the estimate104.65%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 73.44 crRs 93.24 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 16.49 crRs 1.65 cr
Payment of taxesRs 7.36 crRs 7.39 cr
On-site expenditure-Site OverheadRs 5.14 crRs 4.91 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArun Kumar
EngineerMr. Durga Prasad KVR
Chartered AccountantBalaji D

Litigation declaredYes

The promoter declares litigation on this registration. The case records are in the filed documents.

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed174

As listed on the registration, under the names the promoter filed them with; the newest 80 of 174 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/210122/004649 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 5 C.pdf13 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Brooklyn Ph5.pdf13 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Ph5.pdf13 Oct 2026
Q2 2026-27 Water supply and sewage board13 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Oct 2026
Q2 2026-27 KPTCL- BESCOM13 Oct 2026
Q2 2026-27 Fire and Safety13 Oct 2026
Q2 2026-27 Registration documentFile: Brooklyn DOD C.pdf13 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 5.pdf10 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Brooklyn PH5.pdf10 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Phase 5.pdf10 Jul 2026
Q1 2026-27 Water supply and sewage board10 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)10 Jul 2026
Q1 2026-27 KPTCL- BESCOM10 Jul 2026
Q1 2026-27 Fire and Safety10 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 5.pdf10 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Brooklyn Phase 5.pdf10 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Phase 5.pdf10 Apr 2026
Q4 2025-26 Water supply and sewage board10 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)10 Apr 2026
Q4 2025-26 KPTCL- BESCOM10 Apr 2026
Q4 2025-26 Fire and Safety10 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 5.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Sobha Brooklyn PH 5.pdf13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brooklyn PH 5.pdf13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
Q3 2025-26 KPTCL- BESCOM13 Jan 2026
Agreement for saleFile: RERA ATS draft Brooklyn towers 13 jan 2022.pdf19 Jan 2022
Agreement for SaleFile: Sobha Brooklyn towers ATS draft ph5 w3.pdf5 Jan 2022
Affidavit for no litigation on project landFile: Affidavit for No litigation - ph5 w3.pdf5 Jan 2022
Affidavit for no mortgage on project landFile: Affidavit for No Mortgage - ph5 w3.pdf5 Jan 2022
Form B regarding litigation of project landsFile: Form B Sobha Brooklyn Towers Phase 5 W3.pdf30 Nov 2021
Plan specifying the proposed area of development of construction phase wisesFile: Phase 5 Development Plan comp.pdf30 Nov 2021
Site planFile: 1 Site plan.PDF30 Nov 2021
GF planFile: 2 GF plan.PDF30 Nov 2021
1st floor planFile: 3 FF plan.PDF30 Nov 2021
2nd to 6th floor planFile: 4 second to sixth fl plan.PDF30 Nov 2021
7th floor planFile: 5 7th fl plan.PDF30 Nov 2021
8th and 9th floor planFile: 6 8th and 9th fl plan.PDF30 Nov 2021
10th floor planFile: 7 10th fl plan.PDF30 Nov 2021
20th and 30th floor planFile: 10 20th and 30th fl plan.PDF30 Nov 2021
11th to 19th, 21st to 29th and 31st to 39th floor plansFile: Typ floor plan 11to19 21to29 and 31to39.PDF30 Nov 2021
Terrace floor planFile: 9 Terrace fl plan.PDF30 Nov 2021
Section and elevationFile: 11 Section and elevation.PDF30 Nov 2021
Common area will not be allocated to the association since it is a part of SBAFile: Sobha Brooklyn towers phase 5.xlsx30 Nov 2021
Project scheduleFile: Project schedule ph5.xlsx30 Nov 2021
Authorized signed copy of project specificationFile: Sobha Brooklyn Towers -Annexure Specifications.pdf30 Nov 2021
Fire NOCFile: Yedavana Halli Fire NOC Affordable.pdf30 Nov 2021
Provision of STP in the projectFile: Brookyln Tower STP drawing.pdf30 Nov 2021
Complaint No 2219File: 26 2219 Complied.pdf20 Nov 2021
Complaint No 7611File: 7611 Complied R1.pdf20 Nov 2021
RTC, survey 51/1-
Mutation, survey 51/1-
Encumbrance Certificate, survey 51/1-
Conversion/Alienation Order, survey 51/1-
Sale/Title/Gift Deed, survey 51/1-
JDA, survey 51/1-
Khatha, survey 51/1-
RTC, survey 51/2-
Mutation, survey 51/2-
Encumbrance Certificate, survey 51/2-
Conversion/Alienation Order, survey 51/2-
Sale/Title/Gift Deed, survey 51/2-
JDA, survey 51/2-
Khatha, survey 51/2-
RTC, survey 52/1-
Mutation, survey 52/1-
Encumbrance Certificate, survey 52/1-
Conversion/Alienation Order, survey 52/1-
Sale/Title/Gift Deed, survey 52/1-
JDA, survey 52/1-
Khatha, survey 52/1-
RTC, survey 52/2-
Mutation, survey 52/2-
Encumbrance Certificate, survey 52/2-
Conversion/Alienation Order, survey 52/2-
Sale/Title/Gift Deed, survey 52/2-
JDA, survey 52/2-
Khatha, survey 52/2-
RTC, survey 53-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

28 not delivered by the promised date5 under way, not due yet36 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Sobha Manhattan Towers - Town Park Phase 2, Wing 1 and 2 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingSep 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingSep 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Manhattan Towers - Town Park Phase 1, Wing 4 and 5 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingDec 2026Not due yet
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 LitigationBalagere, BangaloreOngoingSep 2026Not delivered
Sobha Royal Pavilion Phase 8 - Wing 15 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 6 - Wing 10 and 11 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 5 - Wing 8 and 9 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Windsor Phase 2 Wing 3, 4 and 5 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingApr 2026Not delivered
Sobha Windsor Phase 1 Wing 1 and 2 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingNov 2025Not delivered
Sobha Rajvilas LitigationSy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation roadOngoingMar 2025Not delivered
Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30 LitigationBalagere, BangaloreOngoingMar 2025Not delivered
Sobha Dream Gardens Phase 2 - Wing 5, 6 and 7 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Gardens Phase 1 - Wing 8 and 9 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 3 - Wing 16 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 2 - Wing 4 and 5 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 1 - Wing 6 and 7 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Lake Gardens Phase 1Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram HobliOngoingFeb 2024Not delivered
Sobha Forest Edge02/20/1/21/2 Hosahalli, Kengeri Sub Division, Ward No.198, BengaluruOngoingJun 2023Not delivered
Sobha HRC Pristine Phase 4 Block 4 and 5 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 3 Block 3 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 2 Block 2 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 1 Block 1 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha Dream Acres - Palm Springs Phase 16 Wing 50 LitigationBalagere, BangaloreOngoingMar 2023Not delivered
Sobha Arena - Pebble Court (Block 1) LitigationKanakapura Road, BangaloreOngoingJan 2023Not delivered
Sobha Arena - The Square (Block 4) LitigationKanakapura Road, BangaloreOngoingSep 2022Not delivered
Sobha Palm Court LitigationYelahanka, BangaloreOngoingFeb 2022Not delivered
Sobha Morzaria Grandeur 2 (W1)Dairy circle, BangaloreOngoingFeb 2022Not delivered
Sobha Silicon Oasis Wings 1, 2, 3, 4, 5, 6 LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Wing 9 LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Wing 8 LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Wing 7 LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Block 2 and 3 (Row house No. 9, 10) LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Block 2 and 3 (Row house No. 1 to 8 & 11 to 17) LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Serene LitigationVGN Narmadha Enclave Road, Sennerkuppam RoadCompleted-No date filed

How this compares with Bengaluru Urban

100%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sobha Brooklyn Towers - Town Park Phase 5, W on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSobha Brooklyn Towers - Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sobha Brooklyn Towers - Town Park Phase 5, W3 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sobha Brooklyn Towers - Town Park Phase 5, W3?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sobha Brooklyn Towers - Town Park Phase 5, W3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Sobha Brooklyn Towers - Town Park Phase 5, W3?

The professionals named in the filing: Architect: Arun Kumar; Engineer: Mr. Durga Prasad KVR; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sobha Brooklyn Towers - Town Park Phase 5, W3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sobha Brooklyn Towers - Town Park Phase 5, W3. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sobha Brooklyn Towers - Town Park Phase 5, W to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.