Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Brooklyn Towers - Town Park Phase 2, W2
Sobha Brooklyn Towers - Town Park Phase 2, W2
RG-KA-96209 · RERA PRM/KA/RERA/1251/308/PR/210122/004648 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared
- 1 complaint at RERA Karnataka
Clear
- Completion date never moved
- Separate project account declared
Saved.
Sobha Brooklyn Towers - Town Park Phase 2, W2 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/210122/004648 on 21 Jan 2022. Possession is promised by 31 Dec 2027. 99 of the 261 units on this registration are recorded sold or booked, and 8 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSobha Brooklyn Towers - Town Park Phase 2, W2
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 562107
- Pincode562107
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/210122/004648
- ReraGenie IDRG-KA-96209
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- GSTIN29AABCS7723E1ZB
- Authorized SignatoryMr. Suresh Ganiga
- Managing DirectorMr Jagadish Nangineni
- DirectorsMr Jagadish Nangineni, Ravi P N C Menon, Ravi P N C Menon
- Project HeadMr.Yatheesha
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 Jan 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed175 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing 2 | - | - | - | 99 | 0 | 99 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 18 construction stages are filed complete. The stage furthest along is Railing and Grill fixing, at 84%.
Building: 66% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 0% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 70% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 84% |
| Electrification, Water supply and Sanitary Finishing | 64% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 26% |
| Weather Proof work(tile,concrete) | 55% |
| Painting | 5% |
| Elevation work | 70% |
| Internal and External work including landscapes as per santioned drawings | 22% |
Progress on shared amenities41
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 53% |
| Internal Roads & Footpaths | Yes | 22% |
| Sewage and Drainage System | Yes | 6% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Water conservation | Yes | 10% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 27% |
| Education/Health/Other public amenities | Yes | 0% |
| Electricity supply transformer and substation | Yes | 8% |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 30% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 10% |
| Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 100% |
| Basement | No | Not applicable |
| Terrace | Yes | 100% |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership6
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s. Urban Space Projects Private Limited | - | - |
| M/s. Urban Space Projects Private Limited | - | - |
| M/s. Urban Space Projects Private Limited | - | - |
| A.G.Hemanth Kumar | - | - |
| T.Shivaraj | - | - |
| A.G.Hemanth Kumar | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 69.95 cr | Rs 54.61 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 14.53 cr | Rs 1.74 cr |
| Payment of taxes | Rs 7.78 cr | Rs 9.25 cr |
| On-site expenditure-Site Overhead | Rs 4.90 cr | Rs 3.55 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arun Kumar |
| Engineer | Mr. Durga Prasad KVR |
| Chartered Accountant | Balaji D |
Litigation declaredYes
The promoter declares litigation on this registration. The case records are in the filed documents.
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01277/2023 | - | SOBHA LIMITED | 22/08/2023 |
Documents filed175
As listed on the registration, under the names the promoter filed them with; the newest 80 of 175 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/210122/004648 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 2 C.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Brooklyn Ph2.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Ph2.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 13 Oct 2026 |
| Q2 2026-27 Fire and Safety | 13 Oct 2026 |
| Q2 2026-27 Registration documentFile: Brooklyn DOD C.pdf | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 2.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Brooklyn PH2.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Phase 2.pdf | 10 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 10 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 10 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 10 Jul 2026 |
| Q1 2026-27 Fire and Safety | 10 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 2.pdf | 10 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Brooklyn Phase 2.pdf | 10 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Phase 2.pdf | 10 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 10 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 10 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 10 Apr 2026 |
| Q4 2025-26 Fire and Safety | 10 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 2.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Sobha Brooklyn PH 2.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brooklyn PH 2.pdf | 13 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Jan 2026 |
| Agreement for SaleFile: RERA ATS draft Brooklyn towers 13 jan 2022.pdf | 13 Jan 2022 |
| Agreement for saleFile: Brooklyn towers ATS draft 04012022.pdf | 4 Jan 2022 |
| Proforma of Agreement for Sale along with all the required documentsFile: ATS with all documents.pdf | 18 Dec 2021 |
| Details of covered car parkingFile: Annexure V for Carparks.pdf | 18 Dec 2021 |
| Project specificationsFile: Sobha Brooklyn Towers Annexure Specifications 27102021.pdf | 18 Dec 2021 |
| Amenities to be providedFile: List of Amenities.pdf | 18 Dec 2021 |
| Common AreasFile: Annexure III - Common Areas.pdf | 18 Dec 2021 |
| Milestones based paymentsFile: Milestones based payments by the allottees.pdf | 18 Dec 2021 |
| Affidavit for No mortgage on the project landFile: Affidavit for No Mortgage.pdf | 18 Dec 2021 |
| Notarized affidavit regarding no litigation of project landsFile: Affidavit Cum Declaration - ph2 w2.pdf | 9 Dec 2021 |
| Form B regarding litigation of project landsFile: Form B Sobha Brooklyn Towers Phase 2 W2.pdf | 30 Nov 2021 |
| Plan specifying the proposed area of development of construction phase wisesFile: Phase 2 Development Plan Comp.pdf | 30 Nov 2021 |
| Site PlanFile: 1 Site plan.PDF | 30 Nov 2021 |
| GF planFile: 2 GF plan.PDF | 30 Nov 2021 |
| 1st floor planFile: 3 FF plan.PDF | 30 Nov 2021 |
| 2nd floor to 6th floor planFile: 4 second to sixth fl plan.PDF | 30 Nov 2021 |
| 7th floor planFile: 5 7th fl plan.PDF | 30 Nov 2021 |
| 8th and 9th floor planFile: 6 8th and 9th fl plan.PDF | 30 Nov 2021 |
| 10th floor planFile: 7 10th fl plan.PDF | 30 Nov 2021 |
| 20th and 30th floor planFile: 10 20th and 30th fl plan.PDF | 30 Nov 2021 |
| 11th to 19th floor, 21st to 29th floor and 31st to 39th floor plansFile: Typ floor plan 11to19 21to29 and 31to39.PDF | 30 Nov 2021 |
| Terrace floor planFile: 9 Terrace fl plan.PDF | 30 Nov 2021 |
| Section and elevationFile: 11 Section and elevation.PDF | 30 Nov 2021 |
| Common area will not be allocated to the association since it is a part of SBAFile: Sobha brooklyn towers phase 2.xlsx | 30 Nov 2021 |
| Project scheduleFile: Project schedule ph2.xlsx | 30 Nov 2021 |
| Authorized signed copy of project specificationFile: Sobha Brooklyn Towers -Annexure Specifications.pdf | 30 Nov 2021 |
| Fire NOCFile: Yedavana Halli Fire NOC Affordable.pdf | 30 Nov 2021 |
| Provision of STP in the projectFile: Brookyln Tower STP drawing.pdf | 30 Nov 2021 |
| Complaint No 2219File: 26 2219 Complied.pdf | 20 Nov 2021 |
| Complaint No 7611File: 7611 Complied R1.pdf | 20 Nov 2021 |
| RTC, survey 51/1 | - |
| Mutation, survey 51/1 | - |
| Encumbrance Certificate, survey 51/1 | - |
| Conversion/Alienation Order, survey 51/1 | - |
| Sale/Title/Gift Deed, survey 51/1 | - |
| JDA, survey 51/1 | - |
| Khatha, survey 51/1 | - |
| RTC, survey 51/2 | - |
| Mutation, survey 51/2 | - |
| Encumbrance Certificate, survey 51/2 | - |
| Conversion/Alienation Order, survey 51/2 | - |
| Sale/Title/Gift Deed, survey 51/2 | - |
| JDA, survey 51/2 | - |
| Khatha, survey 51/2 | - |
| RTC, survey 52/1 | - |
| Mutation, survey 52/1 | - |
| Encumbrance Certificate, survey 52/1 | - |
| Conversion/Alienation Order, survey 52/1 | - |
| Sale/Title/Gift Deed, survey 52/1 | - |
| JDA, survey 52/1 | - |
| Khatha, survey 52/1 | - |
| RTC, survey 52/2 | - |
| Mutation, survey 52/2 | - |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sobha Manhattan Towers - Town Park Phase 2, Wing 1 and 2 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Sep 2028 | Not due yet |
| Sobha Windsor Phase 4 Wing 9, 10 and 11 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Mar 2028 | Not due yet |
| Sobha Windsor Phase 3 Wing 6, 7 and 8 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Sep 2027 | Not due yet |
| Sobha City Athena | Property No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, Bengaluru | Ongoing | Sep 2027 | Not due yet |
| Sobha Manhattan Towers - Town Park Phase 1, Wing 4 and 5 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Dec 2026 | Not due yet |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 Litigation | Balagere, Bangalore | Ongoing | Sep 2026 | Not delivered |
| Sobha Royal Pavilion Phase 8 - Wing 15 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Windsor Phase 2 Wing 3, 4 and 5 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Apr 2026 | Not delivered |
| Sobha Windsor Phase 1 Wing 1 and 2 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Nov 2025 | Not delivered |
| Sobha Rajvilas Litigation | Sy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation road | Ongoing | Mar 2025 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30 Litigation | Balagere, Bangalore | Ongoing | Mar 2025 | Not delivered |
| Sobha Dream Gardens Phase 2 - Wing 5, 6 and 7 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Nov 2024 | Not delivered |
| Sobha Dream Gardens Phase 1 - Wing 8 and 9 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Nov 2024 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 Litigation | Balagere, Bangalore | Ongoing | Sep 2024 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28 Litigation | Balagere, Bangalore | Ongoing | Sep 2024 | Not delivered |
| Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 3 - Wing 16 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 2 - Wing 4 and 5 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 1 - Wing 6 and 7 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Lake Gardens Phase 1 | Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram Hobli | Ongoing | Feb 2024 | Not delivered |
| Sobha Forest Edge | 02/20/1/21/2 Hosahalli, Kengeri Sub Division, Ward No.198, Bengaluru | Ongoing | Jun 2023 | Not delivered |
| Sobha HRC Pristine Phase 4 Block 4 and 5 Litigation | Survey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, Bengaluru | Ongoing | Apr 2023 | Not delivered |
| Sobha HRC Pristine Phase 3 Block 3 Litigation | Survey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, Bengaluru | Ongoing | Apr 2023 | Not delivered |
| Sobha HRC Pristine Phase 2 Block 2 Litigation | Survey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, Bengaluru | Ongoing | Apr 2023 | Not delivered |
| Sobha HRC Pristine Phase 1 Block 1 Litigation | Survey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, Bengaluru | Ongoing | Apr 2023 | Not delivered |
| Sobha Dream Acres - Palm Springs Phase 16 Wing 50 Litigation | Balagere, Bangalore | Ongoing | Mar 2023 | Not delivered |
| Sobha Arena - Pebble Court (Block 1) Litigation | Kanakapura Road, Bangalore | Ongoing | Jan 2023 | Not delivered |
| Sobha Arena - The Square (Block 4) Litigation | Kanakapura Road, Bangalore | Ongoing | Sep 2022 | Not delivered |
| Sobha Palm Court Litigation | Yelahanka, Bangalore | Ongoing | Feb 2022 | Not delivered |
| Sobha Morzaria Grandeur 2 (W1) | Dairy circle, Bangalore | Ongoing | Feb 2022 | Not delivered |
| Sobha Silicon Oasis Wings 1, 2, 3, 4, 5, 6 Litigation | Hosa Road, Bangalore | Completed | - | No date filed |
| Sobha Silicon Oasis Wing 8 Litigation | Hosa Road, Bangalore | Completed | - | No date filed |
| Sobha Silicon Oasis Wing 7 Litigation | Hosa Road, Bangalore | Completed | - | No date filed |
| Sobha Silicon Oasis WIng 9 Litigation | Hosa Road, Bangalore | Completed | - | No date filed |
| Sobha Silicon Oasis Block 2 and 3 (Row house No. 9, 10) Litigation | Hosa Road, Bangalore | Completed | - | No date filed |
| Sobha Silicon Oasis Block 2 and 3 (Row house No. 1 to 8 & 11 to 17) Litigation | Hosa Road, Bangalore | Completed | - | No date filed |
| Sobha Serene Litigation | VGN Narmadha Enclave Road, Sennerkuppam Road | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sobha Brooklyn Towers - Town Park Phase 2, W on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
SHRIRAM 107SOUTHEAST - PHASE 3
Shriprop Living Space Private Limited
RAJ HIGH GARDENS
SNN Properties LLP
Sobha Madison Heights-Townpark Phase 2 W1 to 4
SOBHA LIMITED
DS MAX SKY SAMPADHA
DS MAX PROPERTIES PRIVATE LIMITED
Sobha Hamptons -Townpark Phase 1 W4 to 6
SOBHA LIMITED
Sobha Hamptons -Townpark Phase 2 W1 to 3
SOBHA LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sobha Brooklyn Towers - Town Park Phase 2, W2 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sobha Brooklyn Towers - Town Park Phase 2, W2?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sobha Brooklyn Towers - Town Park Phase 2, W2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sobha Brooklyn Towers - Town Park Phase 2, W2?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Sobha Brooklyn Towers - Town Park Phase 2, W2?
The professionals named in the filing: Architect: Arun Kumar; Engineer: Mr. Durga Prasad KVR; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sobha Brooklyn Towers - Town Park Phase 2, W2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback