Home / Browse projects / Bengaluru Urban, Karnataka / SOBHA Ayana at Dream Acres Wing 60 to 71
SOBHA Ayana at Dream Acres Wing 60 to 71
RG-KA-72055 · RERA PRM/KA/RERA/1251/446/PR/030824/006958 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SOBHA Ayana at Dream Acres Wing 60 to 71 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/030824/006958 on 3 Aug 2024. Possession is promised by 31 Dec 2031. 426 of the 683 units on this registration are recorded sold or booked, and 2 of 17 construction stages are filed complete.
At a glance
Project
- NameSOBHA Ayana at Dream Acres Wing 60 to 71
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560087
- Pincode560087
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/030824/006958
- ReraGenie IDRG-KA-72055
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- GSTIN29AABCS7723E1ZB
- Authorized SignatoryPavithra G Kalmath
- Managing DirectorMr Jagadish Nangineni
- DirectorMr Jagadish Nangineni
- Project HeadMr Praveen N K
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on3 Aug 2024
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings12 building records
- Documents filed286 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing 60 | - | - | - | 58 | 0 | 58 |
| Wing 61 | - | - | - | 60 | 0 | 60 |
| Wing 62 | - | - | - | 60 | 0 | 60 |
| Wing 63 | - | - | - | 60 | 0 | 60 |
| Wing 64 | - | - | - | 58 | 0 | 58 |
| Wing 65 | - | - | - | 58 | 0 | 58 |
| Wing 66 | - | - | - | 60 | 0 | 60 |
| Wing 67 | - | - | - | 48 | 0 | 48 |
| Wing 68 | - | - | - | 48 | 0 | 48 |
| Wing 69 | - | - | - | 60 | 0 | 60 |
| Wing 70 | - | - | - | 58 | 0 | 58 |
| Wing 71 | - | - | - | 55 | 0 | 55 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 17 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 51%.
Building: 25% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 51% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 51% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 21% |
| Masonry Construction | 20% |
| Plastering inside , outside & Ceiling | 16% |
| Joinery: Doors, Windows, Ventilators etc | 13% |
| Basic work of Water supply, Sanitary and Electrification | 16% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 7% |
| Railing and Grill fixing | 15% |
| Electrification, Water supply and Sanitary Finishing | 5% |
| Painting | 6% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 2% |
| Internal and External work including landscapes as per sanctioned drawings | 1% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 75% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 75% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 75% |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | 75% |
| Power Backup | Yes | 75% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 75% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 12% |
| Lifts | Yes | 10% |
| Corridor/Lobbies | Yes | 12% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 20% |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership13
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
| M/s Sobha Developers Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 632.19 cr | Rs 116.01 cr |
| Payment of taxes | Rs 87.63 cr | Rs 11.65 cr |
| On-site expenditure-Site Overhead | Rs 63.22 cr | Rs 4.88 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 42.00 cr | Rs 3.12 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arun Kumar |
| Engineer | Balakrishnan G |
| Chartered Accountant | D Balaji |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed286
As listed on the registration, under the names the promoter filed them with; the newest 80 of 286 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/030824/006958 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SDA Ayana C.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Ayana.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Ayana.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SDA Ayana.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Ayana.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Ayana.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SDA Ayana.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Ayana.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Ayana.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q4 2025-26 Fire and Safety | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SDA Ayana C.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Sobha Ayana.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Ayana.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Q3 2025-26 Fire and Safety | 12 Jan 2026 |
| Company Incorporation certificateFile: 1 Company Incorporation certificate.pdf | 6 Jul 2024 |
| Property tax paid receiptFile: 2 Property tax paid receipt.pdf | 6 Jul 2024 |
| EC Sy No 50 2File: 2 EC Sy No 50 2.pdf | 6 Jul 2024 |
| EC Sy No 50 4File: 2 EC Sy No 50 4.pdf | 6 Jul 2024 |
| EC Sy No 50 5File: 2 EC Sy No 50 5.pdf | 6 Jul 2024 |
| EC Sy No 50 6File: 2 EC Sy No 50 6.pdf | 6 Jul 2024 |
| EC Sy No 51 1File: 2 EC Sy No 51 1.pdf | 6 Jul 2024 |
| EC Sy No 51 2B1File: 2 EC Sy No 51 2B1.pdf | 6 Jul 2024 |
| EC Sy No 51 2B2File: 2 EC Sy No 51 2B2.pdf | 6 Jul 2024 |
| EC Sy No 51 2C1File: 2 EC Sy No 51 2C1.pdf | 6 Jul 2024 |
| EC Sy No 51 2C2File: 2 EC Sy No 51 2C2.pdf | 6 Jul 2024 |
| EC Sy No 51 3File: 2 EC Sy No 51 3.pdf | 6 Jul 2024 |
| EC Sy No 51 4File: 2 EC Sy No 51 4.pdf | 6 Jul 2024 |
| EC Sy No 53 1File: 2 EC Sy No 53 1.pdf | 6 Jul 2024 |
| EC Sy No 53 2File: 2 EC Sy No 53 2.pdf | 6 Jul 2024 |
| DeclarationFile: Declaration.pdf | 6 Jul 2024 |
| Reply to QueryFile: Reply to Query.pdf | 6 Jul 2024 |
| Reply to Query ACK 8240File: Reply to Query ACK 8240.pdf | 25 Jun 2024 |
| Directors list Company Secretary CertificateFile: 1 Directors list Company Secretary Certificate.pdf | 25 Jun 2024 |
| Form 1 CA SOBHA Ayana at Dream Acres Wing 60 to 71File: 1 Form 1 CA SOBHA Ayana at Dream Acres Wing 60 to 71.pdf | 25 Jun 2024 |
| Source of fund with cash flow statementFile: 3 Source of fund with cash flow statement.pdf | 25 Jun 2024 |
| EC Sy No 50 2File: 4 EC Sy No 50 2.pdf | 25 Jun 2024 |
| EC Sy No 50 4File: 4 EC Sy No 50 4.pdf | 25 Jun 2024 |
| EC Sy No 50 5File: 4 EC Sy No 50 5.pdf | 25 Jun 2024 |
| EC Sy No 50 6File: 4 EC Sy No 50 6.pdf | 25 Jun 2024 |
| EC Sy No 51 2B1File: 4 EC Sy No 51 2B1.pdf | 25 Jun 2024 |
| EC Sy No 51 2B2File: 4 EC Sy No 51 2B2.pdf | 25 Jun 2024 |
| EC Sy No 51 2C1File: 4 EC Sy No 51 2C1.pdf | 25 Jun 2024 |
| EC Sy No 51 2C2File: 4 EC Sy No 51 2C2.pdf | 25 Jun 2024 |
| EC Sy No 51 3File: 4 EC Sy No 51 3.pdf | 25 Jun 2024 |
| EC Sy No 51 4File: 4 EC Sy No 51 4.pdf | 25 Jun 2024 |
| EC Sy No 53 1File: 4 EC Sy No 53 1.pdf | 25 Jun 2024 |
| EC Sy No 53 2File: 4 EC Sy No 53 2.pdf | 25 Jun 2024 |
| license BBMP Endorsement Partial CC 60 to 71File: 6 license BBMP Endorsement Partial CC 60 to 71.pdf | 25 Jun 2024 |
| Sanction plan BBMP Endorsement Partial CC 60 to 71File: 7 Sanction plan BBMP Endorsement Partial CC 60 to 71.pdf | 25 Jun 2024 |
| Development Plan OrderFile: 8 Development Plan Order.pdf | 25 Jun 2024 |
| ZRFile: 8 ZR.pdf | 25 Jun 2024 |
| NOCs Renewed ExplainationFile: 10 NOCs Renewed Explaination.pdf | 25 Jun 2024 |
| Fire SEIAA NOC Renewed ExplainationFile: 12 Fire SEIAA NOC Renewed Explaination.pdf | 25 Jun 2024 |
| Ayana Area DetailsFile: 15 Ayana Area Details.pdf | 25 Jun 2024 |
| Certified Carpet Area CalculationFile: 18 Certified Carpet Area Calculation.pdf | 25 Jun 2024 |
| CDP MapFile: 19 CDP Map.pdf | 25 Jun 2024 |
| village mapFile: 20 village map.pdf | 25 Jun 2024 |
| Development Plan Drawing ayanaFile: 17 Development Plan Drawing ayana.pdf | 25 Jun 2024 |
| KSPCB no of units and Plan no of unitsFile: KSPCB units and Plan units.pdf | 25 Jun 2024 |
| Renewed BL & Sanctioned PLan - Ayana -File: Renewed BL & Sanctioned PLan - Ayana -.pdf | 25 Jun 2024 |
| SEIAA units and Plan unitsFile: SEIAA units and Plan units.pdf | 25 Jun 2024 |
| Basement Floor Plan Zone 10 Basement 01File: Basement Floor Plan Zone 10 Basement 01.pdf | 25 Jun 2024 |
| Basement Floor Plan Zone 10 Basement 02File: Basement Floor Plan Zone 10 Basement 02.pdf | 25 Jun 2024 |
| Demarcated Plan for AyanaFile: Demarcated Plan.pdf | 25 Jun 2024 |
| Elevation - Wing 65 66 69 70File: Elevation - Wing 65 66 69 70.pdf | 25 Jun 2024 |
| Elevation - Wing 67 68File: Elevation - Wing 67 68.pdf | 25 Jun 2024 |
Promoter's earlier projects31
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sobha Dream Gardens Phase 5 - Wing 10 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 4 - Wing 1 and 2 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 3 - Wing 3 and 4 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2027 | Not due yet |
| Sobha Windsor Phase 3 Wing 6, 7 and 8 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Sep 2027 | Not due yet |
| Sobha City Athena Litigation | Property No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, Bengaluru | Ongoing | Sep 2027 | Not due yet |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 Litigation | Balagere, Bangalore | Ongoing | Sep 2026 | Not delivered |
| Sobha Royal Pavilion Phase 8 - Wing 15 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Windsor Phase 2 Wing 3, 4 and 5 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Apr 2026 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24 Litigation | Balagere, Bangalore | Ongoing | Mar 2026 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22 Litigation | Balagere, Bangalore | Ongoing | Mar 2026 | Not delivered |
| Sobha Windsor Phase 1 Wing 1 and 2 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Nov 2025 | Not delivered |
| Sobha Rajvilas Litigation | Sy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation road | Ongoing | Mar 2025 | Not delivered |
| Sobha Lake Gardens Phase 2 | Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram Hobli | Ongoing | Dec 2024 | Not delivered |
| Sobha Dream Gardens Phase 1 - Wing 8 and 9 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Nov 2024 | Not delivered |
| Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 3 - Wing 16 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Lake Gardens Phase 1 | Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram Hobli | Ongoing | Feb 2024 | Not delivered |
| Sobha Silicon Oasis Phase 5 Wing 10 & 11 Litigation | Hosa Road, Bangalore | Completed | - | No date filed |
| Sobha Silicon Oasis Phase 3 Wing 8 Litigation | Hosa Road, Bangalore | Completed | - | No date filed |
| Sobha HRC Pristine Phase 3 Block 3 Litigation | Field is not sufficient to enter the details | Completed | - | No date filed |
| Sobha Dream Acres - Rain forest Phase 15 Wing 17 Litigation | Balagere, Bangalore | Completed | - | No date filed |
| Sobha Dream Acres - Rain forest Phase 1 Wing 1 and 2 Litigation | Balagere, Bangalore | Completed | - | No date filed |
| Sobha Dream Acres - Rain Forest Phase 5 Wing 16 Litigation | Balagere, Bangalore | Completed | - | No date filed |
| Sobha Dream Acres - Rain Forest Phase 5 Wing 16 Litigation | Balagere, Bangalore | Completed | - | No date filed |
| Sobha Dream Acres - Rain Forest Phase 4 Wing 11 Litigation | Balagere, Bangalore | Completed | - | No date filed |
| Sobha Dream Acres - Rain Forest Phase 3 Wing 5 and 6 Litigation | Balagere, Bangalore | Completed | - | No date filed |
| Sobha Avenue Litigation | Whitefield, Bangalore | Completed | - | No date filed |
| Sobha Arena - The Square (Block 4) Litigation | Kanakapura Road, Bangalore | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SOBHA Ayana at Dream Acres Wing 60 to 71 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 96 registered projects within 2 km.
Prestige Lavender Fields
Prestige Office Ventures
Brigade Sanctuary
Brigade Enterprises Ltd
MYHNA VISTARA
MYHNA PROPERTIES PRIVATE LIMITED
ABHEE AARIA
ABHEE VENTURES PRIVATE LIMITED
ABHEE CITY URBAN GLENN PHASE II
ABHEE VENTURES PRIVATE LIMITED
GODREJ PARK RETREAT
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SOBHA Ayana at Dream Acres Wing 60 to 71 is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SOBHA Ayana at Dream Acres Wing 60 to 71?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SOBHA Ayana at Dream Acres Wing 60 to 71?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SOBHA Ayana at Dream Acres Wing 60 to 71?
The professionals named in the filing: Architect: Arun Kumar; Engineer: Balakrishnan G; Chartered Accountant: D Balaji. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SOBHA Ayana at Dream Acres Wing 60 to 71?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback