MYHNA VISTARA
By MYHNA PROPERTIES PRIVATE LIMITED
RG-KA-44824 · RERA PRM/KA/RERA/1251/446/PR/040226/008447 · Last updated on RERA Karnataka portal: 15 Jul 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MYHNA VISTARA is a Residential/Group Housing project by MYHNA PROPERTIES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/040226/008447 on 4 Feb 2026. Possession is promised by 31 Dec 2030. 115 of the 1,127 units on this registration are recorded sold or booked, and 0 of 19 construction stages are filed complete.
At a glance
Project
- NameMYHNA VISTARA
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560087
- Pincode560087
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/040226/008447
- ReraGenie IDRG-KA-44824
Builder
- NameMYHNA PROPERTIES PRIVATE LIMITED
- Entity typeCompany
- CINU70200KA2011PTC058719
- GSTIN29AAHCM1928M1ZZ
- Authorized SignatoryM KARTHIKEYAN
- MdM KARTHIKEYAN
- DirectorsM KARTHIKEYAN, S BAKIYARAJ
- Project HeadM KARTHIKEYAN
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 Feb 2026
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings7 building records
- Documents filed319 files
Current status
Figures as on 15 Jul 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER A | - | - | - | 160 | 0 | 160 |
| TOWER B | - | - | - | 160 | 0 | 160 |
| TOWER C | - | - | - | 224 | 0 | 224 |
| TOWER D | - | - | - | 160 | 0 | 160 |
| TOWER E | - | - | - | 160 | 0 | 160 |
| TOWER F | - | - | - | 256 | 0 | 256 |
| TOWER G | - | - | - | 0 | 7 | 7 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 19 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 40%.
Building: 3% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 40% |
| Foundation footing work | 20% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 5% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership25
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| G S Revanna | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| G R Sampath kumar | - | - |
| Venkata Reddy M | - | - |
| Nikhil Reddy A | - | - |
| Kalpana | - | - |
| Bharathi A | - | - |
| Nikhil Reddy | - | - |
| Venkatesh V | - | - |
| Venkatesh V | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| Bharathi A | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
| MYHNA PROPERTIES PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 708.66 cr | Rs 9.03 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 87.50 cr | Rs 96.90 lakh |
| Payment of taxes | Rs 62.50 cr | Rs 1.01 cr |
| Marketing Expenses | Rs 35.43 cr | - |
| On-site expenditure-Site Overhead | Rs 30.64 cr | Rs 3.81 cr |
| On-site expenditure-Consultants Fees | Rs 18.20 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | T.N.S CHAKRAVARTHI |
| Engineer | D Gurappa |
| Chartered Accountant | Jayaram d |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed319
As listed on the registration, under the names the promoter filed them with; the newest 80 of 319 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/040226/008447 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA_VISTARA Q1 RERA CA CERTIFICATE-June'26_compressed_compressed_11zon.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: ARch_Mhyna Vistara Q1-June'26-Final.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Eng-Certificate-Vistara-June’26-Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: VISTARA FORM-4 MAR2026 Q4-CA.pdf | 23 May 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Arch_Certificate_Vistara_Mar'26-R.pdf | 23 May 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Eng-Certificate-Vistara-Mar’26-Q4.pdf | 23 May 2026 |
| Q4 2025-26 Water supply and sewage board | 23 May 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 23 May 2026 |
| Q4 2025-26 KPTCL- BESCOM | 23 May 2026 |
| Q4 2025-26 Fire and Safety | 23 May 2026 |
| Q4 2025-26 Airport Authority of India | 23 May 2026 |
| PODI MR 5-2File: PODI MR 5-2.pdf | 22 Jan 2026 |
| 5-16 T2 PODI MRFile: 5-16 T2 PODI MR.pdf | 22 Jan 2026 |
| 5-2File: 5-2.pdf | 22 Jan 2026 |
| 5-2 documentFile: 5-2 document.pdf | 22 Jan 2026 |
| Document Sy no 5-2File: Document Sy no 5-2.pdf | 22 Jan 2026 |
| 5-16 sketch documentFile: 5-16 sketch document.pdf | 22 Jan 2026 |
| 5-16 Sketch viewFile: 5-16 Sketch view.pdf | 22 Jan 2026 |
| Structural stability certificate with self attested structural engineer licenseFile: Structural stability with self attested structural engineer license.pdf | 22 Jan 2026 |
| Structural engineer licenseFile: Gurappa structural engineer license.pdf | 22 Jan 2026 |
| MPPL FINANCIALS FY2021-22File: MPPL FINANCIALS FY202122.pdf | 19 Jan 2026 |
| MPPL FINANCIALS FY2022-23File: MPPL FINANCIALS FY202223.pdf | 19 Jan 2026 |
| MPPL FINANCIALS FY2023-24File: MPPL FINANCIALS FY202324.pdf | 19 Jan 2026 |
| NO SALES CLARIFICATIONFile: REVENUE FROM SALES CLARIFICATION.pdf | 19 Jan 2026 |
| Section 3 AffidavitFile: SECTION 3 AFFIDAVIT.pdf | 19 Jan 2026 |
| EC 2-1File: 2-1.pdf | 19 Jan 2026 |
| EC 2-10File: 2-10.pdf | 19 Jan 2026 |
| EC 5-4File: 5-4.pdf | 19 Jan 2026 |
| EC 5-5File: 5-5.pdf | 19 Jan 2026 |
| EC 5-6File: 5-6.pdf | 19 Jan 2026 |
| EC 5-7File: 5-7.pdf | 19 Jan 2026 |
| EC 5-8File: 5-8.pdf | 19 Jan 2026 |
| EC 5-9File: 5-9.pdf | 19 Jan 2026 |
| EC 5-10File: 5-10.pdf | 19 Jan 2026 |
| EC 5-11File: 5-11,12,13.pdf | 19 Jan 2026 |
| EC 5-12File: 5-11,12,13.pdf | 19 Jan 2026 |
| EC 5-13File: 5-11,12,13.pdf | 19 Jan 2026 |
| EC 5-15File: 5-15.pdf | 19 Jan 2026 |
| EC 5-16File: 5-16.pdf | 19 Jan 2026 |
| EC 161-2File: 161-2.pdf | 19 Jan 2026 |
| EC 162-1 AND 162-4File: 162-1 & 4.pdf | 19 Jan 2026 |
| EC 162-2File: 162-2.pdf | 19 Jan 2026 |
| EC 162-2File: 162-2.pdf | 19 Jan 2026 |
| EC 162-3File: 162-3.pdf | 19 Jan 2026 |
| EC 162-5File: 162-5.pdf | 19 Jan 2026 |
| EC 162-6File: 162-6.pdf | 19 Jan 2026 |
| EC 163-1File: 163-1.pdf | 19 Jan 2026 |
| EC 163-1File: 163-1.pdf | 19 Jan 2026 |
| EC 163-1File: 163-1 1121_67 Sqft 01-03-2025 to 10-01-2026.pdf | 19 Jan 2026 |
| EC 163-2File: 163-2.pdf | 19 Jan 2026 |
| EC 163-3File: 163-3.pdf | 19 Jan 2026 |
| EC 164-5File: 164-5.pdf | 19 Jan 2026 |
| MR 2-1File: 2-1 MR 51 2008-09.pdf | 19 Jan 2026 |
| MR 2-10File: 2-10 MR T126-2024-2025.pdf | 19 Jan 2026 |
| MR 5-4File: 5-4 MR T6 2017-18.pdf | 19 Jan 2026 |
| MR 5-5File: 5-5 MR T162 2021-22.pdf | 19 Jan 2026 |
| MR 5-6File: 5-6 MR T34 2022-23.pdf | 19 Jan 2026 |
| MR 5-7File: 5-7 MR T161 2021-22.pdf | 19 Jan 2026 |
| MR 5-8File: 5-8 MR T181-2023-24_0001.pdf | 19 Jan 2026 |
| MR 5-9File: 5-9 MR T178-2023-24_0001.pdf | 19 Jan 2026 |
| MR 5-10File: 5-10 MR T182-2023-24_0001.pdf | 19 Jan 2026 |
| MR 5-11File: 5-11 MR T179-2023-24_0001.pdf | 19 Jan 2026 |
| MR 5-12File: 5-12 MR T183-2023-24_0001.pdf | 19 Jan 2026 |
| MR 5-13File: 5-13 MR T 180-2023-24_0001.pdf | 19 Jan 2026 |
| MR 5-15File: 5-15 MR T 11-2012-13_0001.pdf | 19 Jan 2026 |
| MR 5-16File: 5-16 MR T 34-2024-25_0001.pdf | 19 Jan 2026 |
| MR 161-2File: 161-2 MR T1-2017-18_0001.pdf | 19 Jan 2026 |
| MR 162-1File: 162-1 MR T 143-2022-23_0001.pdf | 19 Jan 2026 |
| MR 162-2File: 162-2 MR T6-2011-12_0001.pdf | 19 Jan 2026 |
| MR 162-2File: 162-2 MR T7-2011-12_0001.pdf | 19 Jan 2026 |
| MR 162-3File: 162-3 MR 289-2005-06_0001.pdf | 19 Jan 2026 |
| MR 162-4File: 162-4 MR T 50-2014-15_0001.pdf | 19 Jan 2026 |
| MR 162-5File: 162-5 MR T 125-2024-25_0001.pdf | 19 Jan 2026 |
| MR 162-6File: 162-6 MR T 94-2023-24_0001.pdf | 19 Jan 2026 |
| MR 163-1File: 163-1 MR T 40-2024-25_0001.pdf | 19 Jan 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MYHNA VISTARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 89 registered projects within 2 km.
Prestige Lavender Fields
Prestige Office Ventures
Brigade Sanctuary
Brigade Enterprises Ltd
ABHEE AARIA
ABHEE VENTURES PRIVATE LIMITED
ABHEE CITY URBAN GLENN PHASE II
ABHEE VENTURES PRIVATE LIMITED
GODREJ PARK RETREAT
Godrej Properties Limited
MANA SKANDA THE RIGHT LIFE T14-18
NEOBUILD VENTURES LLP
See every Bengaluru Urban project, with the district possession charts
Builder: MYHNA PROPERTIES PRIVATE LIMITED
MYHNA PROPERTIES PRIVATE LIMITED has 2 registrations on RERA Karnataka, including MYHNA VISTARA and MYHNA MAPLE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MYHNA VISTARA is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MYHNA VISTARA?
The registered promoter entity is MYHNA PROPERTIES PRIVATE LIMITED, a company as per the filing. Its CIN U70200KA2011PTC058719 and GSTIN 29AAHCM1928M1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MYHNA VISTARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MYHNA VISTARA?
The professionals named in the filing: Architect: T.N.S CHAKRAVARTHI; Engineer: D Gurappa; Chartered Accountant: Jayaram d. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MYHNA VISTARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.